LETTER NO. L-45-94 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 ROBERT J. PELLATT BC TOLL FREE: 1-800-663-1385 COMMISSION SECRETARY FACSIMILE: (604) 660-1102 VIA FACSIMILE December 22, 1994 Mr. John P Sheehan President & CEO British Columbia Hydro and Power Authority 333 Dunsmuir Street, 18th Floor Vancouver, B.C. V6B 5R3 Dear Mr. Sheehan: Re: Re: British Columbia Hydro and Power Authority IRP Consultative Committee The Commission is in receipt of your letter dated December 13, 1994 in which B.C. Hydro requests a one month extension of the Commission's December 15, 1994 deadline for the establishment of an IRP Consultative Committee. This deadline is stated at page 58 of the November 24, 1994 Decision. The Commission is concerned that any extensions at this early stage will lead to unacceptable delays in the production of B.C. Hydro's IRP, the deadline for which is June 30, 1995. The Commission grants an extension for establishment of the IRP Consultative Committee until December 30, 1994, but this extension has no effect on the timing of any other deadlines in the Decision. Yours truly, !~. bert J. Pellatt BMK/mmc cc: Registered Intervenors Mr. M. Moseley, Commission Counsel v v BCH/94RR/IRP-Cons!tgComm.
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.