ROBERT J. PELLATT COMMISSION SECRETARY VIA FACSIMILE Mr. D.M. Masuhara Vice President Legal and Regulatory Affairs BC Gas Utility Ltd. 1111 West Georgia Street Vancouver, B.C. V6E4M4 Dear Mr. Masuhara: Re: BC Gas Utility Ltd. Application - Deferral of Requirement to Amend Fort Nelson Rate Schedules Further to your November 30, 1995 application for Commission approval to defer making changes to the Fort Nelson Division Industrial Rate Schedules until the BC Gas filing of a comprehensive application covering Rate Design and Unbundling of Rates expected in June, 1996, the Commission approves the request. RJP/ssc o BCG/Cor/DeferChngesFtNelsonRSLETTER NO. L-61-95 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE: 1-800-663-1385 FACSIMILE: (604) 660-1102 December 12,1995 Yours truly, obert J. Pellatt
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.