LETTER NO. L-25-95 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 ROBERT J. PELLATT BC TOLL FREE: 1-800-663-1385 COMMISSION SECRETARY FACSIMILE: (604) 660-1102 June 14, 1995 Mr. G.J. Sune1l, P. Eng. Operations Manager Yoho Power Ltd. 800 - 1176 West Georgia Street Vancouver, B.C. V6E4A2 Dear Mr. Sune1l: Re: Yoho Power Ltd. Filing of 1995 Integrated Resource Plan This will acknowledge receipt of your May 9, 1995 letter requesting an exemption from the Commission with regards to filing an IRP due to the probability that B.c. Hydro would be constructing and operating a grid connection from Golden to Field, B.C., and that Yoho may cease to exist as an electrical utility should B.C. Hydro take over utility operations in Field, B.c. The Commission has reviewed this matter and advises that the requirement to file a 1995 IRP has been deferred pending the outcome of the acquisition of Yoho's Field, B.C. electric utility by B.C. Hydro and the completion of the grid connection by B.C. Hydro. Yoho is to advise the Commission, in writing, every two months on the status of the proposed grid connection and the status of the acquisition. Yours truly, RJP/yk Yoho/Cor/'95 IRP Filing
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.