Orders

Decision Information

Decision Content

LETTER NO. L-37-01 ROBERT J. PELLATT SIXTH FLOOR, 900 HOWE STREET, BOX 250 COMMISSION SECRETARY VANCOUVER, B.C. CANADA V6Z 2N3 Commission.Secretary@bcuc.com TELEPHONE: (604) 660-4700 web site: http://www.bcuc.com BC TOLL FREE: 1-800-663-1385 FACSIMILE: (604) 660-1102 Log No. 6514, 6759, 6831 VIA FACSIMILE 9, 604-623-4323 October 25, 2001 Mr. Ray Aldeguer Senior Vice President Legal and Regulatory Affairs and General Counsel British Columbia Hydro and Power Authority 333 Dunsmuir Street Vancouver, B.C. V6B 5R3 Dear Mr. Aldeguer: Re: British Columbia Hydro and Power Authority (“B.C. Hydro”) Complaint Regarding UtiliCorp Networks Canada (British Columbia) Ltd. (“UNC”) (formerly known as West Kootenay Power Ltd.) Regarding Rate Schedule 3808 and the UNC/B.C. Hydro Power Purchase Agreement This is in response to B.C. Hydros complaint of July 12, 2001 wherein B.C. Hydro requested the Commission to direct WKP not to exceed the 200 MW customer demand limit of Rate Schedule 3808 and to direct WKP to enter into negotiations for supply on market based prices if it foresaw a need for supply from B.C. Hydro in excess of the 200 MW limit. The Commission notes that UNC has completed arrangements for market based purchases, which negate the need to rely on the excess provisions of the B.C. Hydro/UNC Power Purchase Agreement. The Commission therefore does not believe B.C. Hydros concerns are warranted at this time and the Commission declines B.C. Hydros request. Nevertheless, the Commission notes that the Power Purchase Agreement contains mechanisms for dispute settlement and failing that, representation to the courts is available to settle contractual disputes. The Commission also notes that it was the intention of the Commission that the excess power provisions of the Power Purchase Agreement and the penalty provisions of Rate Schedule 3808 were designed to limit excess demand to emergency or unforeseen situations. If UNCs take under these provisions becomes excessive, the Commission would consider an application to adjust Rate Schedule 3808 to discourage this type of use on a prospective basis. Yours truly, Original signed by: Robert J. Pellatt cms cc: Mr. Robert H. Hobbs Director, Regulatory and Government Affairs UtiliCorp Networks Canada (British Columbia) Ltd. BCH/RS3808 Complaint w/UNC
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.