Orders

Decision Information

Decision Content

LETTER NO. L-7-02 ROBERT J. PELLATT SIXTH FLOOR, 900 HOWE STREET, BOX 250 COMMISSION SECRETARY VANCOUVER, B.C. CANADA V6Z 2N3 Commission.Secretary@bcuc.com TELEPHONE: (604) 660-4700 web site: http://www.bcuc.com BC TOLL FREE: 1-800-663-1385 FACSIMILE: (604) 660-1102 Log No. 348 VIA FACSIMILE February 15, 2002 Mr. David M. Masuhara Vice President, Regulatory, Environment & Safety, Supply Chain & Logistics BC Gas Utility Ltd. 24 th Floor, 1111 West Georgia Street Vancouver, B.C. V6E 4M4 Dear Mr. Masuhara: Re: BC Gas Utility Ltd. 2000 Main Extension Review Report The Commission has completed its review of the 2000 Main Extension Review Report (Amended) and accepts the report as filed. The Commission has also determined that it is no longer necessary for BC Gas to continue to file future Main Extension Review Reports. While there may be requirements in the future for the Commission to review data related to system extension tests, the Commission believes that these reviews can be carried out when triggered by a customer complaint or inquiry on an individual basis. The Commission thanks BC Gas for contributing to an important review process during the past three years. Yours truly, Original signed by: Robert J. Pellatt EC/ac BCG/Cor/Main Ext Review Rpt
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.