LETTER NO. L-37-03 ROBERT J. PELLATT SIXTH FLOOR, 900 HOWE STREET, BOX 250 COMMISSION SECRETARY VANCOUVER, B.C. CANADA V6Z 2N3 Commission.Secretary@bcuc.com TELEPHONE: (604) 660-4700 web site: http://www.bcuc.com BC TOLL FREE: 1-800-663-1385 FACSIMILE: (604) 660-1102 Log No. 3598 VIA FACSIMILE 9, 604-623-4407 July 22, 2003 Mr. Richard Stout Chief Regulatory Officer British Columbia Hydro and Power Authority 17 th Floor, 333 Dunsmuir Street Vancouver, B.C. V6B 5R3 Dear Mr. Stout: Re: British Columbia Hydro and Power Authority ___________Net Metering Tariff____________ Policy Action #20 in the recently released Energy Policy states that BC Hydro, Aquila Networks, and other investor-owned utilities will develop policies such as net metering and interconnection standards to achieve a voluntary goal to acquire 50% of new supply from BC Clean Electricity over the next 10 years. On December 10, 2002 Mr. Wheatley and others applied to the Commission for a change to BC Hydros standard metering practices to include a limited and simple form of net metering,” citing Policy Action #20. Mr. Wheatley et al. proposed a similar change in October 2001, but the Commission, with input from BC Hydro, deferred consideration of net metering until after the release of the Energy Policy. In response to Mr. Wheatleys renewed application, the Commission requested that BC Hydro prepare, in consultation with customer groups and other utilities such as Aquila Networks, a report to assess the merits of a net metering policy. The Commissions request was based in part on the new Energy Policy, which makes a clear directive for utilities to develop policies to support the voluntary goal of acquiring 50% of new supply from BC Clean Electricity over the next 10 years. On June 27, 2003, as per the Commissions request, BC Hydro submitted its final report, Net Metering in British Columbia, a white paper prepared by Compass Resource Management Ltd. BC Hydro also submitted written comment on the report, and on net metering in general, from various interest groups and individuals. …/2
2 LETTER NO. L-37-03 On the basis of the report, BC Hydro concludes that although net metering of small generators is unlikely to produce significant quantities of clean energy in a cost-effective way, there are reasons to consider its implementation since it provides customers with the means to take responsibility for their own power production and to lower their environmental impact. The Commission has considered the findings of the report, the submissions of the various interested groups, and BC Hydros conclusions. The Commission supports the concept of net metering in general. The Commission agrees that net metering is not likely to be developed to a great extent in B.C. given our low electricity rates presently. In the current pricing environment the Commission expects that net metering in B.C. would not impose any material costs on non-participating ratepayers. The Commission recommends the development and implementation of a net metering tariff. However, given that a small amount of energy will likely be involved, the Commissions support for a net metering tariff is conditional on development and implementation that does not incur any substantial cost on the utility, and that does not impose any inordinate barrier to ratepayers seeking to net meter. Therefore, the Commission directs BC Hydro to prepare an application for a simple net metering tariff, with at minimum the following parameters: It should be available to the residential and commercial customer classes. It should be applicable only to clean energy projects, as defined in the BC Governments Energy Policy. It should be applicable to generation of 50 kW or less. Interconnection must be safe, but the rules governing interconnection should not be extensive, nor burdensome in administrative process. BC Hydro should consult with other agencies and interest groups as appropriate. Customer generation should be limited to own use only at the registered location of the net metering installation. In determining consumption charges, net excess generation may be banked as a credit to the customers account to be applied against future net consumption. …/3
3 LETTER NO. L-37-03 The Commission agrees with BC Hydro that at a pre-determined anniversary date net excess generation should be transferred to BC Hydro, but it is not convinced, even in light of the lower quality energy likely available from net metering in B.C., that this transfer of energy should come at zero cost to BC Hydro. The Commission recommends that BC Hydro propose a rate for purchase of net excess generation on a given anniversary date and consult further with interested groups as necessary to develop its proposal in this regard. Upon implementation of the net metering tariff, the Commission will actively monitor the uptake of net metering installations and develop as necessary a process to review the success of the net metering tariff, including an assessment of the impacts of net metering in B.C. on non-participating customers. BC Hydro should submit its application for a net metering tariff for Commission approval by November 3, 2003. Yours truly, Original signed by: Robert J. Pellatt RG/cms cc: Steven Baillie, stevebaillie@shaw.ca Gary Birch, offthegrid@shaw.ca Mike Cannon, mcannon@spsenergy.com Scott Davis, scottdavis@forebc.com Guy Dauncey, guydauncey@earthfuture.com Michael Doherty, The British Columbia Public Interest Advocacy Centre, mdoherty@bcpiac.com Dermot Foley, David Suzuki Foundation, dfoley@davidsuzuki.org Graydon Givson, norsal@shaw.ca George Isherwood, Aquila Networks Canada (British Columbia) Ltd., george.isherwood@aquila.com , lavern.humphrey@aquila.com Anita Murray-Hill, anita@mhlconsulting.com Bonnie Mae Newsmall, bon@forebc.com Kevin Pegg, kpegg@energyalternatives.ca Kees Schaddelee, Chandra Crowe and family, chandrankees@pacificcoast.net Randyn Seibold, biocrew@shaw.ca Patrick Spearing, Patrick@SolarThermal.com Michael Wheatley, wheatley@pine.com Ronan White, ronan@energyoptionsltd.com Paul Willis, Independent Power Association of BC, pwillis@willisenergy.com BCH/Cor/Net Metering Tariff 2003
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.