LETTER NO. L-43-03 SIXTH FLOOR, 900 HOWE STREET, BOX 250 ROBERT J. PELLATT VANCOUVER, B.C. CANADA V6Z 2N3 COMMISSION SECRETARY TELEPHONE: (604) 660-4700 Commission.Secretary@bcuc.com BC TOLL FREE: 1-800-663-1385 web site: http://www.bcuc.com FACSIMILE: (604) 660-1102 Log No. 4106, 3012-00 VIA FACSIMILE (403) 298-2211 September 15, 2003 Mr. Daryl Cook Vice President, Operations EnerMark Inc. Western Canada Place 1900 - 700 - 9 th Avenue S.W. Calgary, Alberta T2P 4B3 Dear Mr. Cook: Re: Inga Oil Transmission Pipeline Regulation of Intraprovincial Oil Pipelines By letter dated August 1, 2000 the Enerplus Group informed the Commission that Pursuit Resources Corp., Aztec Resources Corp. and Newcal Energy Inc. were amalgamating into EnerMark Inc. effective July 1, 2000. Newcal Energy Inc. had been providing annual forecast statements and variance reports to the Commission on the Inga Oil Transmission Pipeline with the most recent report filed on March 8, 2000. By letter dated June 23, 2003 (copy attached) Commission staff requested that EnerMark Inc. file the actual results for the Inga Oil Transmission Pipeline for 2000, 2001, 2002 and a forecast for 2003. To date the reports have not been received. The Commission directs EnerMark Inc. to file the reports for 2000 to 2003 by October 31, 2003. Yours truly, Original signed by: Robert J. Pellatt PWN/mm Enclosure OILP/EnerMark/IngaOilTransPL L43-03
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.