LETTER NO. L-10-03 ROBERT J. PELLATT SIXTH FLOOR, 900 HOWE STREET, BOX 250 COMMISSION SECRETARY VANCOUVER, B.C. CANADA V6Z 2N3 Commission.Secretary@bcuc.com TELEPHONE: (604) 660-4700 web site: http://www.bcuc.com BC TOLL FREE: 1-800-663-1385 FACSIMILE: (604) 660-1102 Log No. 2150 VIA FACSIMILE (250) 365-6414 March 25, 2003 Mr. Ron Ross, P.Eng. Emco Engineering Ltd. 186 Columbia Avenue Castlegar, B.C. V1N 1A9 Dear Mr. Ross: Re: Pope & Talbot Grand Forks, BC Bypass Rate Application - Emco File No. 0277A On December 18, 2002, Emco Engineering Ltd. submitted a Bypass Rate Application to the Commission on behalf of Pope & Talbot Ltd. Pope & Talbot is applying for permission to build a 60 kV/4.16 kV substation in Grand Forks and move from Aquila Networks Rate Schedule 30 (Large General Service Primary) to Rate Schedule 31 (Large General Service Transmission). The Application outlines Pope & Talbots cost of bypass and the associated cost savings expected over the next 20 years, assuming 3 percent annual load growth. Aquilas five-year distribution plan does not provide for any material expenditure on the existing substation that serves Pope & Talbot. Future expenditures on the substation are likely to be condition related, rather than load related. Moreover, Aquila anticipates very low growth rates in distribution service in the Grand Forks area. Aquilas incremental cost of serving Pope & Talbot under Rate Schedule 30 is not significant. Aquila does not oppose Pope & Talbots Application and would serve them under Rate Schedule 31 if they construct the substation. Aquila is concerned that the quality of Pope & Talbots power supply will be reduced given that the proposed bypass facility would utilize a 38-year old transformer. In the event that this transformer fails, Aquila notes that it is not obligated to supply backup, but would do so on commercial terms only. Aquila has provided revised cost estimates to the Pope & Talbot Application based on adjustments to a number of underlying assumptions, such as interconnection costs, protection requirements and the cost of capital. Pope & Talbot considers that it would be worthwhile to have Aquila provide them their detailed cost estimates in order to facilitate discussion of significant differences on an item by item basis. A key …/2
2 LETTER NO. L-10-03 outstanding issue for Aquila is that Pope & Talbot does not include an estimate of the expected cost of backup to explicitly account for the risk of the 38-year old transformer failing. Pope and Talbots cost of bypass exceeds Aquilas incremental cost of service. Based on this and considering the issue of backup supply that underlies this application, the Commission recommends that Pope & Talbot and Aquila negotiate a Bypass Rate and submit this rate to the Commission for final approval. Negotiation will allow the parties to resolve differences in their respective cost estimates and offer them an opportunity to agree on the expected cost of backup, given the risk of the transformer failing. In this context a negotiated Bypass Rate can be considered a rider to be added to Rate Schedule 31. The Bypass Rate should equal Pope & Talbots cost of bypass all told and be payable to Aquila over the expected life of the proposed bypass facility, financed at Pope & Talbots weighted average cost of capital. The Commission agrees that this Application is essentially a quality of supply issue. Pope & Talbot is seeking to reduce costs by obtaining lower quality service. Aquila does not oppose their application and would serve them under Rate Schedule 31 if the proposed facility was built. The Commission expects that if the proposed bypass facility was built it would not impose costs on Aquilas other customers, provided it does not fail over its expected life. Therefore, the Commission recommends that if the parties cannot agree to a negotiated bypass rate, Pope & Talbot be allowed to construct and operate the proposed bypass facility under the condition that if backup is required, Pope & Talbot be required to pay all of the costs of backup to Aquila under terms agreed to by the parties in advance. Yours truly, Original signed by: Robert J. Pellatt RG/cms cc: Mr. George Isherwood Regulatory Affairs Executive Aquila Networks Canada (British Columbia) Ltd. Mr. Andrew Horahan Sawmill Superintendent Pope & Talbot, PO Box 39 Grand Forks, BC V0H 1H0 MisCor/PopeTalbot-Bypass Rate Applc
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.