SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. V6Z 2N3 CANADA web site: http://www.bcuc.com IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473 and An Application by Terasen Gas Inc. (formerly known as BC Gas Utility Ltd.) for Approval of a Multi-Year Performance-Based Rate Plan to Set Rates for 2004-2008 BEFORE: P. Ostergaard, Chair R.H. Hobbs, Commissioner R.D. Deane, Commissioner ) O R D E R WHEREAS: A. In accordance with the determinations from the 2003 Revenue Requirements Decision, Terasen Gas Inc. (formerly BC Gas Utility Ltd.) (“Terasen Gas”) applied to the Commission on April 17, 2003 for approval of its Multi-Year Performance-Based Rate Plan (“the PBR Plan”) to set rates for 2004 to 2008 pursuant to Sections 58 and 61 of the Utilities Commission Act (“the Act”), (“the Application”); and B. Commission Order No. G-29-03 established a Workshop and Pre-hearing Conference for the Application and proposed a regulatory timetable for information requests, information responses and the commencement of negotiations; and C. The participants at the Pre-hearing Conference did not oppose the regulatory timetable proposed in Order No. G-29-03; and D. The Commission requires that a regulatory timetable for the review of the Application be established. NOW THEREFORE the Commission orders that the Regulatory Timetable attached as Appendix A be established for the review of the Terasen Application. DATED at the City of Vancouver, in the Province of British Columbia, this 22 Attachment Orders/TGI_2004-08 NSP TimetableB R I T I S H C O L U M B I A U T IL I T I E S C O M M I S S I O N O R D ER N U M B E R G-38-03 TELEPHONE: (604) 660-4700 BC TOLL FREE: 1-800-663-1385 FACSIMILE: (604) 660-1102 ) ) May 20, 2003 nd day of May 2003. BY ORDER Original signed by: Peter Ostergaard Chair
APPENDIX A to Order No. G-38-03 Page 1 of 1 An Application by Terasen Gas Inc. (formerly known as BC Gas Utility Ltd.) for Approval of a Multi-Year Performance-Based Rate Plan to Set Rates for 2004-2008 REGULATORY AGENDA ACTION DATES (2003) Information Requests Issued Friday, May 23 Information Responses Friday, May 30 Negotiations commence Monday, June 9 Location for Negotiations Time: 9:00 a.m. Date: Monday, June 9, 2003 British Columbia Utilities Commission Hearing Room 6 th Floor, 900 Howe Street
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.