March 30, 2004
Mr. Scott Thomson
Vice President, Finance and Regulatory Affairs
Terasen Gas Inc.
16705 Fraser Highway
Surrey, B.C. V3S 2X7
Dear Mr. Thomson:
Re: Terasen Gas (Vancouver Island) Inc. (“TGVI”)
Gas Supply Strategy for Thermal Generation on Vancouver Island
Deferral Account Approved by Order No. G-69-03
This letter is in response to your March 10, 2004 letter, which provided an Update Report on the preliminary
investigation of a gas supply strategy for thermal generation on Vancouver Island as required by Order No. G-69-
03 and which requested authorization of an increase in deferral account funds to a total of $2,860,000.
Commission Order No. G-69-03 approved a deferral account to record up to $945,000 of preliminary
investigation expenditures through January 2004, with the prudency of the expenditures and the disposition of the
amount in the deferral account to be determined at a later date. The January 2004 date was subsequently extended
by letter dated February 19, 2004 to March 31, 2004. The cover letter to the Order anticipated that the
expenditures that were the subject of Letter No. L-27-03 would also be recorded in the deferral account. The next
Update Report should outline such earlier expenditures.
The Negotiated Settlement of TGVI’s 2003-05 Revenue Requirements requires TGVI to obtain a commitment
from a customer for reimbursement of costs where detailed project costs and engineering designs are required, and
the project does not proceed. As there is no customer requesting service, the Commission indicated in the cover
letter to Order No. G-69-03 that it expected that TGVI would minimize the amount of detailed design work on the
gas supply strategy while remaining consistent with its desire to advance the development of the strategy.
The March 10, 2004 Update Report outlines progress to date, including identification of a site for liquefied
natural gas (“LNG”) storage, and indicates actual expenditures of $575,000 to February 29, 2004. Expenditures
in March through June 2004 are estimated at $1,570,000 and those in July through September 2004 are estimated
at $715,000, for a total of $2,860,000.
The Resource Plan that TGVI intends to file in May 2004 should provide insight into the value of LNG storage.
BC Hydro recently revised the schedule of its Call for Tenders (“CFT”) for generation on Vancouver Island and
expects to announce the preferred option on October 8, 2004. This is close to the end of the period that is covered
by the work program and expenditures that TGVI proposed in its March 10
th
letter. TGVI indicates that the work
proposed for 2004 is necessary in order to be able to award the Engineer/Procure/Construct contract for the LNG
project in January 2005 and to, if approved, complete the facilities by November 2007.
…/2
LETTER NO. L-21-03
2
The estimated expenditures for the period through September 2004 cover three main areas. External costs related
to a LNG storage facility total $1,949,000. External costs related to increasing and upgrading compression on the
TGVI system total $425,000. Costs that are internal to the Terasen Inc. group of companies are forecast at
$486,000. Although the prudency and disposition of amounts recorded in the deferral account will be reviewed at
a future date, the Commission has concerns about some of the expenditures that TGVI proposes to record. The
Commission is of the view that approved Operating, Maintenance and Administrative expenses generally should
cover system planning activities to handle ongoing load growth on the utility system. Moreover, the Commission
considers that deferral account treatment is not appropriate for development costs that are internal to the group of
affiliated companies, particularly considering the steps that are currently underway to consolidate the operations
of TGVI and Terasen Gas Inc.
For the foregoing reasons, the Commission directs that the expenditures to be recorded in the subject deferral
account will be limited to external expenditures that relate to a proposed LNG storage facility on Vancouver
Island. Consistent with this view, the Commission approves an increase to $1,949,000 (plus expenditures related
to Letter No. L-27-03 if not included in the $575,000 figure) as the amount of preliminary investigation
expenditures to be recorded in the deferral account approved by Order No. G-69-03.
In order that the Commission can monitor progress on the preliminary investigation, TGVI is requested to file
progress reports at two month intervals that provide updates on the work program and cost estimates and identify
expenditures to date. Progress reports should be filed at the end of May, July and September 2004.
In the event TGVI becomes aware that it likely will not be transporting significant volumes of gas to Vancouver
Island for new gas-fired generation (e.g. when BC Hydro announces the pre-qualified bidders for the CFT on
April 30, 2004), TGVI will be expected to immediately re-evaluate whether it should curtail work on the
investigation and to provide a report on the situation to the Commission.
Yours truly,
Original signed by:
Robert J. Pellatt
JBW/cms
TGVI/LNG Preliminary Investigation Deferral Acct