BRITISH COL UMBIA UTILITIES COM MISSION ORDER NUMBER G -9-04 SIXTH FLOOR, 900 HOWE STREET, BOX 250 TELEPHONE: (604) 660-4700 VANCOUVER, B.C. V6Z 2N3 CANADA BC TOLL FREE: 1-800-663-1385 web site: http://www.bcuc.com FACSIMILE: (604) 660-1102 IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473 and British Columbia Hydro and Power Authority Application for a Reconsideration of the June 5, 2003 Decision in the matter of Centra Gas British Columbia Inc. 2002 Rate Design Application BEFORE: R.H. Hobbs, Chair ) L.A. Boychuk, Commissioner ) January 21, 2004 R.J. Milbourne, Commissioner ) O R D E R WHEREAS: A. On December 24, 2003, the Commission issued Order No. G-87-03 establishing a timetable in the matter of a September 30, 2003 British Columbia Hydro and Power Authority (“BC Hydro”) Application to the Commission for reconsideration and variance of certain parts of the Commission’s Decision concerning the 2002 Rate Design Application of Centra Gas British Columbia Inc. [now Terasen Gas (Vancouver Island) Inc.]; and B. In a letter dated January 14, 2004, counsel for BC Hydro requested an amendment to the timetable set out in Order No. G-87-03; and C. Counsel for Terasen Gas (Vancouver Island) Inc. has agreed to the timetable proposed. NOW THEREFORE the Commission orders as follows: 1. The Commission amends the schedule for filing of Intervenor Argument and BC Hydro Reply Argument according to the following schedule: . . . 2
BRITISH COLUMBIA UTILITIES COMMISSION ORDER NUMBER G-9-04 2 BC Hydro Argument January 19, 2004 (unchanged) Intervenor Argument February 6, 2004 BC Hydro Reply Argument February 13, 2004 DATED at the City of Vancouver, in the Province of British Columbia, this 27 th day of January 2004. BY ORDER Original signed by: Robert H. Hobbs Chair Orders/TGVI/2002RD Rcnsdr/Amnd Schd BCH Filings
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.