Orders

Decision Information

Decision Content

SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. V6Z 2N3 CANADA web site: http://www.bcuc.com IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473 and Commission Order No. G-84-92 BEFORE: L.F. Kelsey, Commissioner K.L. Hall, Commissioner O R D E R WHEREAS: A. On September 15, 1992 the Commission, by Order No. G-84-92, established, in the context of the review of an application by BC Gas Inc. (now known as Terasen Gas Inc.), a set of criteria for the reconsideration by the Commission of previous Commission Decisions or Orders; and B. Those criteria have subsequently evolved into generic guidelines which are published in the Commissions Regulatory Practices Manual; and C. The Commission has reviewed Order No. G-84-92 and finds that it is no longer required. NOW THEREFORE the Commission rescinds Order No. G-84-92. DATED at the City of Vancouver, in the Province of British Columbia, this 11 Orders/Rescind Order #G-84-92 BRITISH COL UMBIA UTILITIES COM MISSION ORDER N UMBER G -55-04 TELEPHONE: (604) 660-4700 BC TOLL FREE: 1-800-663-1385 FACSIMILE: (604) 660-1102 ) ) June10, 2004 th day of June 2004. BY ORDER Original signed by: L. F. Kelsey Commissioner
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.