Orders

Decision Information

Decision Content

LETTER NO. L-42-05 SIXTH FLOOR, 900 HOWE STREET, BOX 250 ROBERT J. PELLATT VANCOUVER, B.C. CANADA V6Z 2N3 COMMISSION SECRETARY TELEPHONE: (604) 660-4700 Commission.Secretary@bcuc.com BC TOLL FREE: 1-800-663-1385 web site: http://www.bcuc.com FACSIMILE: (604) 660-1102 Log No. 10202 VIA E-MAIL regulatory.group@bchydro.com June 21, 2005 Mr. Tony Morris Acting Chief Regulatory Officer British Columbia Hydro and Power Authority 17 th Floor, 333 Dunsmuir Street Vancouver, B.C. V6B 5R3 Dear Mr. Morris: Re: British Columbia Hydro and Power Authority (“BC Hydro”) Net Metering Monitoring and Evaluation Report Rate Schedule 1289 The Commission is in receipt of BC Hydros Rate Schedule 1289 Net Metering Monitoring and Evaluation Report (“Report”), filed on June 1, 2005. BC Hydro proposes to change the site acceptance verification requirements of the net metering program. It anticipates filing its proposed change for approval with the Commission in the coming weeks. The Commission will establish a process to review both the proposed change and the Report at such time as it receives the anticipated filing. Yours truly, Original signed by: Robert J. Pellatt RJP/yl cc: Intervenors: As per BCUC Intervenor List of January 6, 2004 (attached) Mr. Graham Horn, Planit Management Inc. BCH/Cor/Net Metering Report
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.