LETTER NO. L-61-06 SIXTH FLOOR, 900 HOWE STREET, BOX 250 ROBERT J. PELLATT VANCOUVER, B.C. CANADA V6Z 2N3 COMMISSION SECRETARY TELEPHONE: (604) 660-4700 Commission.Secretary@bcuc.com BC TOLL FREE: 1-800-663-1385 web site: http://www.bcuc.com FACSIMILE: (604) 660-1102 Log No. 16131 VIA E-MAIL regulatory.affairs@terasengas.com October 5, 2006 Mr. Scott Thomson Vice President, Finance and Regulatory Affairs Terasen Gas Inc. 16705 Fraser Highway Surrey, BC V4N 0E8 Dear Mr. Thomson: Re: Terasen Gas Inc. (“Terasen Gas”) Update of Fuel Gas Ratios to the Approved 2006/2007 Annual Contracting Plan Commission Letter No. L-33-06 Commission Letter No. L-33-06 accepted for Terasen Gas the 2006/07 Annual Gas Contracting Plan and fuel rates for fuel delivered by marketers to Terasen Gas. The accepted fuel rates were 3% and 1% for Station 2 and AECO/NIT respectively. This has resulted in fuel gas overcollection of 10.3% for the period November 2004 to August 2006. On September 18, 2006, Terasen Gas applied to the Commission to have the fuel rates adjusted as 5.87 PJ of fuel gas was budgeted and only 5.27 PJ was actually required. Terasen Gas proposes that the fuel rates for Station 2 and AECO/NIT change to 2.2% and 1% respectively. The Commission considers that a change to the fuel rates for Terasen Gas is required and accepts the ratios for Station 2 and AECO/NIT of 2.2% and 1% respectively. Gas marketers should take note of this change as they are directly affected by these amendments, and Terasen Gas is requested to forward a copy of this Letter to each gas marketer. Yours truly, Original signed by Robert J. Pellatt RJP/dlf TGI/Cor/L-61-06_06-07AnnContractingPlan
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.