Orders

Decision Information

Decision Content

SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. V6Z 2N3 CANADA web site: http://www.bcuc.com IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473 and British Columbia Transmission Corporation Application for Network Economy and Open Access Transmission Tariff BEFORE: L.A. OHara, Commissioner O R D E R WHEREAS: A. British Columbia Transmission Corporation (“BCTC”) filed on March 1, 2006, pursuant to sections 58 to 61 of the Utilities Commission Act, an application for approval of tariff terms and conditions related to the provision of Network Service (“the Application”); and B. Following a Procedural Conference on April 19, 2006, established by Commission Order No. G-33-06, the Commission Panel issued Order No. G-50-06 establishing a regulatory timetable; and C. Commission Order No. G-82-06 amended the regulatory timetable including the timing of a second Procedural Conference; and D. Following the second Procedural Conference held on August 24, 2006, the Commission has determined that further amendments to the timetable and certain other directions are required. NOW THEREFORE the Commission orders as follows: 1. The Commission Panel attaches to this Order an amended and expanded Regulatory Timetable for further steps in this proceeding. BRITISH COL UMBIA UTILITIES COM MISSION ORDER NUMBER G -105-06 TELEPHONE: (604) 660-4700 BC TOLL FREE: 1-800-663-1385 FACSIMILE: (604) 660-1102 August 29, 2006 …/2
2 2. The order of witness panels will be BCTC first, followed by British Columbia Hydro and Power Authority (“BC Hydro”), followed by the Alberta Coalition. 3. The timing of written submissions regarding BC Hydros August 11, 2006 request (Exhibit C7-10) for a direction compelling a response from the Alberta Coalition to a BC Hydro information request is set out in the attached timetable. 4. BCTC is directed to file its weekly reports on network economy usage as part of the record in this proceeding. DATED at the City of Vancouver, in the Province of British Columbia, this 29 Attachment Orders/BCTC-NEOATT_Amended Regulatory Timetable BRITISH COLUMBIA UTILITIES COMMISSION ORDER NUMBER G-105-06 th day of August 2006. BY ORDER Original signed by: L.A. OHara Commissioner
SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. V6Z 2N3 CANADA web site: http://www.bcuc.com British Columbia Transmission Corporation Application for Network Economy and Open Access Transmission Tariff AMENDED REGULATORY TIMETABLE Action Filing of BC Hydro Submission regarding the Information Request response of the Alberta Monday, August 28, 2006 Coalition Filing of Response from the Alberta Coalition Filing of Reply by BC Hydro Negotiated Settlement Process (if necessary) 10:00 a.m. Wednesday - Friday, September 6-8, 2006 12 Filing of Direct Evidence Filing of Rebuttal Evidence Oral Public Hearing commences (if necessary) 10:00 a.m. Tuesday, October 10, 2006 12 APPENDIX A to Order No. G-105-06 Page 1 of 1 TELEPHONE: (604) 660-4700 BC TOLL FREE: 1-800-663-1385 FACSIMILE: (604) 660-1102 Date Time - Location Wednesday, August 30, 2006 Thursday, August 31, 2006 th Floor 1125 Howe St., Vancouver Monday, September 11, 2006 Monday, September 18, 2006 th Floor - 1125 Howe Street, Vancouver
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.