BRITISH COL UMBIA
UTILITIES COM MISSION
ORDER
NUMBER
G -110-07
SIXTH FLOOR, 900 HOWE STREET, BOX 250
TELEPHONE: (604) 660-4700
VANCOUVER, B.C. V6Z 2N3 CANADA
BC TOLL FREE: 1-800-663-1385
web site: http://www.bcuc.com
FACSIMILE: (604) 660-1102
IN THE MATTER OF
the Utilities Commission Act, R.S.B.C. 1996, Chapter 473
and
An Application by FortisBC Inc.
for a Certificate of Public Convenience and Necessity
for the Ootischenia Substation Project
BEFORE:
A.W.K. Anderson,
Panel Chair & Commissioner
September 18, 2007
N.F. Nicholls, Commissioner
O R D E R
WHEREAS:
A. On September 7, 2007 FortisBC Inc. (“FortisBC”) applied (the “Application”) to the British Columbia
Utilities Commission (“Commission”) for a Certificate of Public Convenience and Necessity (“CPCN”) for
the Ootischenia Substation Project (“the Project”); and
B. FortisBC states that the Project is estimated to cost $8.16 million and is required to serve the growing load in
the Castlegar area, as well as to meet system backup planning criteria under contingency conditions; and
C. The Project consists of a new distribution substation, with a 63 kV/13 kV 16 MVA transformer and
connection to two distribution feeder circuits; and
D. The Project is scheduled to go into service in the fourth quarter of 2008; and
E. The Application states that FortisBC used newspaper advertisements, meetings with local government and
key stakeholders, letters to local residents, a web page for the Project, and open houses on May 9 and 10,
2007 to obtain feedback on the Project plan; and
F. Approximately 40 people attended the open houses; and
. . ./2
2
G. The Commission has determined that an oral public hearing is required to hear submissions on the regulatory
process for the review of the Application.
NOW THEREFORE the Commission orders as follows:
1. The Commission establishes an oral public hearing for the regulatory review of the Application, commencing
on Wednesday, November 14, 2007, at 9:00 a.m. in the Sandman Hotel in Castlegar, BC. The Regulatory
Timetable for the proceeding is attached as Appendix A to this Order.
2. Intervenors and Interested Parties will register with the Commission, in writing, by Monday, October 15,
2007. Intervenors are requested to specifically state the nature of their interest in the Application and to
identify the issues that they intend to pursue during the proceeding.
3. FortisBC will publish, as soon as possible, in display-ad format, the Notice of Oral Public Hearing attached as
Appendix B to this Order in such appropriate local news publications as may properly provide adequate
notice to the public in Ootischenia and the Castlegar area.
4. The Application together with any supporting materials, will be made available for inspection at the FortisBC
Kelowna Head Office, and at the Commission’s office.
5. FortisBC will use reasonable efforts to provide a copy of this Order and the Executive Summary from the
Application to local government and key stakeholders, persons who attended the open houses, and
landowners within a 500 metre radius of the proposed site.
DATED at the City of Vancouver, in the Province of British Columbia, this 20
Attachments
Orders/G-110-07_FortisBC_Ootischenia CPCN-RegTmble
BRITISH COLUMBIA
UTILITIES COMMISSION
ORDER
NUMBER
G-110-07
th
day of September 2007.
BY ORDER
Original signed by:
A.W.K. Anderson
Panel Chair & Commissioner
SIXTH FLOOR, 900 HOWE STREET, BOX 250
VANCOUVER, B.C. V6Z 2N3 CANADA
web site: http://www.bcuc.com
FORTISBC INC.
Certificate of Public Convenience and Necessity Application
for the Ootischenia Substation Project
REGULATORY TIMETABLE
ACTION
Commission Information Requests to FortisBC
Intervenor and Interested Party Registration
FortisBC Responses to Commission Information Requests
Intervenor Information Requests to FortisBC
Commission Draft Issues List
Intervenor Comments on Draft Issues List
FortisBC Responses to Intervenor Information Requests
FortisBC Comments on Draft Issues List
Commission Issues List
Oral Hearing Commences in Castlegar
APPENDIX A
to Order No. G-110-07
Page 1 of 1
TELEPHONE: (604) 660-4700
BC TOLL FREE: 1-800-663-1385
FACSIMILE: (604) 660-1102
DATE (2007)
Wednesday, October 10
Monday, October 15
Friday, October 19
Wednesday, October 24
Monday, October 29
Thursday, November 1
Monday, November 5
Tuesday, November 6
Thursday, November 8
Wednesday, November 14
APPENDIX B
to Order No. G-110-07
Page 1 of 2
SIXTH FLOOR, 900 HOWE STREET, BOX 250
TELEPHONE: (604) 660-4700
VANCOUVER, B.C. V6Z 2N3 CANADA
BC TOLL FREE: 1-800-663-1385
FACSIMILE: (604) 660-1102
web site: http://www.bcuc.com
FORTISBC INC.
CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY APPLICATION
FOR THE OOTISCHENIA SUBSTATION PROJECT
NOTICE OF ORAL PUBLIC HEARING
DATE:
Wednesday, November 14, 2007
TIME:
9:00 a.m.
LOCATION:
Sandman Hotel
1944 Columbia Avenue
Castlegar, BC
Tel: (250) 365-8444
THE APPLICATION
On September 7, 2007, FortisBC Inc. applied to the British Columbia Utilities Commission for approval of a
Certificate of Public Convenience and Necessity to construct and operate the proposed Ootischenia Substation
Project. The new substation will consist of one transformer, and connections to two 63 kilovolt (“kV”)
transmission lines and two distribution feeders. FortisBC proposes to build the substation in Ootischenia, east
across Ootischenia Road from the south end of the Airport, and between the rights-of-way for the 230 kV and
63 kV transmission lines.
The Project is estimated to cost $8.16 million, and is proposed to go into service in the fourth quarter of 2008.
The Application states the substation is required to serve the growing load in the Castlegar area, and to provide
adequate backup for customers in the area.
THE REGULATORY PROCESS
Commission Order No. G-110-07 established an oral public hearing for the review of the Application,
commencing at 9:00 a.m. on Wednesday, November 14, 2007 in the Sandman Hotel in Castlegar. The Regulatory
Timetable for the proceeding is available on the Commission’s web site.
INTERVENTIONS
Persons who expect to actively participate in the FortisBC proceeding should register as Intervenors with the
Commission, in writing, by Monday, October 15, 2007. Intervenors are requested to specifically state the nature
of their interest in the Application and identify the issues that they intend to pursue during the proceeding.
Intervenors will receive copies of the Application as well as all correspondence and filed documentation and
should provide an e-mail address if available.
APPENDIX B
to Order No. G-110-07
Page 2 of 2
Persons not expecting to actively participate in the proceeding, but who have an interest in the Project, should
register as Interested Parties with the Commission, in writing, by Monday, October 15, 2007, identifying their
interest in the Application. Interested Parties will receive a copy of the Executive Summary of the Application
and all Orders issued.
All submissions and/or correspondence received from active participants or the general public relating to the
Application will be placed on the public record and posted to the Commission’s web site.
PUBLIC INSPECTION OF THE DOCUMENTS
The Application and supporting materials will be available for inspection at the following locations:
FortisBC Inc.
British Columbia Utilities Commission
Head Office
Sixth Floor, 900 Howe Street
Fifth Floor 1628 Dickson Avenue
Vancouver, BC V6Z 2N3
Kelowna, B.C. V1Y 9X1
Telephone: 1-800-663-1385
http://www.fortisbc.com
http://www.bcuc.com
FortisBC Inc.
Trail Office
1290 Esplanade
Trail, B.C. V1R 4L4
FURTHER INFORMATION
For further information, please contact the Commission Secretary, Ms. Erica Hamilton or Mr. Donald Flintoff,
Senior Electrical Engineer as follows:
Commission Secretary
Mr. Donald Flintoff
Telephone: (604) 660-4700
Email: don.flintoff@bcuc.com
Facsimile: (604) 660-1102
Telephone: (604) 660-4700
E-mail: Commission.Secretary@bcuc.com
BC Toll Free: 1-800-663-1385
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.