Orders

Decision Information

Decision Content

  BRIT ISH  COLU MBIA   UTIL IT IES  COM MISSION         ORDER     NUMBER   G 12308      SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3   CANADA  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com FACSIMILE:  (604)  6601102   IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    An Application by British Columbia Transmission Corporation (“BCTC”)  for Approval to Incur Capital Expenditures to Interconnect the Independent Power Producers’  Combined Clowhom River and Bear Creek Projects to the  British Columbia Transmission Corporation Transmission System    BEFORE L.FKelseyCommissioner    P.EVivianCommissioner  August 282008    O  R  D  E  R  WHEREAS   A On July 152008pursuant to Section 44.2(3of the Utilities Commission Amendment Act2008  (“Amendment Act”) and Order G6907 for public interest approval for capital expenditures associated with  the interconnection facilities for the Bear Creek Power ProjectBCTC filed an Application for approval to  incur capital expenditures to interconnect Bear Creek Power Project to the BCTC transmission system   B The Bear Creek Power Project (the “Project”) is a 20 MW multigenerator facility to be located near Sechelt  on the Sunshine Coast of British Columbiathe Project proponents have entered into an Electricity Purchase  Agreement with British Columbia Hydro and Power Authority (“BC Hydro”) in its 2002/2003 Green Power  Generation Call for Tendersand    C In its first Transmission System Capital Plan filed in May 2004BCTC included the expenditures to connect  the Project to its transmission grid that were approved by Commission Order G10304and    D BCTC filed its F2006 Transmission System Capital Plan on March 232005 that requestedamong other  thingspublic interest approval for 23 projects relating to the interconnection of Independent Power  Producers (“IPPs”) to the transmission system that were originally approved through Order G10304 andat  that timethe estimated cost of the Bear Creek facilities was $2.414 million excluding GST and including the  cost of Direct Assignment Facilities that are funded by the Project proponent and the Network Upgrades and 
        BRIT ISH  COLUMBIA     UTIL IT IES  COMMISSION               ORDER      NUMBER   G12308   2        E On April 122005 the Project proponents entered into an Interconnection Impact Study and Facilities Study  Agreement for the Bear Creek Hydro Energy Project and as a result of this study agreementthe Project  proponent is grandfathered from compliance with Section 5.1.2 of Attachment M to the Open Access  Transmission Tariff (“OATT”) in accordance with Order G5805 dated June 192005and    F In its Decision dated June 192005the Commission approved BCTCs proposalas revisedfor relief for BC  Hydro from OATTs interconnection procedures for its 2005 Competitive Electricity Acquisition Processthus  grandfathering the Clowhom River Project from compliance with Section 5.1.2 of Attachment M to the OATT  in accordance with Order G5805 dated June 192005and    G In its Decision dated September 232005 and Order G9105the Commission accepted BCTCs IPP  interconnection assumptions in developing the F2006 Capital Plandetermined that the F2006 Capital Plan  met the requirements of Sections 45(6and 45(6.1of the Actand ordered BCTC to comply with the findings  and directives set out in the Decision and there were no specific directives relating to IPPsand    H On January 272006BCTC filed an F2006 Capital Plan Update requesting the removal of 14 IPP projects –  one was cancelledand the remaining 13 projects were being deferred until such time as the IPPs entered  into facilities and interconnection agreements with BCTC and the Bear Creek Power Project was one of the  deferred projectsand    I In its Decision dated June 42006 and Order G6706the Commission approved the removal of seven IPP  projects from Order G9105and directed that if any of the removed IPP projects are resurrectedBCTC  must seek Commission approval for capital expenditures at that time.  The Commission also directed BCTC  to provide a recommended approach to the treatment of uncertain IPP projects in its next Capital Plan  applicationand    J On December 212006BCTC filed a F2008 to F2017 Transmission System Capital Plan in which BCTC  addressed the directive for treatment of IPP projects and proposed thatfor projects identified in the F2006  Capital Plan Update Decision as requiring further approvalBCTC will sign Facilities Agreements with IPP  customerswill proceed with study work and the interconnection process and will seek Commission approval  or file a letter with the Commissionand    K In its Decision dated June 152007 and Order G6907the Commission accepted BCTCs proposed approach  for treatment of IPP projects in its F2008 Capital Planand 
        BRIT ISH  COLUMBIA     UTIL IT IES  COMMISSION               ORDER      NUMBER   G12308   3        L On June 42008 BCTC entered into a triparty Interconnection Agreement and a Facilities Agreement with  the Project proponent and the Clowhom River Project (“Combined Project”) which is located in the vicinity of  the Projectand each Project proponent will execute an Interconnection Agreement prior to commercial  operationand    M The triparty proposed facilities consist of four plants having a combined capacity of 42 MW.  The Lower  Clowhom River plant and Upper Clowhom River plant will each have one unit rated for 11 MW at 13.8 kV.   The Lower Bear Creek plant will have two units rated for 4 MW at 13.8 kV each and the Upper Bear Creek  plant will have one unit rated for 12 MW at 13.8 kVand    N In triparty Interconnection Agreementthe five 138 kV designated lines are   (a) L1that will be 14.4 km in length from Lower Clowhom to Bear Creek switching station (b) L2that will be 7.4 km in length from Upper Clowhom to Lower Clowhom (c) L3that will be 6.1 km in length from Bear Creek Switching Station to existing Clowhom River G1  generating station (d) L4that will be 0.5 km in length from Lower Bear Creek to Bear Creek switching station (e) L5that will be 7.5 km in length from Upper Bear Creek to Bear Creek switching stationand    O The planned commercial operation date is October 2008 for Clowhom River Project and October 2009 for  Bear Creek Projectand    P The estimated cost of the facilities required to accommodate the interconnection of the Combined Project  to the Transmission System is $3,093,400 excluding GST and includes the cost of Direct Assignment Facilities  at the amount of $1,146,000 that are funded by the Combined Project proponents and the Network  Upgrades to accommodate the Combined Project Network Upgrades at the amount of $1,947,300 (plus  GST); and    Q The Commission has reviewed the Application and concludes that the expenditure to connect the Combined  Project is in the public interest and that the Combined Project meets the grandfathering requirements in  Section 5.1.2 of Attachment M to the OATT  
                4  NOW THEREFORE pursuant to Section 44.2(3of the Amendment ActOrder G6706 and Section 5.1.2 of  Attachment M to the Open Access Transmission Tariff in accordance with Order G5805the Commission orders  as follows   1. As the costs are inseparablethe Commission grants approval for BCTC to incur Capital Expenditures to  construct the interconnection facilities for the Combined Projectas set out in the Application   2. BCTC will file with the Commission a final Project report on the construction of the interconnection facilities  for the Combined Project and provide explanations for any material variances from the schedule or cost  estimate as set out in this Order     DATED at the City of Vancouverin the Province of British Columbiathis          28               Order/G12308_BCTC_Bear Creek Project   BRIT ISH  COLUMBIA   UTIL IT IES  COMMISSION         ORDER     NUMBER   G12308        th            day of August 2008 BY ORDER  Original signed by  L.FKelsey  Commissioner 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.