Orders

Decision Information

Decision Content

                                          SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    An Application by British Columbia Hydro and Power Authority  to Amend Rate Schedule 1151 – Exempt Residential Service  to Residential Inclining Block Rate Control Group Customers    BEFORE L.FKelseyCommissioner    P.EVivianCommissioner        O  R  D  E  R  WHEREAS   A British Columbia Hydro and Power Authority (“BC Hydro”) filed on February 262008pursuant to  sections 58 to 61 of the Utilities Commission Act (the “Act”), an application for the review and approval of a  newtwostep residential inclining block (“RIB”) rate structure for its residential customersto be effective  October 12008or as soon as practicableand    B On August 282008the British Columbia Utilities Commission (“Commission”), by Order G12408 approved a RIB rate structure commencing October 12008and    C BC Hydro filed on October 202008pursuant to sections 58 to 61 of the Actan application for the approval  of a RIB rate exemption for a group of residential customers enrolled in a RIB rate control groupeffective  November 12008 (“Application”).  The RIB rate control group customers are to be recruited from the  currently participating Conservation Research Initiative ‐ Time of Use (“CRI TOU”) control group customers.   The CRI TOU Pilot program is to end on October 312008and    D SpecificallyBC Hydro seeks an order that will amend Rate Schedule 1151 ‐ Exempt Residential Service  (“RS 1151”) to allow customers enrolled in the RIB rate control group to continue to receive service under RS  1151 after October 312008and    E As one of several methods for measuring the effectiveness of the RIB rateBC Hydro plans to use a RIB rate  control group as a means of comparing the energy consumption patterns of residential customers on a flat  rate to residential customers on the RIB rateand              BRIT ISH  COLU   MBIA   UTIL IT IES  COM   MISSION               ORDER         NUMBER   G  16008            TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102    October 312008  . . ./2 
        BRIT ISH  COLUMBIA     UTIL IT IES  COMMISSION               ORDER      NUMBER   G16008        2        F By letter dated October 232008the British Columbia Sustainable Energy Association and the Sierra Club of  British Columbia made submissions to support BC Hydros Applicationand    G By letter dated October 272008the British Columbia Old Age Pensioners et alsubmitted their opposition  to the Applicationciting concerns related to bias in the methodology and the effects it would have on  research resultsand    H On October 282008 BC Hydro responded by letter stating that it believes that the CRI TOU control group is  the best control group to evaluate the RIB rateand    J The Commission has considered the matter and has concluded that the merits of research methodologies  and results should be left to a fullscale application on rate structure or rate designand the approval of the  Application at hand is to facilitate BC Hydro to proceed with its research work     NOW THEREFORE the Commission orders that the amended tariff page for RS 1151 attached as Appendix A to  this Order is approved     DATED at the City of Vancouverin the Province of British Columbiathis          31 st              day of October 2008     BY ORDER        Original signed by     L.FKelsey    Commissioner    Attachment    Order/G16008_BCH_Amend RS 1151 Xmptn RIB Control Group 
  APPENDIX A  to Order G16008  Page 1 of 1       
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.