Orders

Decision Information

Decision Content

BRIT ISH  COLU MBIA   UTIL IT IES  COM MISSION         ORDER     NUMBER   G 14508    SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3   CANADA  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com FACSIMILE:  (604)  6601102   IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    An Application by Terasen Gas (Vancouver IslandInc for Approval of a Deferral Account for Currency Exchange Rate Differences  for the MtHayes LNG Storage Facility Project    BEFORE A.ARhodesCommissioner    P.EVivianCommissioner   September 252008      O  R  D  E  R    WHEREAS   A On June 52007 Terasen Gas (Vancouver IslandInc. (“TGVI”) filed with the B.CUtilities Commission  (“Commission”) an Application for a Certificate of Public Convenience and Necessity (“CPCN”) to construct  and operate a LNG Storage Facility at MtHayes in the Cowichan Valley Regional District in the vicinity of  Ladysmith (the “LNG Storage Facility”), and the facilities required for the connection of the LNG Storage  Facility to TGVIs gas transmission system (collectivelythe “Project”); and    B On November 152007the Commission granted a CPCN for the Project by Order NoC907 (the “Order”)  subject to a number of conditionsincluding that TGVI file a report (the “Report”) by March 312008 with  the certain information regarding the EngineeringProcurement and Construction (“EPC”) contract and  updated cost estimates.  The Commission also directed TGVI to file Quarterly Progress Reports within  30 days of the end of each reporting period during the Project executionand    C On February 182008TGVI filed a letter with the Commission providing information regarding TGVIs intent  to file the Report on or before WednesdayMarch 192008and    D. On February 272008TGVI filed a letter with the Commission that requested the Report be kept  confidential and be provided only to the Commission and to authorized representatives of Intervenors that  had executed the form of undertaking (Schedule Ato keep the information confidential in accordance with  the Practice Directive of the Commission related to Confidential Filingsand  …/2 
          BRITISH  COLUMBIA     UTILITIES  COMMISSION               ORDER       NUMBER   G14508  2          E. On March 292008TGVI filed the Report in which TGVI stated that the EPC contract price included foreign  currency exchange rate risk due to rate fluctuationsand that it intended to mitigate the risk through a  foreign currency forward contract.  TGVI also stated that it intended to seek approval from the Commission  to establish a balance sheet deferral account to allow it to avoid flowing marktomarket adjustments on the  hedges through Other Comprehensive Income/Earnings during Project executionand    F. On August 282008 TGVI applied for approval of a deferral account to record currency exchange rate  differences for the Project (the “Application”), and on September 222008 responded to questions regarding  the Applicationand    G The Commission has reviewed the Application and finds its approval to be in the public interest     NOW THEREFORE the Commission orders as follows   1 The Commission approves the Application of TGVI for a noninterest bearingnonrate base balance sheet  deferral account to record the marktomarket adjustments due to fluctuations in the rates on the foreign  currency exchange forward portion of the DesignBuild Contract for the Project   2 TGVI is directed to file the deferral account transactions as a confidential appendix to be included in the  Quarterly Progress Reports   3 The Commission will hold the Application and related material filed by TGVI confidential     DATED at the City of Vancouverin the Province of British Columbiathis       26 th      day of September 2008     BY ORDER      Original signed by      A.ARhodes    Commissioner    ORDERS/G14508_TGVI Mt Hayes Deferral Account 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.