LETTER NO. L-35-08 SIXTH FLOOR, 900 HOWE STREET, BOX 250 ERICA HAMILTON VANCOUVER, B.C. CANADA V6Z 2N3 COMMISSION SECRETARY TELEPHONE: (604) 660-4700 Commission.Secretary@bcuc.com BC TOLL FREE: 1-800-663-1385 web site: http://www.bcuc.com FACSIMILE: (604) 660-1102 Log No. 25818 VIA E-MAIL regulatory.affairs@terasengas.com July 10, 2008 Mr. Tom Loski Chief Regulatory Officer Terasen Gas Inc. 16705 Fraser Highway Surrey, BC V3S 2X7 Dear Mr. Loski: Re: Terasen Gas (Vancouver Island) Inc. 2008 Annual Gas Contracting Plan November 2008 October 2009 On June 23, 2008, Terasen Gas (Vancouver Island) Inc. (“TGVI”) filed its 2008/09 Annual Gas Contracting Plan (“ACP”). The primary objectives of TGVIs ACP are consistent with previous years filings and are outlined as follows: 1. To contract for cost-effective supply resources that ensure safe and reliable natural gas deliveries to meet core customer design peak day while militating against upstream and downstream supply disruptions. 2. To develop a portfolio resource mix with price diversity that incorporates contracting flexibility for both short and longer-term planning. The Commission accepts the 2008/09 ACP and the major components as described in the confidential document on pages 15 and 16. A summary is as follows: An increase of 1.7 TJ/day or 1.6% to 110.4 TJ/day from the 2007/08 ACP. Increase in Huntingdon seasonal and peaking purchases due to the increase in the peak day. The storage and transportation portfolio to remain unchanged from 2007/08. The information exclusive of the Executive Summary will be treated as confidential. All individual gas supply contracts and amendments will continue to be filed in a timely manner pursuant to Section 71 of the Utilities Commission Act. TGVI will continue to be expected to justify that each contract is consistent with meeting the …/2
2 needs of the core customers at the lowest cost and will also be required to file a report with the Commission at the end of the 2008/09 ACP that will analyse whether the objectives of the plan have been met. A copy of the non-confidential 2008/09 ACP Executive Summary is attached. RB/cms Attachment TGVI/Cor/L-35-08_AnnualGasContracting Plan 2008-09 LETTER NO. L-35-08 Yours truly, Original signed by Erica Hamilton
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.