  BRITISH  COL UMBIA   UTILITIES  COM MISSION         ORDER     NUMBER   G 13708  SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3   CANADA  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com FACSIMILE:  (604)  6601102 IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    An Application by the British Columbia Transmission Corporation  for a Certificate of Public Convenience and Necessity  for the Central Vancouver Island Transmission Project    BEFORE A.W.KAndersonCommissioner  and Panel Chair  M.RHarleCommissioner  September 242008  A.JPullmanCommissioner    O  R  D  E  R    WHEREAS   A On May 82008pursuant to the Utilities Commission Actthe British Columbia Transmission Corporation  (“BCTC”) filed an Application (“Application”) for a Certificate of Public Convenience and Necessity (“CPCN”)  to construct and operate the Central Vancouver Island Transmission Project (the “CVI Project”); and    B BCTC proposes the CVI Project as the preferred solution to alleviate capacity constraints in the Central  Vancouver Island areaand    C The CVI Project has an estimated capital cost of approximately $100 millionwhich includes the construction  of a new Harewood West substationand the construction of a new transmission lineapproximately 12 km  in lengthfollowing a route described as the Harewood South routeand    D BCTC wishes to obtain the CPCN by the end of August 2008in order to complete the project by the desired  date of October 2010and    E By Order G8208 dated May 162008the Commission established a Procedural Conference in Nanaimo BC on June 122008 to seek input on the regulatory process for the review of the Applicationand    F The Commission considered the input received at the Procedural Conferenceand concluded that further  information regarding the status of the application by BCTC to the Integrated Land Management Bureau  (“ILMB”) with respect to Block 271 would be helpful prior to making a determination on whether the review  of the Application should proceed by a written or oral hearing processand    . . . /2 
    BRITISH  COLUMBIA     UTILITIES  COMMISSION               ORDER      NUMBER   G13708  2        G By Order G10608 dated June 262008the Commission established a Community Input Session in  NanaimoBC on July 172008 to seek input on the regulatory process for the review of the Applicationand    H The Commission considered the information received at the Community Input Sessionand concluded that  further information regarding the review of the Application was requiredand    I By Order G11708 dated August 112008the Commission established an amended Regulatory Timetable  and sought Intervenor submissions on whether or not the Application should proceed by a Written or Oral  hearing processand    J On August 222008 Jeanette PongratzDoyle responded that her choice was the Oral Hearing processand    K On August 272008 Maureen Young responded that she would prefer an Oral Public Hearingand    L On September 182008 BC Hydro responded that that it considered a written review process appropriate and    M Joint Industry Electricity Steering Committee did not provide a submission on the hearing processOn  June 82008 Joint Industry Electricity Steering Committee stated that it is not seeking an Oral Hearingand    N On September 182008 BCTC submitted that the proceeding should continue on the proposed Written  Regulatory Timetable and BCTC continues to be of the view that an Oral hearing is not required for the  Commission to decide whether or not the CVI Project meets the test of public convenience and necessity  and is in the public interestand    O On September 152008 BCOAPO et al stated that it has no strong preference for either a Written or Oral  Hearing process and should the individuals registered as Intervenors in the CVI Project process express a  desire for a written process or express no preference whatsoeverBCOAPO et al will be content with the  written process as proposedand    P On September 242008 BCTC confirmed that the Integrated Land Management Bureau (“ILMB”) has  accepted BCTCs application for tenure over Crown Land for an electric power line crossing those parts of  District Lot 1 E&N and Block 271together with unsurveyed Crown foreshore or land covered by water  being part of the bed of Boulder Creekall within Douglas Districtcontaining 8.8 hectaresmore or less to  fulfillment of certain survey requirementsBCTC also advised the Commission that it had received  notification on September 112008 from the ILMB that the application relating to the preferred route  alignment over the remainder of Crown Block 271Block 202and Block 18 Plan 691Call within the Douglas  District was received by the ILMBThe application has not yet been formally accepted by the ILMBBCTC  will update the Commission once a letter of acceptance has been received from the ILMBand  . . ./3 
    BRITISH  COLUMBIA     UTILITIES  COMMISSION               ORDER      NUMBER   G13708  3          Q The Commission reviewed filed exhibits and the Transcripts of the Procedural Conference of June 122008  and noted that none of the Intervenors indicated a wish to file formal evidenceThe Commission has  concludedafter a review of these documents and the receipt of Intervenor submissionsthat the review of  the Application will proceed as a Written hearing process   NOW THEREFORE the Commission orders as follows   1 The Commission establishes the Amended Regulatory Timetable (attached as Appendix A).    2 BCTC will distribute copies of this Order and its Appendixin a timely fashionvia registered mail and email to all Registered Intervenors and Interested Parties     DATED at the City of Vancouverin the Province of British Columbiathis            29 th          day of September 2008     BY ORDER      Original signed by     A.W.KAnderson    Commissioner and Panel Chair  Attachment    Orders/G13708_BCTCCVI_Amended Regulatory Timetable   
SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3    CANADA  web sitehttp://www.bcuc.com  An Application by the British Columbia Transmission Corporation  for a Certificate of Public Convenience and Necessity  for the Central Vancouver Island Transmission Project        AMENDED WRITTEN REGULATORY TIMETABLE    ACTION  BCTC Written Final Submission   Intervenors Written Final Submissions  BCTC Written Reply Submission    For further information or to registerplease contact MsErica HamiltonCommission Secretaryas follows     Telephone:  (6046604700  EMail:  Commission.Secretary@bcuc.com    Facsimile:  (6046601102       APPENDIX A  to Order G13708  Page 1 of 1          TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102     DATE (2008)   ThursdayOctober 9 ThursdayOctober 16 ThursdayOctober 23    Telephone:  BC Toll Free18006631385 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.