  BRITISH  COLUM BIA   UTILITIES  COMMIS SION         ORDER     NUMBER   G13 408    SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3   CANADA  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com FACSIMILE:  (604)  6601102   IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    An Application by British Columbia Hydro and Power Authority  for Review of the F2009 and F2010 Revenue Requirements Application    BEFORE L.AOHaraPanel Chair    R.JMilbourneCommissioner  September 182008    A.ARhodesCommissioner    O  R  D  E  R  WHEREAS   A. British Columbia Hydro and Power Authority (“BC Hydro”) filed on February 202008pursuant to  sections 58 to 61 of the Utilities Commission Act (“the Act”), for review of its Fiscal 2009 and Fiscal 2010  Revenue Requirements and certain resultant interim and permanent rate increases and adjustments to its  rate rider (the “F09/F10 RRA” or “Application”); and    B. On February 252008the Canadian Office and Professional Employees Union Local 378 (“COPE”) registered  as an Intervenorand    C. On April 302008by Order G7808the Commission establishedamong other thingsa Regulatory  Timetable which established a deadline for the filing of Intervenor evidence of July 292008and    D. On August 13 th 2008 COPE submitted a letter to the Commission requesting leave to file late evidenceand    E. On August 152008 the Commission issued Order G11908 cancelling the planned Negotiated Settlement  Process scheduled to begin on August 182008 and establishing a PreHearing Conference for August 21 2008 to deal with the conduct of the proceeding as well as COPEs request to file late evidenceand    F. Following the August 212008 PreHearing Conference the Commission issued Order G12208 dated August  252008in part granting leave to COPE to file its application for late evidence by September 52008 and  requiring the submissions of BC Hydro and other Intervenors on the application and evidenceif anyto be  filed by September 102008.  The Order also required COPE to file its replyif anyby September 122008 and    …/2 
        BRITISH  COLUMBIA     UTILITIES  COMMISSION               ORDER      NUMBER   G13408      2        G. On September 52008 COPE filed its application for late evidence together with its proposed evidence.  The  evidence relates to BC Hydros contract with Accenture Business Services for Utilities (“Accenture” or  ABSU”); and      H. BC Hydro filed its submission on COPEs application and evidence on September 102008 objecting to the  admission of the evidence into the record.   Submissions were also received on behalf of the British  Columbia Old Age Pensioners’ Organization etal. (“BCOAPO”) and the Joint Industry Electricity Steering  Committee (“JIESC”) in support of COPEs application.  COPE replied by letter dated September 112008and     I. In its reply submissionCOPE stated that it was advised on TuesdaySeptember 9 th 2008 that   BC Hydro is developing a newcentralized procurement organization to create more rigour  and strategic function in how [BC Hydroprocure[sgoods and services.  As suchAccenture  will no longer be providing purchasing services under the AMSA with BC Hydro after  November2008.”    and sought a direction from the Commission requiring BC Hydro to update its evidentiary record to address  the impact of its recent decision to bring procurement services inhouseand    J. By letter dated September 122008 BC Hydro advisedin response to the COPE request for a direction that it  update its evidentiary recordthat it would be “willing to respond to those concerns through examinationin chief of the BC Hydro witnesses that will have responsibility for testifying to ABSU and procurement issues at  the oral phase of this proceeding.”; and    K. By letter dated September 122008 the BCOAPO supported COPEs request for a direction from the  Commission requiring BC Hydro to update its evidentiary recordand    L. The Commission has reviewed the submissions and makes the following determinations     …/3 
        BRITISH  COLUMBIA     UTILITIES  COMMISSION               ORDER      NUMBER   G13408      3      NOW THEREFORE the Commission ordersfor the Reasons contained in Appendix A (attached), that   1. The COPE evidence is to be accepted into the evidentiary record for this proceeding   2. BC Hydro is to prepare an evidentiary update to reflect its current intentions in relation to the Accenture  contract and future procurement policies and to file that update by MondaySeptember 292008.  The  update should includebut not be limited tothe economic analysis relied on by BC Hydro in its decision to  repatriate the procurement function from Accenture.  In additionthe test year impact in each of F2009 and  F2010 for both costs and savingschanges in the regulatory financial schedules and changes in labour (costs  and FTEs), if anyshould be included     DATED at the City of Vancouverin the Province of British Columbiathis        18 th          day of September 2008     BY ORDER      Original signed by     L.AOHara    Panel Chair    Attachment    ORDERS/G13408_BCHF20092010RR_COPE Evidence & BCH Procurement Reasons for Decision 
APPENDIX A  to Order G13408  Page 1 of 4    An Application by British Columbia Hydro and Power Authority  for Review of the F2009 and F2010 Revenue Requirements Application      REASONS FOR DECISION      1.0 COPE EVIDENCE    The Canadian Office and Professional Employees Union Local 378 (“COPE”), an Intervenor in this proceeding applied to tender evidence in the British Columbia Hydro and Power Authority (“BC Hydro”) Fiscal 2009 and  Fiscal 2010 Revenue Requirements Application (“F09/F10 RRA” or “the Application”) after the deadline for the  submission of Intervenor evidence of July 292008 had passed.  COPE also seeks a direction that BC Hydro  update its evidentiary record to reflect its recent decision to bring procurement services previously being  performed by Accenture Business Services for Utilities (“Accenture” or “ABSU”) back in house.      COPE first requested leave to file its late evidence by letter dated August 132008 to the Commission.  By Order  G12208 dated August 252008 the Commission granted leave to COPE to make an application in respect of its  request to file late evidence and invited submissions from BC Hydro and any other parties who wished to make  submissions   The Commission has now received and reviewed the proposed COPE evidence and considered the submissions  of COPEBC Hydrothe British Columbia Old Age Pensioners’ Organization etal. (“BCOAPO”) and the Joint  Industry Electricity Steering Committee (“JIESC”).  No other parties have made submissions   In its submissionCOPE argues that the evidence which it tendered relates to BC Hydros contract with Accenture  which is relevant to BC Hydros claim for expenditures pursuant to its Procurement Enhancement Initiativeand  therefore falls squarely within the scope of the proceeding.  COPE takes the position that the evidence was late  as it was not developed until BC Hydro failed to provide satisfactory responses to its Information Requests  (“IRson this topic.  COPE also submits that BC Hydros decision to change its procurement practices will have  an impact on BC Hydros revenue requirements and that BC Hydro should therefore be directed to update its  evidentiary record to reflect this change   BC Hydro opposes the COPE application and takes the position that the evidence should not be accepted into the  record on the basis that it is of limited probative valuewould prejudice BC Hydro and the process due to its   
APPENDIX A  to Order G13408  Page 2 of 4      latenessand in any event that COPE could raise the issues on crossexamination of BC Hydro witnesses.  BC  Hydro acceptedfor the purposes of its submissionthat the COPE evidence satisfied “the threshold question of  relevance”.  BC Hydro also noted that COPE did not provide an adequate explanation for the delay in filing the  evidenceand that it could have availed itself of other processes to obtain better answers to its IRs earlier on.      With respect to its claim of prejudiceBC Hydro argues that allowing the late evidence into the record at this  point in time could affect its ability to prepare for the Oral Hearingthat there was no proposal for COPE to  answer IRs on its evidence in its application and that IRs are not a “minor procedural right” but a very important  process.  BC Hydro further suggests that COPEs evidence exceeds 60 pages and that its consideration will be  timeconsuming   In response to COPEs request for a direction that BC Hydro update its evidentiary recordBC Hydro indicatedby  letter dated September 122008that it is prepared to respond to COPEs concerns at the Oral Hearing through  the examinationinchief of its witnesses responsible to address issues relating to procurement and the  Accenture contract   With respect to the COPE applicationthe JIESC submits thatwhile it is regrettable that the proposed evidence  was not filed in accordance with the schedule set out in the Regulatory Timetablethe evidence should  nonetheless be admittedas it “clearly raises serious issues relevant to the subject matter of this hearing.”  The  JIESC also notes that the core of the evidence is actually only 7 pages longthe bulk of it being agreements as  between BC Hydro and Accenture with which BC Hydro should already be extremely familiar   The BCOAPO argues that the COPE evidence should be admitted as it bears on matters in issue and is therefore  relevant.  It also submits thatas the evidence could be put to BC Hydro on cross examination during the Oral  Hearingadmitting it into the record at this time mightin facteliminate potential prejudice and expedite the  hearing process    
APPENDIX A  to Order G13408  Page 3 of 4      By letter dated September 122008 the BCOAPO expressed its “profound dismay” with BC Hydros position  on  refusing to update its evidentiary record and supported COPEs request for a direction from the Commission noting that “(i)f BC Hydro can delay sharing its information until the hearing is underwaywe expect that much  of what can be gleaned from that point on will of necessity be provided in the form of written undertakings which remove the evidence from the dynamic process of active cross examination and further limit participants’  ability to probe the issues.”    In reply to BC Hydro on the issue of the lateness of its evidenceCOPE states that it will cooperate with any  reasonable schedule for IRs should BC Hydro wish to avail itself of that processbut also notes that the issues  raised in the evidence are wholly within the knowledge of BC Hydro   COMMISSION DETERMINATION    The Commission Panel agrees with the comments of JIESC that it is regrettable that the proposed COPE evidence  was not tendered in accordance with the schedule set out in the Regulatory Timetable.  Howeverthe  Commission Panel is of the view that the evidence is relevant and falls squarely within the scope of the issues to  be resolved in the proceeding as set out in Order G7808.  The Commission Panel notes BC Hydros comments  that COPE “will have the opportunity to explore through crossexamination of BC Hydro witnesses the issues  raised by the evidence” but agrees with the comments of BCOAPO that admitting the evidence into the record at  this timeas opposed to raising the issues on crossexamination might expedite the hearing process.  The  Commission Panel agrees that the COPE evidence is basically seven pages in length and that the attachments are  documents with which BC Hydro should already be extremely familiar.  The Commission Panel further notes that  COPE has agreed to accommodate the IR process should BC Hydro wish to proceed with IRs.  The Commission  Panel is therefore of the view that any prejudice which may be suffered by BC Hydro is minimaland is  outweighed by the benefit of having the submitted material in evidence before the hearing for proper  consideration by all parties to the process.  The Commission Panel therefore orders that the COPE evidence be  accepted into the evidentiary record for this proceeding    
APPENDIX A  to Order G13408  Page 4 of 4      The Commission Panel further agrees with the submission of the BCOAPO that waiting until the witnesses testify  at the Oral Hearing to address any issues arising from BC Hydros decision to change its procurement practices  will limit the participants’ ability to probe the issues arising.  Accordinglythe Commission Panel directs BC  Hydro to prepare an evidentiary update to reflect its current intentions in relation to the Accenture contract  and future procurement policies and to file that update by MondaySeptember 292008.  The update should  includebut not be limited tothe economic analysis relied on by BC Hydro in its decision to repatriate the  procurement function from Accenture.  In additionthe test year impact in each of F2009 and F2010 for both  costs and savingschanges in the regulatory financial schedules and changes in labour (costs and FTEs), if any should be included.       