Orders

Decision Information

Decision Content

BRIT I SH  COLU MBIA   UTIL IT I ES  COM MISS ION         ORDER     NUMBER   F 2008    SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3   CANADA  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com FACSIMILE:  (604)  6601102 IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    Application by British Columbia Transmission Corporation  for Approval of Rates Effective April 12008 and April 12009      BEFORE:   L.AOHaraPanel Chair       and Commissioner  July 312008    O  R  D  E  R  WHEREAS   A. On February 202008British Columbia Transmission Corporation (“BCTC”) filed an application for approval  of its F2009 and F2010 Transmission Revenue Requirements (the “Application”) pursuant to Sections 58 and  89 of the Utilities Commission Act (the “Act”).  The Application seeks approval of permanent rates effective  April 12008 and April 12009 and to amend on an interim basis the current rates effective April 12008to  reflect the rates BCTC is seeking on a permanent basis as proposed in Table 119 of the Applicationand    B. The Application forecasts a revenue deficiency of $51.4 million in F2009 and a further revenue deficiency of  $38.7 million in F2010which resulted in the proposed revenue requirement increases of 9.9 percent and  6.8 percent for F2009 and F2010 respectively.  The rates that BCTC seeks to have approved effective April 1 2008 and April 12009are set out in Table 119 columns (dand (erespectively of the Application.  The  proposed rates are forecast to have an impact on British Columbia Hydro and Power Authority (“BC Hydro”)  rates of 1.7 percent in F2009 and an additional 1.2 percent in F2010.  The impacts on BC Hydro rates from  the proposed BCTC rate changes are already reflected in the BC Hydro F2009/F2010 Revenue Requirements  application (“BC Hydro F09/F10 RRA”); and    C. BCTCs Application also seeks approval of: (iSubstation Distribution Asset Management and Maintenance  costs and Distribution Operations Services costs for F2009 and F2010and (iicontinuation of the existing  deferral accounts and approval of a new deferral accountand    D. Following the Procedural Conference held on March 202008established by Order NoG2308 at which  BCTC and the Intervenors supported a negotiated settlement review process (“NSP”), the Commission issued  Order NoG5408establishing a regulatory timetable for the NSP that commenced May 142008 and  concluded on May 152008and    E. By Order NoG10508the Commission approved the Settlement Agreementand  …/2 
2     F. On July 192008 the Joint Industry Electricity Steering Committee(“JIESC”) filed an application for a  Participant Assistance Cost Award with respect to its participation in the NSPand    G. By letter dated July 242008BCTC advised the Commission that it finds the cost award application  substantially consistent with the Commission Participant Assistance Cost Award Guidelinesand    H. The Commission has reviewed the application for cost award with regard to the criteria and rates set out in  Order NoG7207     NOW THEREFORE pursuant to Section 118(1of the Actthe Commission awards $22,029 to JIESC for its  participation in the BCTC F2009 and F2010 Revenue Requirements negotiated settlement process     DATED at the City of Vancouverin the Province of British Columbiathis           31                   Order/F2008_BCTCF2009F2010RRStlmt_JIESC PACA Award BRIT I SH  COLUMBIA   UTIL IT I ES  COMMISS ION         ORDER     NUMBER   F2008    st          day of July 2008 BY ORDER  Original signed by  L.AOHara  Panel Chair and Commissioner 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.