LETTER NO. L‐51‐08 ERICA M. HAMILTON SIXTH FLOOR, 900 HOWE STREET, BOX 250 COMMISSION SECRETARY VANCOUVER, B.C. CANADA V6Z 2N3 Commission.Secretary@bcuc.com TELEPHONE: (604) 660‐4700 web site: http://www.bcuc.com BC TOLL FREE: 1‐800‐663‐1385 FACSIMILE: (604) 660‐1102 VIA E‐MAIL bchydroregulatorygroup@bchydro.com November 4, 2008 Ms. Joanna Sofield Chief Regulatory Officer British Columbia Hydro and Power Authority 333 Dunsmuir Street Vancouver, B.C. V6B 5R3 Dear Ms. Sofield: Re: British Columbia Hydro and Power Authority Transmission Service Rates (“TSR”) Negotiated Settlement Application for Reconsideration of Commission Order G‐97‐08 Further to your October 27, 2008 application to vary Directive 4 of Commission Order G‐97‐08 to allow the TSR F2008 Annual Report to be filed later than November 1, 2008, the Commission grants your request and directs that the TSR F2008 Annual Report be filed no later than November 21, 2008. Yours truly, Original signed by Erica M. Hamilton cms cc: Registered Intervenors (BCH‐TSR‐RI) BCH/Cor/Extend Filing Deadline Transmission Svc Rate
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.