                      BRIT ISH  COLU   MBIA       UTIL IT IES  COM   MISSION                       ORDER         NUMBER   G   13808                    SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3   CANADA  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com  FACSIMILE:  (604)  6601102    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    British Columbia Hydro and Power Authority (“BC Hydro”)  2007 Rate Design Application (“2007 RDA”) Phase 1  an Application for Reconsideration of Commission Order G13007  regarding Decision Directive 19    BEFORE A.JPullmanPanel Chair    R.JMilbourneCommissioner  September 242008    L.AOHaraCommissioner    O R D E R  WHEREAS   A BC Hydro filed on March 152007pursuant to the Utilities Commission Act and Commission Order G14806 the 2007 RDA to update BC Hydros rates and terms and conditions of serviceand    B The 2007 RDA addressedamong other thingsproposed changes to the Large General Service (“LGS”) rates  in order to flatten both the demand charge and the declining energy chargeand     C The issues to be addressed in the context of the 2007 RDA were reviewed in three phasesand BC Hydros  proposed changes to the LGS rates were reviewed in an Oral Public Hearing for Phase I that commenced on  July 92007 in Vancouver and ended on July 192007and    D On September 192007the Commission issued interim Order G11107 to ensure that the Rate Schedules  resulting from its Decision would be in place by April 12008and    E On October 262007the Commission issued its Decision on the 2007 RDA and concurrently issued  Order G13007.  Order G13007 confirmed the interim Order as final and ordered BC Hydro to comply with  all the directives of the Commission in the Decisionincluding those directives that are the subject matter of  Order G11107and    F Directive 19 of the Decisionin partinstructed BC Hydro to commence meaningful stakeholder engagement  with its LGS customers to develop and file with the Commission an application for a rate structure or  structures that encourage conservation without unduly benefiting or harming any of its customers in that  class.  Directive 19 set out that such a rate structure or structures should be in place by April 12009 with a  twoyear phasein if necessaryand  . . ./2 
BRIT ISH  COLUMBIA   UTIL IT IES  COMMISSION         ORDER    NUMBER   G13808    2          G By letter dated September 102008BC Hydro applied for a variance of Directive 19 of Commission Order G 13007 (“Reconsideration Application”).  In its Reconsideration ApplicationBC Hydro seeks an Order that: (i sets out the date by which BC Hydro must file a rate design application for the LGS rather than the date by  which the new rates must be implementedand (iiallows for a multipleyear phasein rather than a two year phaseinif necessaryand    I In the Reconsideration ApplicationBC Hydro describes the LGS rate design activities completed to date as  well as those activities going forward and concludes that more time is required for meaningful stakeholder  engagement.  BC Hydro submits that the Commission should revise Directive 19 to: (iallow the LGS Rate  Design Application to be filed no later than June 302009and (iiallow for a multiyear phasein that will  result in a greater array of possible rate designs and lessen negative bill impacts on LGS customersand    H In the Reconsideration ApplicationBC Hydro requests that the Commission proceed directly to the second  phase of the reconsideration process instead of proceeding under the normal twostage process for  reconsideration.  BC Hydro submits that its Reconsideration Application is largely procedural in nature relating primarily to the timing of an impending application rather than to its substanceand    J By letter dated September 152008the Commission accepted the Reconsideration Application to proceed  as a single phase process and set September 182008 as the deadline date for Intervenor submissions on the  merits of the Reconsideration Application and September 232008 as the deadline date for BC Hydros Reply  submissionsand    J Submissions were received from four Intervenorsnamelythe Commercial Energy Consumers Association of  British Columbia (“CEC”), the Joint Industry Electricity Steering Committee (“JIESC”), Energy Solutions for  Vancouver Island Society (“ESVI”), and the B.CSustainable Energy Association and the Sierra Club of British  Columbia (“BCSEA et al.”).  A submission from the external members of BC Hydros Rates Working Group  (“RWG”), composed of representatives from some of BC Hydros customer Intervenor groups and individual  members of the public was forwarded to the Commission by BC Hydroand    K All the submissions supported BC Hydros request that the LGS Rate Design Application be filed by June 30 2009 and all the submissionsexcept onesupported BC Hydros request for an allowance of a multipleyear  phasein period if necessary.  The CEC submitted that the question of whether there should be a phasein  period should be determined in a hearing based on the facts and not prejudged and therefore took the  position that a multiyear phasein should not be precluded but equally that it should not be grantedand   
BRIT ISH  COLUMBIA   UTIL IT IES  COMMISSION         ORDER    NUMBER   G13808    3        L In ReplyBC Hydro summarized the submissions from the Intervenors and the RWG and stated that it is not  aware of any submissions opposing the Reconsideration Application   M The Commission Panel has reviewed the Reconsideration Applicationthe Intervenors’ submissions and BC  Hydros Reply submissionsand has concluded that the request for relief should be accepted     NOW THEREFORE the Commission orders as follows   1 Directive 19 in the 2007 RDA Decision is amended to readin partas follows:     AccordinglyBC Hydro is directed to commence meaningful stakeholder engagement with its Large General  Service customers to developand file with the Commission an application for a rate structure or structures  that encourage conservation without unduly benefiting or harming any of its customers in that class.  Such  an application is to be filed no later than June 302009.  The term of the phasein period is to be addressed  in the application.”      DATED at the City of Vancouverin the Province of British Columbiathis      25 th       day of September 2008     BY ORDER      Original signed by      L.AOHara    Commissioner    ORDERS/G13808_BCH 2007 RDA Reconsideration ‐ Directive 19 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.