                  LETTER NOL5208                ERICA MHAMILTON  SIXTH FLOOR900 HOWE STREETBOX 250  COMMISSION SECRETARY  VANCOUVERB.C.  CANADA  V6Z 2N3  Commission.Secretary@bcuc.com  TELEPHONE:  (604)  6604700  web sitehttp://www.bcuc.com  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102    Log No26663    VIA EMAIL  kgustafson@lmls.com  November 72008      BC HYDRO POWER PURCHASE AGREEMENT TO  AMEND SECTION 2.1 OF RATE SCHEDULE 3808   EXHIBIT A11 MrKarl EGustafson  Lang Michener LLP  Barristers & Solicitors  1500 Three Bentall Centre  PO Box 11117  1055  West Georgia Street  VancouverBC   V6E 4N7    Dear MrGustafson   Re:  British Columbia Hydro and Power Authority (“BC Hydro”)  Project No3698531/Order NoG14808  Application to Amend Section 2.1 of Rate Schedule 3808  Power Purchase Agreement (“PPA”)    On November 42008 the City of Nelsonthrough its solicitors Lang Michener LLPfiled a letter (Exhibit C82 with the British Columbia Utilities Commission (the “Commission”) asking that the Commission   1. either extend the time for filing of Information Requests or confirm that Intervenors  will have the latitude to ask questions in the second round of Information Requests  that are not strictly limited to new information filed in response to the first round of  Information Requestsand    2. regardless of the Commissions decision with respect to item #1allow not less than  seven business days from the date on which BC Hydro must respond to all  Information Requests for the filing by Intervenors of their evidencewith appropriate  consequential adjustments to the remainder of the Timetable   As the original regulatory timetable contemplated 3 business days for Intervenors to prepare and file their initial  Information Requeststhe City of Nelson suggested that the original regulatory timetable does not allow  Intervenors sufficient time to prepare and file their evidence once the Application is finally completed following  the Information Request process    On November 42008as BC Hydro was late filing its response to Commission Information Request No1the  Commission posted Exhibit A10 extending the original timetable by two business daysThe City of Nelson did  not indicate that it was aware of Exhibit A10 . . . /2 
    2      By letter dated November 62008BC Hydro submitted that the City of Nelson and FortisBC have already had  about three months to consider their positions and the evidence they may need to support their positionsand  that the requested time extension will likely further delay a Commission determination on the matter.   MeanwhileFortisBC continues to be able to supply increased PPA energy to the City of Nelsonand so BC Hydro  opposes any further extension to the Regulatory Timetable   In response to the first request from the City of Nelsonwhich BC Hydro does not opposethe Commission  confirms that Intervenors may ask questions in the second round of Information Requests that are not strictly  limited to new information filed in response to the first round of Information Requests but advises that the  questions must remain relevant to the Application   In response to the second request from the City of Neslonthe Commission recognizes the concerns of BC Hydro  but concludes that a modest increase to the current three business days between when BC Hydro is to respond  to Information Requests and when Intervenor Evidence is to be filed is warranted in the circumstances.  The  Commission therefore extends the time for Intervenors to file Evidence to December 122008seven calendar  days after BC Hydro is to respond to all Information Requests.  Corresponding changes are made to subsequent  filing datesand the Revised Regulatory Timetable is Attachment A to this Letter     Yours truly     Original signed by       Constance MSmith    for Erica MHamilton    JBW/yl  Enclosure  cc Registered Intervenors    (BCHPPARI   PF/BCH/GenCor/A11_Response to C82 
      An Application by British Columbia Hydro and Power Authority (“BC Hydro”)  to Amend Section 2.1 of Rate Schedule 3808 (“RS 3808”)  Power Purchase Agreement (“PPA”)    REVISED REGULATORY TIMETABLE    ACTION    Publication of the Notice of Application by BC Hydro     Commission Information Request No1 to BC Hydro    BC Hydro Responses to Commission Information Request No1    Registration of Intervenors and Interested Parties with the Commission    Intervenor Participant Assistance Budgets    Intervenor Information Requests No1 to BC Hydro    BC Hydro Responses to Intervenor Information Requests No1    Commission and Intervenor Information Requests No2 to BC Hydro     BC Hydro Responses to Commission and Intervenor Information Requests No2    Submission of Intervenor Evidence    CommissionApplicant and Intervenor Information Requests No3  on Intervenor Evidence    Intervenor Response to CommissionApplicant and Intervenor Information  Requests No3    BC Hydro Final Submissions    Intervenor Final Submissions    BC Hydro Reply Submission        APPENDIX A  to Letter L5208  Page 1 of 1  DATE (2008)     FridayOctober 10 WednesdayOctober 22 WednesdayOctober 29 FridayOctober 31 MondayNovember 3 FridayNovember 7 FridayNovember 21 FridayNovember 28 FridayDecember 5 FridayDecember 12 FridayDecember 19 TuesdayDecember 30 DATE (2009)   FridayJanuary 9 FridayJanuary 16 FridayJanuary 23 . . . /2 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.