SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    Terasen Gas Incand Terasen Gas (Vancouver IslandInc and Terasen Gas (WhistlerInc 2008 Resource Plan    BEFORE A.W.KAndersonCommissioner    A.ARhodesCommissioner       O  R  D  E  R    WHEREAS   A. On June 272008Terasen Gas Inc., Terasen Gas (Vancouver IslandIncand Terasen Gas (WhistlerInc (collectively “Terasen” or “the Companies”) jointly filed a consolidated 2008 Resource Plan (“Resource Plan”)  for acceptance by the British Columbia Utilities Commission (“Commission”) in accordance with Section 44.1  of the Utilities Commission Actand    B. On May 282008Terasen Gas Incand Terasen Gas (Vancouver IslandInc. (collectively “TGI and TGVI”) filed  an Energy Efficiency and Conservation Programs Application (“EEC Application”); and    C. The Resource Plan includes fiveyear capital plans and statements of facilities expansionalthough the  Companies note that they are not requesting approval of these capital plansand    D. By Order G12008 the Commission established  a written proceeding  to review the Resource Planand    E. The Rental Owners and Managers Society of BCBritish Columbia Hydro and Power Authority (“BC Hydro”),  the Ministry of Energy Mines and Petroleum Resources (“MEMPR”), and the British Columbia Old Age  Pensioners’ Organization etal. (“BCOAPO”) registered as Intervenors in the proceedingand         BRIT ISH  COLUM BIA   U TIL IT IES  COMMIS S ION         ORDER     NUMBER   G19 408    TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102     December 152008  …/2 
  BRIT ISH  COLUMBIA   UTIL IT IES  COMMISSION         ORDER     NUMBER   G19408    2  F. In a letter dated September 92008BC Hydro submitted that the fuel switching expenditures proposed by  TGI and TGVI in the EEC Application are not in the public interest and requested Commission determinations  that issues related to the EEC Application would be dealt with exclusively in the EEC Application and that a  decision on the Resource Plan would be withheld until the Commission had properly considered the EEC  Applicationand     G. In a letter dated September 112008BCOAPO stated that it shared the concerns of BC Hydro and requested  that the regulatory process for the Resource Plan be delayed until after the Commissions decision with  respect to the EEC Application was releasedand    H. In a letter dated September 122008Terasen submitted that the Companies supported a Commission  direction confirming that EECrelated issuesincluding the issue of fuel switchingwould be dealt with  exclusively in the EEC proceeding.  The Companies further submitted that such a direction would be  adequate to ensure the EEC Application and the Resource Plan would be reviewed efficiently and fairly and  that there was no basis to delay the regulatory timetable established for the Resource Planand     I. By letter L4508 dated September 262008the Commission directed that all issues related to the EEC  Applicationincluding fuel switchingwould be dealt with exclusively in the EEC proceeding and declined to  make any adjustment to the regulatory timetable for the 2008 Resource Planand    J. On September 302008Terasen responded to Information Requests from the CommissionBC Hydro and  BCOAPOand    K. On October 72008Terasen filed its final submissions regarding the Resource Planand    L. BC Hydro and BCOAPO filed their final submissions on October 142008 and October 162008 respectively and     M. On October 242008 Terasen filed its reply submissionsand    N. The Commission Panel determines that acceptance of the 2008 Resource Plan for filing is in the public  interestsubject to the comments in the Reasons for Decision attached as Appendix A to this Order         …/3 
3  NOW THEREFORE the Commission Panel orders that the Resource Plan is accepted for filing by the Commission  subject to the comments in the Reasons for Decision attached as Appendix A to this Order     DATED at the City of Vancouverin the Province of British Columbiathis          15               Attachment            Orders/G19408_TGVITGW2008 Resource PlanReasons for Decisions   BRIT ISH  COLUMBIA   UTIL IT IES  COMMISSION         ORDER     NUMBER   G19408    th            day of December 2008 BY ORDER  Original signed by A.ARhodes  Commissioner 
  APPENDIX A  to Order G19408  Page 1 of 3       Terasen Gas Incand Terasen Gas (Vancouver IslandInc and Terasen Gas (WhistlerInc 2008 Resource Plan      REASONS FOR DECISION    On June 272008Terasen Gas Inc., Terasen Gas (Vancouver IslandInc., and Terasen Gas (WhistlerInc (collectively “Terasen”) filed their consolidated 2008 Resource Plan (“Resource Plan”) with the British Columbia  Utilities Commission (the “Commission”).  Terasens Resource Plan includes fiveyear capital plans and  statements of facilities expansionbut does not include a request for approval of these capital plans.  Rather Terasen will file separate applications for Certificates of Public Convenience and Necessityif requiredfor any of  those projects consistent with the Commissions guidelines.  The Action Plan identifies seven action items  (Exhibit B1section 9).  Only one of those action items, “Implement the new EEC program and continue research  and planning for future EEC programming”, requires significant new fundingand that funding is the subject of a  separate application as discussed below   Terasen Gas Incand Terasen Gas (Vancouver IslandInchad previously filedon May 282008their Energy  Efficiency and Conservation Programs Application (the “EEC Application”).  On June 202008 by Order G102 08 the Commission established a preliminary regulatory timetable to review the EEC Application.   Subsequentlyon September 182008by Order G13008the Commission established a written hearing  process (“EEC Proceeding”) and regulatory timetable to review the EEC Application   Order G12008 established a written hearing and regulatory timetable to review the Resource Plan.  The  Rental Owners and Managers Society of BCBritish Columbia Hydro and Power Authority (“BC Hydro”), the  Ministry of Energy Mines and Petroleum Resourcesand the British Columbia Old Age Pensioners’ Organization  etal. (“BCOAPO”) registered as Intervenors in the proceeding   On September 262008the Commission issued letter L4508 which stated that “…because the issues in the  Resource Plan and the EEC Application are sufficiently distinctit could approve the Resource Planexcept for  EEC issuessubject to and in advance of a decision with respect to the EEC Application.” (Exhibit A3p2)  The  Commission Panel therefore directed that all issues related to the EEC Applicationincluding fuel switchingare  to be dealt with exclusively in the EEC proceedingand declined any adjustment to the regulatory timetable for  the 2008 Resource Plan.      Consistent with the timetable established by Order G12008Terasen filed responses to information requests  from the CommissionBC Hydro and BCOAPO on September 302008.  Terasen filed its final submission on  October 72008.  Intervenorsspecifically BCOAPO and BC Hydrofiled their final submissions on October 16 2008 and October 142008respectively.  Terasen filed its reply submission on October 242008   BC Hydros submission notes that it had filed intervenor evidence in the EEC proceeding supporting its view that  the portion of the EEC expenditure targeting fuel switching from electricity to natural gas is not in the public  interest at this time.  BC Hydro also noted Commission letter L4508which determined that Terasens asserted  regional approach to Greenhouse Gas (“GHG”) emissions would be dealt with exclusively in the EEC proceeding.   BC Hydro took no position on the remainder of the Resource Plan  
  APPENDIX A  to Order G19408  Page 2 of 3   BCOAPO noted that Terasens Resource Plan does not seek approval of any of the specific actions described in  the Application.  By way of comment BCOAPO suggested that it is “…inadvisable for a fossil fuel provider to file a  longterm planning tool that ignores we now live in a country where aggressive conservation programs are or  soon will be the norm and where nonGHG emitting fuel sources are preferred going forward.”  BCOAPO stated  that it shares BC Hydros concerns over Terasens reliance on a solely regional analysis when evaluating GHG  emissions   BCOAPO further submitted that since Terasen filed its Resource Plan in June 2008global economic  circumstances have changed to an extent sufficient to require that the growth scenarios presented in the  Resource Plan be reconsidered.  BCOAPO submitted thatas opposed to the Reference Case presented in the  Terasen Resource Planits “Low Growth” scenario is now a more appropriate reference case.     In additionBCOAPO submitted that Terasens reference case forecast projects an average annual growth rate of  0.7 percent due largely to increased population and economic growthbut that in response to information  requestsTerasen indicated it has assumed population growth of 1.03 percent and customer growth that is 25  percent of population growthwhich implies that population growth is responsible for an average annual  increase of 0.258 percent.   BCOAPO submitted that “…this discrepancycombined with a likely low economic  growth scenario and increased conservation efforts are cause to revisit the forecast projections and  methodology.” (BCOAPO Final Submissionp5)     BCOAPO also expressed concerns about the ability of the regional gas transmission systems in the Pacific  Northwest to meet peak day demandand commented that the Regional Infrastructure Conclusions and  Recommendations do not appear to address the issueshould it arise before “the longer term”.    FinallyBCOAPO expressed concerns about Terasens Design Day Demand Methodology andin particularabout  the Rsquared statistics reported for each of the separate regression equations and Terasens multicollinear  equation.  BCOAPO submits that Terasen appears to have submitted “unadjusted Rsquares” and requested that  Terasen submit the adjusted Rsquared statistics.  BCOAPO also submitted that Terasen should be required to  provide the variances of the parameter estimates and review the statistical methodology prior to filing its next  resource plans   In its Reply SubmissionTerasen stated that the issues raised by BC Hydro are matters that must be addressed in  the context of Terasens EEC Applicationand will be addressed there   Regarding the BCOAPO commentsTerasen submitted in its Reply Submissions that it has examined GHG  emissions from a provincial policy perspective as well as a regional perspective and that both of these  perspectives are consistent and necessary.  Terasen further argued that it is not a foregone conclusion that the  low growth scenario for forecast gas demand is the most appropriate over the long termand stated that it will  continue to review and update its longrange forecast as new information becomes available “…primarily within  the timeframes of its annual planning cycles.”  Terasen further submitted that Action Plan items within the  Resource Plan address the issue of regional infrastructure capacity and identify specific solutions to alleviate the  problem.  FinallyTerasen submitted that it did use adjusted Rsquared valuesand that its current methodology  is a reasonable way to estimate future design day demand      
  APPENDIX A  to Order G19408  Page 2 of 3         Commission Panel Conclusions    Since Terasen is not requesting approval of any specific actions in its resource planit needs only to be accepted  under section 441 of the amended Utilities Commission Act RSBC 1996 c.473 (“UCA”).  Section 44.1(2)(b establishes that a longterm resource plan must include “(ba plan of how the public utility intends to reduce the  demand referred to in paragraph (aby taking costeffective demandside measures.”  The Resource Plan  addresses that requirement of the UCA in section 4in large measure by reference to the EEC Applicationwhich  has been ordered to be heard separately.     With regard to the issues related to fuel switching and GHG emissionsboth these issues have been made part of  the EEC Application and will be considered then   The forecasting issue raised by BCOAPO is not significant now because there are no actions required by the  reference case forecast presented by Terasenand a forecast lower than the reference case implies more time  before system reinforcements are required.  Finally Terasens design day forecast methodology has not been  demonstrated to be incorrect in this proceeding nor has a superior method been proposed andconsequently the Commission Panel is not prepared to direct any changes to it.  Howeverif BCOAPO continues to have  concerns about its accuracythe Commission Panel is of the view that intervenors should be allowed the  opportunity to raise the issue in the next Resource Plan filing or any other application where it is a factorand  would encourage them to submit evidence advocating an alternative approach they feel would be more  appropriate   Section 44.1(7of the UCA states that the Commission may accept or reject a part of the public utilitys plan.   Because the EEC issues are to be dealt with in the proceeding to review Terasens EEC Applicationthe  Commission Panel accepts the Resource Plan for filingexcept for Section 4 and those other parts of the  Resource Plan that relate to the issue of Energy Efficiency and Conservationincluding fuel switching and GHG  emissions.   A determination on those remaining issues will be made following the EEC Proceeding