                        BRIT ISH  COLU   MBIA         UTIL IT IES  COM   MISSION                       O   RDER         NUMBER   G   19508                SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3   CANADA  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com  FACSIMILE:  (604)  6601102    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    An Application by the British Columbia Transmission Corporation  to Amend the BCTC Open Access Transmission Tariff     and    A Complaint by TransCanada Energy Ltd Re Service Agreement between TCE and BCTC   for Long Term Firm PointtoPoint Transmission Service    BEFORE:   A.ARhodesPanel Chair  L.AOHaraCommissioner      December 182008  P.EVivianCommissioner    O R D E R    WHEREAS   A. On June 32008the British Columbia Transmission Corporation (“BCTC”) applied to the British Columbia  Utilities Commission (“BCUC”, “the Commission”) to suspend the release for sale of additional Firm Available  Transfer Capacity (“Firm ATC”) on the British Columbia to Alberta path (the “BC>AB Path”) and to suspend  the Facilities Study relating to requests for additional service on the BC>AB Pathand    B. On July 32008the Commission issued Order G11008 (the “Suspension Order”), granting BCTCs June 3 2008 application.  In granting the Suspension Orderthe Commission directed BCTC to address certain issues  raised in its application in the context of BCTCs next Open Access Transmission Tariff (“OATT”) Application  or Rate Design reviewand to provide a Tariff provision to address the issuesand    C. The OATT includes the ratestermsand conditions (including tariff supplementsof the nondiscriminatory open access transmission service offered by BCTC.  OATT is modeled on a pro forma tariff established by  Federal Energy Regulatory Commission (“FERC”) Order No888 (the pro forma tariff), as recently amended  by FERC Order No890and    …/2 
  BRIT ISH  COLUMBIA   UTIL IT IES  COMMISSION         ORDER     NUMBER   G19508    2  D. On July 142008BCTC held a consultation session concerning the implementation of FERC Order No890 The consultation addressed the following issuesthe potential impact of incremental sales of firm  transmission on existing firm transmission service on the BC>AB Paththe simultaneous submission window and performance metrics and operational penaltiesand    E. On October 92008TransCanada Energy Ltd. (“TransCanada” or “TCE”) filed a complaint with the  Commission with respect to BCTC (the “TCE Complaint” or “Complaint”).  TCE requested that the  Commission order BCTC to prioritise its Firm ATC  retroactive to December 12007giving priority access to  the Firm ATC to TCE over those users that subsequently acquired incremental firm capacityuntil such time  as system changes are made to accommodate all firm capacity holders on the BC>AB Pathand    F. By letter dated October 172008the Commission requested comment from BCTC on a process to review  the Complaintand     G. By letter of October 312008BCTC responded to the Commissionstating that BCTC anticipated filing its  OATT application by November 212008and that the application would address the issues raised by  TransCanadaand    H. By letter dated October 242008NorthPoint Energy Solutions (“NorthPoint”) submitted that it had also  been negatively impacted in a manner similar to that noted in the TCE ComplaintNorthPoint stated that it  anticipated filing a complaintand   I. By letter dated November 42008Cargill Power Markets LLC (“Cargill”) requested thatas a power marketer  with a reservation on the BC>AB Path that could be affected by the TCE Complaintit be informed of further  developments with respect to the TCE Complaintand be provided with the opportunity to intervene if and  when appropriateand    J. By letter dated November 62008TCE responded to BCTCs October 312008 letter.   TCE expressed the  view that the Complaint should not be combined with BCTC's OATT Applicationthatalthough the  Complaint and BCTC's next Tariff Application both address Firm Sales into Albertathe Tariff Application and  any proceeding relating theretocould not adequately address all of the issues set forth in the Complaint and    K. On November 132008the Commission issued letter L5308advising TCE that the Commission would after receipt of the OATT applicationissue a procedural letter or order to solicit submissions on the  appropriate process or processes for reviewing the TCE Complaint and the BCTC Applicationincluding the  appropriate degree of separation between the reviews of the Complaint and Applicationand     L. On November 212008BCTC filed an application to amend the OATT (the “Application”), pursuant to  subsections 5859and 60 of the Utilities Commission Act (“UCA”, the “Act”) and indicated that the  Application constitutes its response to the TCE Complaintand    …/3 
  BRIT ISH  COLUMBIA   UTIL IT IES  COMMISSION         ORDER     NUMBER   G19508      3      M. As part of the ApplicationBCTC sought an interim orderpursuant to section 89 of the Actand section 15 of  the Administrative Tribunals Actrequiring that specified new Service Agreements indicate that they are  subject to a further Commission order.  The requirement would apply to transmission service rollover  requests by BC Hydro and Power Authority (“BC Hydro”) on the BC>AB Path and any queued requests for  Firm ATC coming available on the BC>AB Path on January 12009and    N. Commission Order G17508dated November 272008required BCTC to indicate on two specified BC  Hydro rolloversand any contracts for Firm Available transfer capacity coming available on the BC>AB Path  on January 12009that   This Service Agreement is subject to a further order of British Columbia Utilities  Commission in the matter of the British Columbia transmission Corporation Application to  Amend the Open Access Transmission Tariff”; and    O. By letter dated November 282008TCE reiterated its view that the Complaint should not be heard together  with the BCTC OATT Application.  FurtherTCE objected to BCTCs request for an interim order for release of  180MW of Firm ATC upon the expiration of a BC Hydro contract having no rollover rights.  TCE also re stated the essential elements of its Complaintand      P. In Appendix B of the ApplicationBCTC proposed a preliminary schedule for the review of the OATTwith a  procedural conference to address matters relating to the Application and Complainta written hearing  process to address Parts 3 to 5 of the Applicationand an oral hearing process to address both Part 6 of the  Application and the TCE Complaintand    Q. The Commission has reviewed BCTCs proposed preliminary regulatory timetable for the review process for  the OATT Applicationthe TCE Complaintand considers that an Order to establish the timetable and a  Notice of Application and Procedural Conference is required     NOW THEREFORE the Commission orders as follows   A Procedural Conference concerning  the regulatory review process will be held on Thursday January 82009 commencing at 1:00 p.min the Commission Hearing Room on the Twelfth Floor1125 Howe StreetVancouver BC to address procedural matters which will includebut not be limited tothe following   i. Identification of the principal issues arising from or related to the OATT Application;     ii. The appropriate process for addressing the TCE Complaintand the appropriate degree of separation  between the reviews of the Complaint and Application;     …/4 
  BRIT ISH  COLUMBIA   UTIL IT IES  COMMISSION         ORDER     NUMBER   G19508    4  iii. Timetable for information requestsresponsesand filing of intervenor evidence;     iv. Additional process steps and associated dates for the regulatory reviewincluding a  whether an oral hearing or written hearing is required b  whether intervenors intend to file evidenceand  c.   other matters that may assist the Commission to efficiently review the Application and the TCE  Complaint   After the Prehearing Conferencethe Commission will  issue a further procedural order and regulatory agenda  for the review of the Application and the TCE Complaint   BCTC is directed to transmit the Notice of Application and Procedural Conferenceattached as Appendix B to this  Order to  all  organisations who  participated  in  the  July  14 2008 BCTC  FERC890 Consultation  #2  session to  Intervenors in the BCTC 2008 Application to Temporarily Suspend Release of Firm Available Transfer Capacity on  the BC>AB Pathand to  Intervenors registered  in the BCTC Transmission System Capital Plan F2010 and F2011  proceeding.      The Application and the Complainttogether with any supporting materialswill be made available for inspection  at  the BCTC Head Office at Suite 1100Four Bentall Centre1055 Dunsmuir StreetVancouverBCand at the  Commissions officeSixth Floor900 Howe StreetVancouverBC     DATED at the City of Vancouverin the Province of British Columbiathis            17 th            day of December2008     BY ORDER      Original signed by     A.ARhodes    Panel Chair and Commissioner  Attachments      Orders/Order G19508BCTCAmend to OATT_Ntc PHC 
  APPENDIX A  to Order G19508  Page 1 of 1      British Columbia Transmission Corporation   Application to Amend the BCTC Open Access Transmission Tariff (“OATT”)    and    A Complaint by TransCanada Energy Ltd. (“TCE”)   Regarding a Service Agreement between TCE and BCTC   for Long Term Firm PointtoPoint Transmission Service          REGULATORY TIMETABLE      ACTION  DATE (2009   Registration of Intervenors and Interested Parties  TuesdayJanuary 6    Procedural Conference  ThursdayJanuary 8              
                  APPENDIX B    to Order NoG19508      Page 1 of 2              SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3    CANADA  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102  web sitehttp://www.bcuc.com      British Columbia Transmission Corporation   Application to Amend the BCTC Open Access Transmission Tariff     and    A Complaint by TransCanada Energy Ltd Regarding a Service Agreement between TCE and BCTC   for Long Term Firm PointtoPoint Transmission Service        NOTICE OF APPLICATION AND  PROCEDURAL CONFERENCE          Date:   ThursdayJanuary 82009  Time:   1:00 p.m Location:   Commission Hearing Room     12th Floor 1125 Howe Street   VancouverB.C     THE APPLICATION    On November  21 2008 BCTC  filed pursuant  to  subsections  58 59 and  60  of  the Utilities  Commission Act  (“UCA”, the “Act”), an Application to Amend the BCTC Open Access Transmission Tariff (“OATT”) with the British  Columbia Utilities Commission (“BCUC”, “the Commission”) for review.     BCTCs Open Access Transmission Tariff  (“OATT”)  consists of  the  rates termsand  conditions  (including  tariff  supplementsof the nondiscriminatoryopen access transmission service offered by BCTC.  OATT is modeled on  a  pro  forma  tariff  established  by  Order  No 888  (the  pro  forma  tariff of  the  Federal  Energy  Regulatory  Commission (“FERC”), as amended by FERC Order No890   THE COMPLAINT    On October 92008TransCanada Energy Ltd. (“TransCanada” or “TCE”) filed a complaint with the Commission  with respect  to BCTCs release  for sale of Firm ATC on the BC>AB Path  (the “TCE Complaint” or “Complaint”).   TCE requested that the Commission order BCTC to prioritise its Firm ATC retroactive to December 12007giving  priority access  to  the Firm ATC  to TCE over those users that subsequently acquired  incremental  firm capacity until such time as system changes are made to accommodate all firm capacity holders on the BC>AB Path  
  APPENDIX B  to Order NoG19508  Page 2 of 2        THE REGULATORY PROCESS    Commission Order G19508 established a Procedural Conference to hear submissions on the regulatory process  for review of the OATT Application and the TCE ComplaintThe Procedural Conference will commence at 1:00  p.mon ThursdayJanuary 82009in the Commission Hearing Room on the Twelfth Floor1125 Howe Street VancouverBC     PUBLIC INSPECTION OF THE APPLICATION    The Application and the Complaint are available for inspection at the following locations   BCTC  BC Utilities Commission  Suite 1100Four Bentall Centre1055 Dunsmuir Street  Sixth Floor900 Howe Street  VancouverB.CV7X 1V5  VancouverB.CV6Z 2N3  Telephone:  (6046997328  Telephone:  (6046604700        The Application and Complaint are available for viewing on the Commissions web site:  http://www.bcuc.com      REGISTERING TO PARTICIPATE    Persons who expect to actively participate in the review process or processes and Procedural Conference should  register as Intervenors with the CommissionIntervenors will receive copies of the Application and the  Complaintall correspondence and filed documentsPersons not expecting to actively participate should register  with the Commission as Interested Parties and will receive a copy of the Applications summarythe Complaints  summaryall Orders issuedand the Commissions Decisions   Intervenors and Interested Parties should inform the Commission Secretaryin writingby TuesdayJanuary 6 2008 of their intention to become Intervenors or Interested Partieswhether they intend to attend the  Procedural Conferenceandif sothe number in the party that will be attending with them.      All submissions and/or correspondence received from active participants or the public relating to the Application  and the Complaint will be placed on the public record and posted to the Commissions web site     FURTHER INFORMATION    For further informationplease contact MsErica HamiltonCommission Secretary as follows   Telephone: (6046604700  B.CToll Free18006631385  Facsimile: (6046601102  Emailcommission.secretary@bcuc.com 