          BRIT I SH  COLUMBIA     UTIL IT I ES  COMMISS ION                 ORDER     SIXTH FLOOR900 HOWE STREETBOX 250    NUMBER   G19808  VANCOUVERB.C.  V6Z 2N3    CANADA  web sitehttp://www.bcuc.com        TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    An Application by Smart Energy (BCLtd for Reconsideration of Commission Order G4508   and Reconsideration Decision Order G11108      BEFORE  L.FKelseyCommissioner  December 162008    O R D E R  WHEREAS   A. Smart Energy (BCLtd. (“Smart Energy”) conducted a sales call to a gas Customer in Surrey on or about  November 152007as a result of the callthe Customer signed a contract with Smart Energy for the supply  of Natural Gasand    B. On January 172008the Customer logged a dispute through the Terasen Gas IncGateway for Energy  Marketers (“GEM”) system identified as Dispute No8895and provided the British Columbia Utilities  Commission (the “Commission”) with an email dated January 172008 as evidence in the disputeand    C. Smart Energy provided as evidence a copy of the Customers contract with Smart Energy and a Third Party  Verification (“TPV”) recordingand    D. The Commission subsequently cancelled the Customers contract with Smart Energyand    E. The Commission wrote to Smart Energy initiating a Written Hearing into the conduct of the TPV provided as  evidence by Smart Energyand the allegations of the Customer against Smart Energyand    F. Following a Written Hearing on the matterthe Commission found that Smart Energy had violated Articles 9 15and 31 of the Code of Conduct for Gas Marketers (the “Code”), and furtherthat Smart Energy was not in  compliance with Commission Order G7307and    G. The Commission ordered that Smart Energy pay to the Commission a financial penalty of $3,000.00 for each  of the three breaches of the Codefor a total penalty of $9,000.00all as set out in the Reasons for Decision  attached as Appendix A to the Order G4508and    H. By letter dated April 242008 Smart Energy appliedpursuant to sections 99 and 100 of the Utilities  Commission Act (the “Act”), for a Reconsideration of Commission Order G4508 (the “Reconsideration  …/2 
        BRIT I SH  COLUMBIA     UTIL IT I ES  COMMISS ION             ORDER       NUMBER   G19808        3      Application”); and    I. The Commission reviewed the Reconsideration Application by Smart Energy and the established criteria  regarding the reasonable basis for allowing reconsideration and concluded that the request for  reconsideration should proceed.  By Commission Order G8008the Commission allowed the Smart Energy  Reconsideration Applicationdetermined that no new evidence will be allowed and that Smart Energy shall  file argument with respect of the Reconsideration Application by May 302008and    J. By letter dated May 302008Smart Energy filed Written Argument.  Following a review of the evidence the  Commission issued Order G11108 with Reasonsfinding that the requirements of Articles 9 and 15 of the  Code apply in this situationthe conduct of the TPV Agent was not in compliance with Articles 9 and 15 of  the Codethe TPV Agent did not refer to the 10day right of cancellation as required by Commission Order G 7307 and determining that Smart Energy is in violation of Article 31 of the Code of Conductand    K. Smart Energy was directed to make a submission to the Commission on its view of an appropriate action by  the Commission under section 71.1(5of the Actand     L. By letter dated August 52008Smart Energy submitted with reasons that an appropriate remedy in the  circumstances would be to add a condition to the License of Smart Energy with respect to the continuation  of a training and review procedure for all TPV Agents (“Submission”); and    O. The Commission has reviewed the Submission of Smart Energythe findings of the Reconsideration  Proceedingand the previous cancellation of the Customers contract     NOW THEREFORE the Commission accepts the Submission of Smart Energywith respect to an appropriate  remedy in this matterand returns to Smart Energy the financial penalty required by Order G4508     DATED at the City of Vancouverin the Province of British Columbiathis             19 th            day of December 2008     BY ORDER      Original signed by     L.FKelsey    Commissioner  Orders/G19808Smart EnergyRecon G4508 and Dec G11108 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.