LETTER NO. L‐21‐09 ERICA M. HAMILTON SIXTH FLOOR, 900 HOWE STREET, BOX 250 COMMISSION SECRETARY VANCOUVER, B.C. CANADA V6Z 2N3 Commission.Secretary@bcuc.com TELEPHONE: (604) 660‐4700 web site: http://www.bcuc.com BC TOLL FREE: 1‐800‐663‐1385 FACSIMILE: (604) 660‐1102 Log No. 28846 VIA E‐MAIL Regulatory.Affairs@terasengas.com March 26, 2009 Mr. Tom A Loski Chief Regulatory Officer Terasen Gas Inc. 16705 Fraser Highway Surrey, BC V4N 0E8 Dear Mr. Loski: Re: Terasen Gas Inc. 2008–2011 Price Risk Management Plan Modification of Hedging Trigger Prices By letter dated March 19, 2009 Terasen Gas proposed to modify the hedging trigger prices limits to reflect Terasen Gas Commodity Cost Recovery Charge (“CCRA”) rate reduction effective April 1, 2009. The Commission accepts the modification set out in the March 19, 2009 letter as this will ensure that any extra hedging is not transacted above the CCRA rate. Yours truly, Original signed by: Erica M. Hamilton RB/cms TGI/Cor/L‐21‐09_PRMP Lower Hedging Trigger Prices
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.