Orders

Decision Information

Decision Content

                  LETTER NOL6308                ERICA MHAMILTON  SIXTH FLOOR900 HOWE STREETBOX 250  COMMISSION SECRETARY  VANCOUVERB.C.  CANADA  V6Z 2N3  Commission.Secretary@bcuc.com  TELEPHONE:  (604)  6604700  web sitehttp://www.bcuc.com  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102    Log No24130    VIA EMAIL      December 302008        BC HYDRO  EXHIBIT     A26  F2009/F2010 REVENUE REQUIREMENT      TO British Columbia Hydro and Power Authority    Registered Intervenors (BCHF0910RRRI       Re:  British Columbia Hydro and Power Authority (“BC Hydro”)  Project No3698500/Order NoG2108            F2009 and F2010 Revenue Requirements Application           Further to Exhibit A25the Commission Panel (“Panel”) has determined the Oral Phase of Argument  provisionally scheduled to begin at 9:00 a.mon January 162009 is required   The Panel invites Oral Submissions from the parties directed towards it achieving a better understanding of the  parties’ positions in respect of the matters listed belowThe parties are cautioned that the manner in which the  matters are framed is not to be taken as any indication of the direction as to the determinationsif anythat the  Commission may make in respect of any of these matters.     Submissions are to be confined to the evidentiary recordThe parties may refer to authorities from other  proceedings of the Commissionor the Courts where they believe those authorities may be of relevance but  have not been entered   Parties are requested to advise the Commissionin writing with reference by item numberby January 122009  if they wish to make submissions on an item.  Unless the parties otherwise agreethe Panel presently intends  that on all issuesBC Hydro will make any submissions it has firstfollowed by Intervenors with a right of reply by  BC HydroIf any party intends to rely upon an authority during the oral phase not previously referred to in  Argumenta copy of the authority is to be provided with its letter to the Commission along with references by  item number(sto the matter(sto which it applies.  The Panel will allow BC Hydro during replyor any other  party that it may allow to reply to the submissions of another party on an item during the oral phaseto refer to  authorities not identified by that party in its letter to the Commissionprovided the authorities are in response  to authorities referred to in the other partys letter to the Commission.      . . . /2 
  LETTER NOL6308    2      The matters are as follows   1. Pursuant to Order G4008an interim refundable general rate increase for F2009 is in place and (iif the  Panel should determine that the rate increase for F2009inclusive of any change in the Rate Rider should be differentand if the Panel determines that the rate changes for F2009 and F2010 should not  be made final until the 2008 LTAP Decision is renderedare there any reasons why the Panel could not  rescind and/or vary or amend Order G4008 to reflect that new value for F2009 in order thatif  appropriaterefunds for F2009if anycould be made to ratepayers in a timely fashion   If the Panel was to make a determination of an interim rate for F2009 that is different from that in the  Order G4008 and which also results in a refund, (iiin light of BC Hydros comments in its Reply  Argument at page 53the Panel also invites argument on BC Hydros position that “it is open to the  Commission to decidein this proceedingthe appropriate level of recovery of the Deferral Account  balances for F2009.”    2. BC Hydro takes the position thatunless a forecast expenditure can be determined to be demonstrably  imprudentthe Commission has no basis on which to disallow it from its Revenue Requirementsand  cites Hemlock Valley as its authorityCertain other parties have directed the Panel to sections 59 and 60  of the Actspecifically to the language at s60(1)(b)(iiiwhich speaks to other factors the Commission is  to consider in setting rateswhich factors BC Hydro submits are “subordinate” to the determination in  Hemlock ValleyThe Panel invites further argument on this matterand refers parties to ATCO Electric  Limited vAlberta (Energy and Utilities Board2004 ABCA 215 (CanLII), paragraphs 126 – 136   3. Further to 2aboveBC Hydro takes the position thatabsent a determination of imprudency on its part the burden of establishing which falls to the party seeking such a determinationall of its forecast  expendituresalong with any past expenditures on which those forecasts may be basedare  immunized” against amendment or variation by the CommissionThe Panel notes the general  agreement among the parties that the appropriate standard for assessment of prudency is to be found  in EnbridgeHoweverBCAOPO takes exception to BC Hydros position in respect of the burden of  making the case for imprudenceby differentiating between cases involving “retrospective” assessment  of the consequences of a utilitys past decisionsand cases where the circumstances involve the utilitys  recovery of its “prospective” expenditures through rates – in which case the burden of establishing the  prudency of the proposed expenditure is said to accrue to the utility   In its Reply ArgumentBC Hydro notes that no authority was provided for  BCOAPOs view in the case of  such  prospective expendituresand further that none of the authorities BC Hydro cited in its Final  Argument “support such a position” and accordingly that  BCOAPOs position is “ simply incorrect.” The  Panel invites further argument on this matterand specifically requests that BCOAPO provide it with  authority for its submission on this point   4. Certain parties have argued for an Order from the Commission to disallow any recovery by BC Hydro of  the direct and indirect costs associated with the failure of GM Shrum Unit 3 failure on the basis that its  decisions in respect of that unit were imprudentThe Panel notesamong other thingsthat the final  costs are not availablethere may be a material insurance recovery of a portion of the direct costsand while not expressly described in the record of the proceedingthere is a possibility that a portion of the  direct repair costs may qualify as a capital expense if in fact the repaired units life expectancy is  extended as a result of the repair   If the Panel were to direct BC Hydro to segregate all of the incurredtodate and future direct and 
  LETTER NOL6308    3      indirect costs of the repair in a separate Deferral Account (“the GMS3 DA”) and to apply to the  Commission for recovery of costs when the facts were better establishedand at which time the matter  of imprudence could be assessedwould that give rise to any material intergenerational equity or other  issues of concern    5. Certain parties have argued for an Order from the Commission to disallow any recovery by BC Hydro of  the incurredtodate and future costs of the PEI initiative on the basis that the business case for the  initiative is inadequate to justify the forecast quantum of the costs of the initiative and accordingly that  the decision to proceed with it is imprudentThe Panel notes that BC Hydro has authority pursuant to  Order G1708 to defer a portion of the portion of the incurredtodate costsand that it is seeking to  defer a portion of the forecast expenses to be incurred up to the operationality of the program in 2012  while not deferring certain other of the costs of the initiativewhich it seeks to recover as OMA expenses  in the test period or through a capital account   If the Panel were to direct BC Hydro to segregate all of the incurredtodate and future costs of the PEI  initiativeinclusive of the capital componentin a Deferral Account (the “PEI DA”) until such time as BC  Hydro was more knowledgeable ofand able toif possiblequantify the benefits of the initiative and  then applied for recovery of those costsat which time the matter of prudency could be assessedwould  that give rise to any material intergenerational equity or other issues of concern      6.  A party has argued for an Order from the Commission to disallow any recovery by BC Hydro of the  forecast “excess cost” of electricity supplied during the test period by IPPs over market prices for that  electricity on the basis that BC Hydros decisions in respect of the amount and timing of IPP supply it  awarded in the F 2006 Call were imprudentThe Panel notes that both the party requesting the order  and BC Hydro rely on the same Decisions of the Commission in support of their positionsalbeit with  different interpretations of the Commissions language   The Panel invites further argument on this matter and refers parties to Nova Scotia Power Inc., Re2006  NSUARB 23 (Can LII), paragraphs 56 to 96and Nova Scotia Power Inc., Re 2005 NSUARB 27 (Can LII),  paragraphs 47 to 97.     7. The Panel acknowledges and appreciates the submissions made by parties in response to its invitation  for Argument on the matter of “risk sharing” between BC Hydro and its ratepayersThe Panel notes a  general consensus among the parties that the issue of “controllability” of any risk is secondary to the  matter of BC Hydros prudency in response to the realization or mitigation of that riskThe Panel also  notes the direction of the requests of certain parties towards a more widespread utilization of Deferral  Accounts to ensure that variation from forecast parameters is captured to the potential benefit of  ratepayersparticularly where the potential for variance is asymmetric about the forecast value.     In the aggregatethe Panel believes this suggests a shift in ratepayers’ attitudes from the traditional  regulatory paradigm that “a utility is entitled to the opportunity to earn its allowed rate of return on  equity” towards a model wherein “BC Hydro is to be givenbut not to exceedits allowed rate of return  on equity.” The Panel (iinvites further argument from the parties as to whether the Panels  interpretation of the positions of the parties is accurate  
  LETTER NOL6308    4      Further, (iiif the Panel were to accommodate or otherwise recognize such a perceived directional shift   in making its determinations on some or all of the numerous requests from BC Hydro and the other  parties for Deferral Account treatment of the manifold matters in the Application and the parties’  argumentsmany of whichin the context of an unregulated entity would accrue solely to the  corporation save and effect for any force majeure impacts on its customerswould that give rise to any  material intergenerational equity or other issues     Yours truly     Original signed by     Erica MHamilton  LOH/dlf    PF/BCH_F20092010RR/A26_Oral SubmissionsRequired 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.