                                          SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    Terasen Gas Incand Terasen Gas (Vancouver IslandInc Energy Efficiency and Conservation Programs Application      BEFORE A.W.KAndersonCommissioner     A.ARhodesCommissioner      O  R  D  E  R    WHEREAS   A On May 282008 Terasen Gas Incand Terasen Gas (Vancouver IslandInc. (collectively “Terasen”) filed an  application for approval of various concepts and expenditures in support of an expanded energy efficiency  and conservation (“EEC”) strategyand to capitalize incremental EEC expenditures by charging the  expenditures to a regulatory asset deferral account and amortising the balance over 20 years (the  Application”); and    B On June 32008 the British Columbia Utilities Commission (“Commission”) issued a letter requesting that  interested parties register and file comments on Terasens proposed timetable before June 112008and    C. By Order G10208 dated June 192008the Commission issued a Preliminary Regulatory Timetable which  included two rounds of Commission Information Requests and one round of Intervenor Information  Requestsand requested comments from all parties on further process for reviewing the Applicationand    D. In response to Order G10208the Commission received replies from Terasen and the following Intervenors:   B.CMinistry of Energy Mines and Petroleum Resources (“MEMPR”), British Columbia Hydro and Power  Authority (“BC Hydro”), B.CSustainable Energy Association and the Sierra Club of British Columbia (“BCSEA SCBC”), the Commercial Energy Consumers Association of British Columbia (“CEC”), B.COld Age Pensioners’  Organization et al. (“BCOAPO”); and    E. Following its review of comments from Terasen and Intervenorsthe Commission issued Letter L3908  dated September 82008 ordering a second round of Intervenor Information Requestsand             BRIT ISH  COLU   MBIA   U   TIL IT IES  COM   MISSION               ORDER       NUMBER   G   3609            TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102    April 162009   
          BRITISH  COLUMBIA     UTILITIES  COMMISSION               ORDER       NUMBER   G3609      2        F. By Order G13008 dated September 182008 the Commission established a Written Hearing Process and  Regulatory Timetable for its review of the Applicationand    G. The Written Hearing Process concluded on December 52008 with the filing of Terasens reply submission and    H. The Commission has reviewed and considered the evidence and submissions of Terasen and Registered  Intervenors     NOW THEREFORE pursuant to section 44.2 of the Utilities Commission Actand subject to the specific  determinationsqualifications and directions set out in the Decision issued concurrently with this Orderthe  Commission orders as follows:     1 The following proposed expenditures are accepted   (a) $31.077 million for the combined Residential Energy Efficiency and Commercial Energy Efficiency  programs   (b) Expenditures for programs or initiatives directed at fuel switching away from fossil fuels with a higher  carbon content than that of natural gas to natural gas   (c) $6.918 million for the Conservation Education and Outreach program   (d) $3 million for Joint Initiativesand     (e) $0.5 million for Conservation Potential Review   2 Expenditures in the sum of $3 million for Innovative TechnologiesNatural Gas Vehicles and Measurement  and $1.5 million for Trade Relations are rejected   3 The proposed portfolio approach is accepted   4 The Total Resource Cost test is accepted as the appropriate test for cost effectiveness  
          BRITISH  COLUMBIA     UTILITIES  COMMISSION               ORDER       NUMBER   G3609      3        5. The proposal to exclude the free rider factor from benefitcost analyses is rejected   6. The proposal for Attribution of Regulatory Changes is rejected   7. The proposal to include carbon tax reductions in computing benefitcost analyses is accepted   8. Terasen is to commence the planning process for development of an Industrial EEC program and file a report  with the Commission within 90 days of the date of the Decision   9. The proposal for accountability mechanisms is accepted and Terasen is to file an annual report on its EEC  activities as described in the Commissions Decision   10. Subject to paragraph 11 belowthe proposal to capitalise the approved EEC expenditure to a regulatory  deferral account and to amortise the deferral account balances is accepted   11. The proposal to amortise EEC expenditures over a 20 year period is rejected.  Terasen is directed to base its  amortisation of approved EEC expenditures over periods not to exceed 10 years.       DATED at the City of Vancouverin the Province of British Columbiathis           16 th            day of April 2009     BY ORDER      Original signed by     A.W.KAnderson    Commissioner    Orders/G3609_TGITGVI Energy Efficiency Conservation Decision 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.