Orders

Decision Information

Decision Content

                  LETTER NOL11309                  SIXTH FLOOR900 HOWE STREETBOX 250  ERICA MHAMILTON  VANCOUVERB.C.  CANADA  V6Z 2N3  COMMISSION SECRETARY  TELEPHONE:  (604)  6604700  Commission.Secretary@bcuc.com  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com  FACSIMILE:  (604)  6601102   Log No31489  VIA EMAIL  regulatory.affairs@terasengas.com  December 182009      TGW  2010 ‐ 2011 REVENUE REQUIREMENTS            AND RATES APPLICATION                            EXHIBIT A6  MrTom Loski  Chief Regulatory Officer  Terasen Gas Inc 16705 Fraser Highway  SurreyBC   V4N 0E8    Dear MrLoski Re:  Terasen Gas (WhistlerInc 20102011 Revenue Requirements and Rate Application    Regarding B.CUtilities Commission (the “Commission”) Order G13609Athe Commission Panel has reviewed submissions to  the Commission from registered interveners (“Intervenors”) regarding the regulatory process of the Terasen Gas (WhistlerInc (“TGW”) 20102011 Revenue Requirements and Rate Application (“Application”).      Further to Order G13609Athe Commission Panel would like to obtain comments from TGW and the Intervenors regarding the  suggested regulatory process   The Application would follow a negotiated settlement process (“NSP”) with the following two items excluded from the  NSP process:      a. The matter of costs in excess of a limit determined by the mechanism to limit customer exposure to capital cost  overruns , as imposed by the Certificate of Public  Convenience and Necessity  contained in Order C306 and  further explained in Section 6 of the Decision that accompanies Order G5306 [as amended] (collectively “Order C 306”), related to the Whistler Conversion Project proposed for inclusion in rate base for recovery from customers  (“Whistler Conversion Cost Overruns”); and     b. The matter of proposed changes to the Commission approved mechanism to limit customer exposure to capital  cost overruns including but not limited to Aerial Crossings for the natural gas pipeline lateraland Base Incentives  amountsas imposed by Order C306and recalculate the amount of the Capital Contribution (collectively “Pipeline  Construction Calculations”).    The suggested process for review of the Whistler Conversion Cost overrunss and the Pipeline Construction Calculations  would be a written hearing process.     The Commission Panel requests submissions from Intervenors and TGW by December 312009.  Upon review of these  submissionsthe Commission Panel will determine the regulatory process for the Application     Yours truly     Original signed by   KB/cms  for Erica MHamilton  cc Registered Intervenors  PF/TGW_2010RRA/A6_Comments re Process 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.