Re: FortisBC Energy Inc.
British Columbia Utilities Commission Letter L-5-15 Compliance Filing
2013 – 2016 Gas Supply Mitigation Incentive Program (GSMIP) Term Sheet
On May 13, 2014, by Letter L-18-14, the British Columbia Utilities Commission (Commission) accepted a term sheet for the GSMIP for a three year term from November 1, 2013 to October 31, 2016 (2013-2016 GSMIP Term Sheet). The 2013-2016 GSMIP Term Sheet was attached as Appendix A to Letter L‑18-14.
On February 20, 2015, by Letter L-5-15, the Commission requested FEI to amend the 2013-2016 GSMIP Term Sheet to reflect that FEVI was amalgamated with FEI. On March 26, 2015, FEI filed a revised 2013-2016 GSMIP Term Sheet for Commission acceptance pursuant to Letter L-5-15.
The Commission reviewed the revised 2013-2016 GSMIP Term Sheet and considers that it meets the request of Letter L-5-15. The 2013-2016 GSMIP Term Sheet, attached as Appendix A to this letter, will replace the 2013-2016 GSMIP Term Sheet accepted under Letter L-18-14.