Orders

Decision Information

Decision Content

Via Email

gas.regulatory.affairs@fortisbc.com                                                       April 2, 2015

 

 

 

Ms. Diane Roy

Director, Regulatory Affairs

FortisBC Energy Inc.

16705 Fraser Highway

Surrey, BC  V4N 0E8

 

Dear Ms. Roy:

 

Re:  FortisBC Energy Inc.

British Columbia Utilities Commission Letter L-5-15 Compliance Filing

2013 – 2016 Gas Supply Mitigation Incentive Program (GSMIP) Term Sheet

 

On May 13, 2014, by Letter L-18-14, the British Columbia Utilities Commission (Commission) accepted a term sheet for the GSMIP for a three year term from November 1, 2013 to October 31, 2016 (2013-2016 GSMIP Term Sheet). The 2013-2016 GSMIP Term Sheet was attached as Appendix A to Letter L‑18-14.

 

On February 20, 2015, by Letter L-5-15, the Commission requested FEI to amend the 2013-2016 GSMIP Term Sheet to reflect that FEVI was amalgamated with FEI. On March 26, 2015, FEI filed a revised 2013-2016 GSMIP Term Sheet for Commission acceptance pursuant to Letter L-5-15.

 

The Commission reviewed the revised 2013-2016 GSMIP Term Sheet and considers that it meets the request of Letter L-5-15. The 2013-2016 GSMIP Term Sheet, attached as Appendix A to this letter, will replace the 2013-2016 GSMIP Term Sheet accepted under Letter L-18-14.

 

                                                                                                                                Yours truly,

 

Original signed by:

 

                                                                                                                                Erica Hamilton

LC/cms

Enclosure

 


 

 

 

 

 

 

 

 

 

 

 

 

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.