ORDER NUMBER
G-4-16
IN THE MATTER OF
the Utilities Commission Act, RSBC 1996, Chapter 473
and
Port Alice Gas Inc.
Application for Approval to Increase
the Basic Charge and Facility Charge
BEFORE:
B.A. Magnan, Panel Chair/Commissioner
on January 18, 2016
ORDER
WHEREAS:
A. On December 7, 2015, Port Alice Gas Inc. (PAG) applied to the British Columbia Utilities Commission (Commission) for an order approving an increase in the Basic Charge from $6.00 per month to $0.40 per day (nominally $12.00 per month) and to increase the Facility Charge from $17.32 to $38.90 per cubic meter of propane, effective January 1, 2016 (the Application);
B. The Application states that the Neucel pulp mill is currently not operating and the prospect of the mill returning to full operation is considered unlikely. As a result, the population of Port Alice has declined from over 1,700 full-time residents to likely less than 700 on December 7, 2015;
C. The Application also states that the volume of propane sold in 2010 was in excess of 510,000 litres, but in fiscal 2016 the volumes are expected to decline to 275,000 litres or less;
D. Despite the decline in propane volumes, the Application claims that most of the costs of operating the utility are fixed or increasing and resulted in losses of $6,550 for fiscal 2014 and $10,415 for fiscal 2015. The Application forecasts that without the proposed increases, PAG will be financially unviable;
E. By way of Order G-211-15 on December 21, 2015, the Commission approved rate changes on an interim and refundable basis effective January 1, 2016; and
F. The Commission considers establishing a regulatory timetable for the review of the Application through a written proceeding is necessary and in the public interest.
NOW THEREFORE the British Columbia Utilities Commission orders as follows:
1. The Regulatory Timetable for the review of this Application is established, as set out in Appendix A to this order.
2. Parties who wish to participate as interveners must register with the Commission by completing a request to intervene form, available on the Commission’s website at http://www.bcuc.com/Registration-Intervener-1.aspx, by the date established in the Regulatory Timetable attached as Appendix A to this order and in accordance with the Commission’s Rules of Practice and Procedure.
DATED at the City of Vancouver, in the Province of British Columbia, this 19th day of January 2016.
BY ORDER
Original signed by:
B.A. Magnan
Panel Chair/Commissioner
Attachment
Port Alice Gas Inc.
Application for Approval to Increase
the Basic Charge and Facility Charge
REGULATORY TIMETABLE
ACTION |
DATE (2016) |
Intervener Registration |
February 1 |
Commission Information Request No. 1 to Port Alice Gas |
February 11 |
Intervener Information Request No. 1 to Port Alice Gas |
February 18 |
Port Alice Gas Response to Commission and Intervener Information Request No. 1 |
March 3 |