June 28, 2018                                                                                                                                                                                                    

 

Sent via email                                                                                                                                                                       Letter L-16-18

 

Mr. Fred James

Chief Regulatory Officer

Regulatory & Rates Group

British Columbia Hydro and Power Authority

16th Floor – 333 Dunsmuir Street

Vancouver, BC  V6B 5R3

bchydroregulatorygroup@bchydro.com

 

 

Re:         BC Hydro– Application Approval of Amendments to the Availability Clause of Rate Schedule 1105

 

Dear Mr. James:

 

By letter dated June 12, 2018, British Columbia Hydro and Power Authority (BC Hydro) applied for approval to amend the Availability clause of Rate Schedule (RS) 1105 of the Electric Tariff, also known as the residential E-Plus rate, to remove the restriction on replacement of existing space and hot water heating equipment (Application).

 

Page 1 of attachment 2 of the Application includes a black-lined version of the proposed amendments to the Availability clause of RS 1105, as follows:

 

Availability

 

For residential space heating and water heating.

 

Electricity purchased under this Rate Schedule will be separately metered. Service is single phase, 60 hertz, at 120/240 or 240 volts.

 

This Rate Schedule is available only for Premises served under this Rate Schedule on January 15, 1990 and continuously thereafter, only with respect to equipment served under this Rate Schedule on January 15, 1990 and continuously thereafter, and only in Premises where there has been no change in Customer since April 1, 2008.

 

BC Hydro submits that the proposed amendments to RS 1105 will enable residential E-Plus customers to replace and improve the energy efficiency of their heating system equipment and still qualify for the E-Plus rate during the phase-out period. BC Hydro is requesting approval of this amendment effective as of the date of a British Columbia Utilities Commission (BCUC) order.

 

The BCUC invites comments on BC Hydro’s proposed amendments to the Availability clause of RS 1105 from those interveners that filed arguments regarding the residential E-Plus rate in the BC Hydro 2015 RDA proceeding, those parties being E-Plus Homeowners Group (EPHG), Non-Integrated Areas Ratepayers Group (NIARG), British Columbia Sustainable Energy Association and Sierra Club of BC (BCSEA-SCBC), and the Commercial Energy Consumers Association of BC (CEC). Comments are to be filed, in accordance with the following schedule:

 

Action

Date (2018)

Comments from EPHG, NIARG, BCSEA-SCBC and CEC (if any)

Friday, July 6

Reply Comments from BC Hydro

Friday, July 13

 

All comments should be filed directly with the Commission Secretary at commission.secretary@bcuc.com with a copy to BC Hydro, EPHG, NIARG, BCSEA-SCBC and CEC.

 

 

Sincerely,

 

Original signed by

 

Patrick Wruck

Commission Secretary

 

 