Orders

Decision Information

Decision Content

March 13, 2020

Sent via email                                                                                                                                                                              Letter L-8-20

Mr. Doug Slater

Director, Regulatory Affairs

FortisBC Energy Inc.

16705 Fraser Highway

Surrey, BC V4N 0E8

gas.regulatory.affairs@fortisbc.com

 

Re:          FortisBC Energy Inc. – Gas Supply Mitigation Incentive Program – Year End Report November
2018 – October 2019

Dear Mr. Slater:

 

On December 20, 2019, FortisBC Energy Inc. (FEI) filed the Gas Supply Mitigation Incentive Program Year End Report (November 2018 – October 2019) (2018/19 GSMIP Year End Report), in accordance with BCUC Order G-141-16 and the 2016-2019 GSMIP Term Sheet accepted by Letter L-27-16. In the filing, FEI requests that the British Columbia Utilities Commission (BCUC) accept the calculation of the total Gas Supply Mitigation Incentive Program (GSMIP) incentive payment of $3,125,694 for the period November 1, 2018 to October 31, 2019 (2018/19 Gas Year).

 

On February 27, 2020, FEI filed responses to Confidential BCUC Staff Questions No. 1, which included an amended GSMIP Model Spreadsheet (2018/19 Amended GSMIP Model Spreadsheet) and revised calculation of the total GSMIP incentive payment of $3,131,657 for the 2018/19 Gas Year.

 

Appendix A of the 2018/19 GSMIP Year End Report and the 2018/19 Amended GSMIP Model Spreadsheet are electronic working copies of the GSMIP model spreadsheet, which FEI filed confidentially due to commercially sensitive information.

 

The BCUC has reviewed the 2018/19 GSMIP Year End Report and the 2018/19 Amended GSMIP Model Spreadsheet in accordance with the 2016-2019 GSMIP Term Sheet. FEI did not perform any new activities in the 2018/19 Gas Year. Appendix A to this letter provides a table from FEI showing the mitigation activity summary including the overall GSMIP incentive payment of $3,131,657 for the 2018/19 Gas Year.

 

The BCUC accepts the calculation of the GSMIP incentive payment of $3,131,657 for the mitigation activities FEI performed in the 2018/19 Gas Year. The BCUC will keep the GSMIP Model Spreadsheets confidential, as requested by FEI, as they contain commercially sensitive information.

 

The BCUC reviewed the 2018/19 GSMIP Year End Report and the 2018/19 Amended GSMIP Model Spreadsheet and is satisfied that the requirements of Order G-141-16 have been met.

 

Sincerely,

 

Original signed by:

 

Patrick Wruck

Commission Secretary

LJW/jo

Enclosure


FortisBC Energy Inc.

Gas Supply Mitigation Incentive Program

Year End Report November 2018 - October 2019

 

A screenshot of a cell phone

Description automatically generated

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.