Suite 410, 900 Howe Street P: 604.660.4700 Vancouver, BC Canada V6Z 2N3 TF: 1.800.663.1385 bcuc.com F: 604.660.1102 ORDER NUMBER R-12-20 IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473 and A Revised Audit Schedule for Monitoring Compliance with British Columbia Reliability Standards in 2020 BEFORE: W. M. Everett, QC, Commissioner E. B. Lockhart, Commissioner on June 11, 2020 ORDER WHEREAS: A. On June 5, 2020, the Western Electricity Coordinating Council (WECC), acting as the Administrator for the British Columbia Utilities Commission (BCUC), submitted a recommendation (Recommendation) to defer the British Columbia Hydro and Power Authority (BC Hydro) 2020 Compliance Audit by six months. WECC also submitted a revised 2020 Audit Schedule (Revised Audit Schedule) to the BCUC for approval, wherein BC Hydro is removed from Compliance Audit this year; B. Order G-123-09 approved the Rules of Procedure for Reliability Standards in British Columbia (ROP), including the Compliance Monitoring Program (CMP) appended thereto, setting out the administrative framework for monitoring compliance with adopted Reliability Standards in British Columbia (BC) and most recent revisions to the ROP and CMP were approved by Order R-40-17, dated September 1, 2017. The ROP define terms used in the BC Mandatory Reliability Standards Program which are capitalized in this order; C. Order G-123-09 also appointed WECC as the BCUCs Administrator to assist the BCUC in carrying out its functions related to Reliability Standards in the manner described in the Administration Agreement between WECC and the BCUC dated October 8, 2009, and renewed for a second time on July 5, 2019; D. Pursuant to section 3.1 of the CMP, by November 1 of each year, the Administrator will propose an Implementation Plan for the following calendar year for BCUC approval; E. By Order R-28-19, dated November 7, 2019, the BCUC approved the 2020 Implementation Plan including Appendix A: Actively Monitored Standards List and Appendix B: 2020 Audit Schedule. Pursuant to section 3.1 of the approved 2020 Implementation Plan, WECC will conduct a Compliance Audit of a Reliability Coordinator (RC), Balancing Authority (BA), and/or Transmission Operator (TOP) every three years and all other Entities may be subject to Compliance Audits every six years or as approved by the BCUC; File 62836 | WECC MRS 2020 Revised Audit Schedule 1 of 2
Order R-12-20 F. As approved in the 2020 Audit Schedule, BC Hydro is scheduled for a Compliance Audit commencing September 14, 2020 with both on-site and off-site audit components, whereas smaller Entities are scheduled for off-site Compliance Audits only; G. WECCs Recommendation is based on possible future travel restrictions due to the impacts of COVID-19 and, more paramount, the health and safety of WECC and BC Hydro staff. The on-site portion of the BC Hydro audit is currently scheduled for a week following the on-site deferral of audits in the United States (US) and would require WECC staff to travel to BC Hydro. On-site audits are currently deferred until September 7, 2020 in the US and this date may be extended; and H. The BCUC reviewed the Recommendation and the Revised Audit Schedule as submitted by WECC and considers that both warrant approval. NOW THEREFORE pursuant to subsection 125.2(10) of the Utilities Commission Act and section 3.1 of the CMP, the BCUC orders as follows: 1. BC Hydros 2020 Compliance Audit is deferred by six months and its next Compliance Audit will be scheduled in 2021. 2. The Revised Audit Schedule, revised to remove BC Hydro, and attached as Appendix A to this order, is approved. 3. The Revised Audit Schedule must be posted on WECCs website with links from the BCUC throughout the calendar year 2020. DATED at the City of Vancouver, in the Province of British Columbia, this 11 th day of June 2020. BY ORDER Original signed by: W. M. Everett, QC Commissioner Attachment File 62836 | WECC MRS 2020 Revised Audit Schedule 2 of 2
2020 Audit Schedule for British Columbia *Revised: June 5, 2020* WECC ID ACRONYM REGISTERED ENTITY NAME WCR0029 TMGP Toba Montrose General Partnership WCR0037 VIPL V.I. Power Limited Partnership WCR0050 CMHL Coast Mountain Hydro Limited Partnership WCR0030 CPCD Catalyst Paper Crofton Division WCR0032 CPPAD Catalyst Paper Port Alberni Division WCR0033 CPPR Catalyst Paper Powell River Division WCR0039 DGP Dokie General Partnership Entities will be audited for all registered functions. APPENDIX A to Order R-12-20 APPENDIX B 2020 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE WITH BRITISH COLUMBIA RELIABILITY STANDARDS TEAM AUDIT TYPE TYPE BEGIN DATE END DATE LOCATION O&P CIP Off-site 04/20/2020 04/24/2020 WECC Offices O&P CIP Off-site 05/04/2020 05/08/2020 WECC Offices O&P CIP Off-site 07/27/2020 07/31/2020 WECC Offices O&P CIP Off-site 08/24/2020 08/28/2020 WECC Offices O&P CIP Off-site 08/24/2020 08/28/2020 WECC Offices O&P CIP Off-site 08/24/2020 08/28/2020 WECC Offices O&P CIP Off-site 11/02/2020 11/07/2020 WECC Offices
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.