ORDER NUMBER
R-32-20
IN THE MATTER OF
the Utilities Commission Act, RSBC 1996, Chapter 473
and
An Implementation Plan for Monitoring Compliance with
British Columbia Reliability Standards in 2021
BEFORE:
W. M. Everett, QC, Commissioner
on November 13, 2020
ORDER
WHEREAS:
A.
On October 30, 2020, the Western Electricity Coordinating Council (WECC) submitted the 2021
Implementation Plan for Monitoring Compliance with British Columbia Reliability Standards (2021
Implementation Plan) to the British Columbia Utilities Commission (BCUC) for approval;
B.
Order G-123-09 approved the Rules of Procedure for Reliability Standards in British Columbia (ROP),
including the Compliance Monitoring Program (CMP) appended thereto, setting out the administrative
framework for monitoring compliance with adopted Reliability Standards in British Columbia (BC) and most
recent revisions to the ROP and CMP were approved by Order R-40-17, dated September 1, 2017. The ROP
define terms used in the BC Mandatory Reliability Standards Program which are capitalized in this order;
C.
Order G-123-09 also appointed WECC as the BCUC’s Administrator to assist the BCUC in carrying out its
functions related to Reliability Standards in the manner described in the Administration Agreement between
WECC and the BCUC dated October 8, 2009, and renewed for a second time on July 5, 2019;
D.
Pursuant to section 3.1 of the CMP, by November 1 of each year, the Administrator will propose an
Implementation Plan for the following calendar year for BCUC approval. Once approved, the
Implementation Plan is to be posted on the WECC website with appropriate links from the BCUC website
and Entities are to be notified electronically that the Implementation Plan has been posted; and
E.
The BCUC reviewed and considered the 2021 Implementation Plan submitted by WECC, including a list of
minimum Reliability Standards to be actively monitored, methods to be used for monitoring, Periodic Data
Submittal requirements and an Audit Schedule, and considers approval is warranted.
File 64446 | WECC MRS 2021 Implementation Plan
1 of 2
Order R-32-20
NOW THEREFORE pursuant to subsection 125.2(10) of the Utilities Commission Act and section 3.1 of the CMP,
the BCUC orders as follows:
1.
The 2021 Implementation Plan attached as Attachment A to this order is approved.
2.
Entities subject to Reliability Standards in BC must comply with the terms of the 2021 Implementation Plan,
unless otherwise ordered by the BCUC.
3.
WECC must, immediately following the notice of this order, post this order and the 2021 Implementation
Plan along with Appendix A and B of the 2021 Implementation Plan on the WECC website. Links to the 2021
Implementation Plan and Appendix A and B will be accessible from the WECC website and the BCUC website
throughout the calendar year 2021.
4.
As new and revised standards are approved by the BCUC and become effective in BC, the revised and
additional standards may be added to the Actively Monitored Standards List for monitoring in the same
manner as the standards and requirements they are replacing. WECC may expand the scope of a Compliance
Audit and make minor changes to schedules or monitoring as required.
DATED at the City of Vancouver, in the Province of British Columbia, this 13
th
day of November 2020.
BY ORDER
Original signed by:
W. M. Everett, QC
Commissioner
Attachment
File 64446 | WECC MRS 2021 Implementation Plan
2 of 2
ATTACHMENT A
to Order R-32-20
British Columbia Utilities Commission
(BCUC)
Western Electricity
Coordinating Council (WECC)
2021 Implementation Plan
for Monitoring Compliance with
British Columbia Reliability Standards
October 30, 2020
1
1 of 30
ATTACHMENT A
to Order R-32-20
Table of Contents
1. Introduction and Context ............................................................................... 3
2. Compliance Monitoring Program Administrator (WECC) ........................... 4
2.1
WECC Operating Area ............................................................................ 4
3. Program Implementation – Monitoring ......................................................... 5
3.1
Compliance Audits .................................................................................. 5
3.2
Self-Certifications .................................................................................... 6
3.3
Spot-Checks ........................................................................................... 6
3.4
Compliance Violation Investigations ....................................................... 7
3.5
Self-Reports ............................................................................................ 7
3.6
Periodic Data Submittals ......................................................................... 8
4. Reliability Standards Subject to the Implementation Plan ......................... 8
4.1
Actively Monitored Reliability Standards ................................................. 8
5. Violation Review Process .............................................................................. 9
5.1
Initial Review ........................................................................................... 9
5.2
BC Find, Fix, Track Process ................................................................... 9
5.3
Contents of Notice of Alleged Violation ................................................. 12
6. Mitigation Plans ............................................................................................ 13
6.1
Proposed Mitigation Plans .................................................................... 13
6.2
Implementation of Mitigation Plans ....................................................... 13
6.3
Completion of Mitigation Plans ............................................................. 14
7. Outreach ....................................................................................................... 14
7.1
Reliability and Security Workshops ....................................................... 15
7.2
webCDMS and EFT Server Training..................................................... 15
7.3
Open Webinars ..................................................................................... 15
7.4
Questions and Answers by Subject Matter Experts .............................. 16
7.5
Compliance Questions and Answers .................................................... 16
Appendices
Appendix A – Actively Monitored Standards List
Appendix B – Audit Schedule
2
2 of 30
ATTACHMENT A
to Order R-32-20
1.
Introduction and Context
The British Columbia Utilities Commission (BCUC) is responsible for monitoring and
assessing compliance with approved British Columbia Reliability Standards. The BCUC
and the Western Electricity Coordinating Council (WECC or Administrator as noted in
the BCUC Rules of Procedure and associated appendices) have entered into an
Administration Agreement under which WECC will assist the BCUC in monitoring
compliance with Reliability Standards. In accordance with the BCUC/WECC
Administration Agreement:
•
The BCUC grants WECC the authority to act as the BCUC’s Administrator in the
administration of the approved Reliability Standards program in British Columbia
(BC). This grant of authority is restricted to the actions and obligations specified
in the Rules of Procedure, including the Registration Manual, Compliance
Monitoring Program, and Penalty Guidelines or as otherwise ordered by the
BCUC.
•
WECC is to submit annually to the BCUC, for review and approval, an
Implementation Plan for the following calendar year. The goal of the
Implementation Plan is to meet the requirements of the BCUC Rules of
Procedure, generally, and those specifically identified in the Compliance
Monitoring Program. In the event of any conflict between this Implementation
Plan and the Compliance Monitoring Program, this Implementation Plan governs.
WECC staff worked with the BCUC staff to develop this annual Implementation Plan,
which serves as the operating plan of the Compliance Monitoring Program and identifies
the BCUC approved Reliability Standards for which WECC will assist the BCUC to
monitor and assess compliance and the methods for monitoring compliance during
2021.
Unless directed otherwise by the BCUC:
•
Reliability Compliance is monitored from each Entity’s Compliance Date, as
defined in the Rules of Procedure. The Entity's registration date is not
determinative for this purpose.
•
Any assignment of responsibility for compliance with Reliability Standards
requires a valid written notice of assignment be sent to the BCUC with a copy to
WECC, transferring responsibility for compliance with the requirement(s),
including reporting, to another registered Entity.
3
3 of 30
ATTACHMENT A
to Order R-32-20
This Implementation Plan includes references to the Open Access Technology
International, Inc. (OATI) Compliance Data Management System (webCDMS) and to
the Enhanced File Transfer (EFT) Server currently used by WECC for electronic
submittal and distribution of documents. webCDMS is WECC’s primary compliance data
system used for compliance monitoring processes. The EFT Server is used as a file
upload solution for Audits and Spot-Checks, as well as ad-hoc requests. For convenient
reference, webCDMS usage details are available on the WECC website at:
https://www.wecc.org/Pages/Compliance-BritishColumbia.aspx. The EFT Server usage
details are available on the WECC website at:
https://www.wecc.org/Administrative/GlobalScape%20Enhanced%20File%20Transfer%
20Server%20User%20Guide-Updated%20July%202019_final.pdf
In the event that WECC may designate any other process for submittal of data,
information, or communications regarding compliance with Reliability Standards, WECC
will provide Entities with prompt notification and appropriate details of the process.
2.
Compliance Monitoring Program Administrator
(WECC)
2.1
WECC Operating Area
4
4 of 30
ATTACHMENT A
to Order R-32-20
3.
Program Implementation – Monitoring
WECC staff will work under the direction of the BCUC to assist with monitoring
compliance with the Reliability Standards adopted by the BCUC in a manner consistent
with the BCUC Compliance Monitoring Program and the monitoring processes specified
therein, as outlined below. In addition, WECC acknowledges that information meeting
the definitions of Confidential Information or Personal Information in the Rules of
Procedure must be handled in accordance with section 6 of the Rules of Procedure.
The BCUC and WECC recognizes the importance of prioritizing the health and safety of
personnel and the continued reliability and security of the bulk power system. In
response to the coronavirus pandemic, in 2020, the BCUC postponed on-site activities.
The BCUC, and in consultation with WECC where applicable, will continue to evaluate
the circumstances to determine the need for additional guidance or compliance
extensions in 2021.
Reliability Standards adopted by the BCUC can be accessed from the BCUC website or
found using the following link:
https://www.wecc.org/Standards/Pages/Default.aspx
3.1
Compliance Audits
WECC will conduct a Compliance Audit of every Entity registered as a Reliability
Coordinator (RC), Balancing Authority (BA), and/or Transmission Operator (TOP) every
three (3) years. All other Entities may be subject to Compliance Audits every six (6)
years or as approved by the BCUC. Any portion of a Compliance Audit may be
conducted on- or off-site, as determined to be appropriate by WECC. The Audit
Schedule is subject to scheduling adjustments.
A Compliance Audit generally encompasses the period of three (3) years preceding the
start of the Compliance Audit and may not go back beyond the date of the Entity’s last
Compliance Audit period. Compliance Audits may include a review of compliance with
all Reliability Standards applicable to the Entity. Compliance Audits will review, at a
minimum, all applicable Reliability Standards identified in Appendix A under the column
marked “Compliance Audit.” Compliance Audits may include a review of any matters
subject to a Compliance Violation Investigation in the previous year, as well as the
status of Mitigation Plans, Self-Reports, Periodic Data Submittals, and may also include
an examination of other items if requested by the BCUC (Note: Periodic Data Submittals
will be assessed only for instances of noncompliance). During the Compliance Audit,
including any time prior to the Compliance Audit, WECC may expand the audit scope if
it determines such an expansion is appropriate.
5
5 of 30
ATTACHMENT A
to Order R-32-20
Subject to possible adjustments, the WECC Compliance Audit Schedule for Entities
scheduled for Compliance Audits during the program year can be identified in Appendix
B. In addition, at least ninety (90) days prior to the commencement of a scheduled
Compliance Audit, WECC will:
1)
notify the Entity of the Compliance Audit;
2)
identify the Compliance Audit team and their recent employment history; and
3)
request information from the Entity.
Reliability Standards Audit Worksheets (RSAWs) for those BC Reliability Standards
selected for audit in 2021 will be provided to the Entities with the Notice of Compliance
Audit.
During the compliance audit engagement, compliance auditors may identify areas that
are not findings of noncompliance, but are valuable to the Entity to raise awareness by
providing an area of concern or recommendation as described below:
•
An area of concern is a situation that does not appear to involve a current or
ongoing violation of a BC Reliability Standard requirement, but instead represents
a situation or practice that could become a violation if not corrected.
•
A recommendation is a notification to an Entity of a situation where there may be
opportunity for improving compliance related processes, procedures, or tools.
When the draft Audit Report review process is complete, as described in the
Compliance Monitoring Program, WECC will provide the final Audit Report to the BCUC
and the Entity. The final Audit Report is considered to be accepted by the BCUC thirty
(30) days after WECC provides it unless the BCUC directs otherwise.
Section 2.1 of the Compliance Monitoring Program provides information about
Compliance Audits.
3.2
Self-Certifications
Self-Certifications will not be a required component of compliance monitoring during the
2021 Implementation Plan year. Existing monitoring methods may be used by WECC to
request demonstration of compliance.
3.3
Spot-Checks
WECC may perform Spot-Checks at any time. Spot-Checks may be performed either
on- or off-site at WECC’s discretion.
6
6 of 30
ATTACHMENT A
to Order R-32-20
Spot-Checks may require submission of information by the Entity to WECC. WECC will
provide at least twenty (20) days advance notice of a Spot-Check to the Entity and will
provide a copy of the notice to the BCUC. The notice will include the reason(s) for the
Spot-Check, the Reliability Standards subject to the Spot-Check, and the date the Entity
is to submit or otherwise make the required information available to WECC.
Section 2.3 of the Compliance Monitoring Program provides further information about
Spot Checks.
3.4
Compliance Violation Investigations
After BCUC approval, WECC may perform a Compliance Violation Investigation at any
time in response to a system disturbance, Complaint, or Possible Violation of a
Reliability Standard identified by any other means, or as otherwise directed by the
BCUC. WECC will notify the Entity within three (3) business days of the decision to
initiate a Compliance Violation Investigation and the reason(s) for the investigation.
Section 2.4 of the Compliance Monitoring Program provides further information about
Compliance Violation Investigations.
3.5
Self-Reports
Entities are encouraged to file Self-Reports with WECC on a timely basis when they
become aware of a Possible Violation of a Reliability Standard. An Entity should Self-
Report a Possible Violation after it has evaluated the facts and circumstances of the
issue and determined that a potential non-compliance of a Reliability Standard has
occurred and a Self-Report must include details and evidence of the potential non
compliance. Entities are encouraged to complete this evaluation as soon as possible to
ensure timely reporting. Filing a Self-Report is encouraged regardless of whether the
Reliability Standard requires reporting on a pre-defined schedule, such as through
Periodic Data Submittals.
WECC will review Self-Reports and may request that the Entity provide additional
clarification or additional information. WECC will notify the Entity of the results of its
review in a notification of Find, Fix, Track Processing, Notice of Alleged Violation, or in a
notification of Self-Report dismissal.
Section 2.5. of the Compliance Monitoring Program provides further information about
Self-Reporting.
The webCDMS Regional Entity Quick Start Guide provides information regarding Self-
Report submittals.
7
7 of 30
ATTACHMENT A
to Order R-32-20
3.6
Periodic Data Submittals
Some Reliability Standards require the periodic submittal of information to demonstrate
compliance with the requirements of the standard. Entities are required to provide to
WECC Periodic Data Submittals for all applicable Reliability Standards identified in
Appendix A under the column marked “Periodic Data Submittal.”
The reporting intervals and timing are contained within the applicable Reliability
Standards. WECC will issue a request to the Entity for a Periodic Data Submittal at least
twenty (20) days prior to the required submittal date.
WECC will review the Periodic Data Submittals and may request the Entity to provide
clarification or additional information. If WECC identifies a Possible Violation, then it
may (and if directed by the BCUC will), provide the BCUC and the Entity with a
notification of Find, Fix, Track Processing or Notice of Alleged Violation, as explained in
Section 5 of this Implementation Plan.
Section 2.6 of the Compliance Monitoring Program provides further information about
Periodic Data Submittals.
The webCDMS Regional Entity Quick Start Guide provides information concerning the
Periodic Data Submittal process.
4.
Reliability Standards Subject to the
Implementation Plan
Each Entity is responsible for compliance with all Reliability Standards adopted by the
BCUC that apply to the functions for which each Entity is registered. However, a subset
of those Reliability Standards may be actively monitored as set forth in this
Implementation Plan for 2021.
4.1
Actively Monitored Reliability Standards
For 2021, WECC will actively monitor, at a minimum, the Reliability Standards identified
in Appendix A using the monitoring processes specified in Appendix A. As revisions and
additions to Reliability Standards are approved by the BCUC, the revised and additional
standards may be added to the Actively Monitored Standards List for monitoring in the
same manner as the standards and requirements they are replacing for the appropriate
time period.
The Actively Monitored Standards List for British Columbia was developed in
coordination with the process used for selecting areas of focus recommended by the
8
8 of 30
ATTACHMENT A
to Order R-32-20
North American Electric Reliability Corporation (NERC) and WECC. This process
incorporates some elements of NERC’s areas of focus by using its annual Compliance
Monitoring and Enforcement Program Implementation Plan regarding those Standards
and Requirements related to industry and regional perspectives on greater risks to the
reliability of the bulk power system.
Entities are responsible for compliance with all BCUC-approved Reliability
Standards in effect for their applicable function(s) at all times.
5.
Violation Review Process
5.1 Initial Review
WECC will consider all evidence provided in conjunction with a possible non
compliance with a Reliability Standard and will proceed as follows, unless ordered
otherwise by the BCUC.
5.1.1 If WECC considers that there is no evidence to substantiate a Possible Violation,
no further process applies and WECC will notify the Entity and the BCUC that the
Possible Violation is dismissed and no further action is required.
5.1.2 If WECC identifies a Possible Violation as one that may be processed under the
BC Find, Fix, Track (FFT) Process, WECC will follow the BC FFT Process
described in section 4.2 of the Compliance Monitoring Program.
5.1.3 If WECC identifies a Possible Violation as one that may not be processed under
the BC FFT Process, WECC will follow the Alleged Violation Process in section
4.3 of the Compliance Monitoring Program.
5.1.4 If a Possible Violation has been identified and considered under one monitoring
process, WECC will not review the same occurrence if it is subsequently
identified as a Possible Violation under another monitoring process unless it
appears that significant additional information is available. If significant additional
information is available, the scope of a Possible Violation may be expanded.
5.2
BC Find, Fix, Track Process
The BCUC may approve alterations to the BC FFT process if such alterations
appear to present material benefits for furthering reliability objectives and promoting
administrative efficiencies in the BC MRS Program. Alterations to the BC FFT Process
may be included in the annual Implementation Plan or otherwise approved by the
9
9 of 30
ATTACHMENT A
to Order R-32-20
BCUC.
5.2.1 WECC will perform an FFT review on a Possible Violation before
considering following the Alleged Violation Process in section 4.3 of the
Compliance Monitoring Program.
5.2.2 Unless the BCUC orders that other factors are to be considered, WECC will
consider the following in performing an FFT review:
1)
The specific Reliability Standard(s) possibly violated;
2)
The facts and circumstances (i.e., what happened, how, where and when) of
the Possible Violation;
3)
The extent of the condition (how far reaching) of the Possible Violation.
4)
The underlying cause(s) of the Possible Violation.
5)
The assessment of potential and actual level of risk to reliability of the bulk
power system, including mitigating factors during the period of Possible
Violation;
6)
Whether the Entity has mitigated or begun mitigation of the Possible Violation
or not.
a.
Mitigation may be documented through Mitigating Activities or a
Mitigation Plan. Activities related to the remediation efforts must be
explicitly articulated.
b.
Mitigating Activities may or may not be complete at the time the Entity
provides the information to WECC. Mitigating Activities are generally
less complex and therefore a formal Mitigation Plan is not necessary.
c.
Mitigating Activities or Mitigation Plan for a Possible Violation in the BC
FFT Process generally requires the expected mitigation completion be
within three (3) months of submittal.
7)
Information WECC may have about the perceived strength of the Entity’s
compliance program; including compensating measures, internal controls and
culture of compliance;
8)
Information that WECC may have about the Entity’s compliance history; and
9)
Whether aggravating factors are present. The presence of such may warrant
the escalation of a Possible Violation to an Alleged Violation.
5.2.3 WECC will notify the BCUC and the Entity in writing that it will follow the BC FFT
Process. If, within thirty (30) days after that notice is sent, either: (a) the BCUC
10
10 of 30
ATTACHMENT A
to Order R-32-20
directs WECC to proceed under any other process, or (b) the Entity provides a
written request to WECC, with a copy to the BCUC, requesting that the Alleged
Violation Process be followed instead, then WECC will instead follow the Alleged
Violation Process or such other process the BCUC may direct.
5.2.4 Unless the BCUC orders otherwise, Possible Violations that are processed under
the BC FFT Process will not be processed as Alleged Violations and will not
become Confirmed Violations. A Possible Violation resolved through the BC FFT
Process will not be classified as a contravention under the Act and will not attract
administrative penalties. However, the existence of earlier Possible Violations
that have been resolved through the BC FFT Process will be part of the Entity’s
compliance history that may be considered by the BCUC in determining penalties
for other contraventions for the Entity.
5.2.5 Mitigation information is an important consideration of whether a Possible
Violation is considered for the BC FFT Process. Nonetheless, if a Possible
Violation included in the BC FFT Process has not yet been mitigated, the Entity
must submit a Mitigation Plan to WECC, or a description of how the Possible
Violation will be mitigated through Mitigating Activities, within thirty (30) days after
WECC notifies the Entity that it will follow the BC FFT Process. The provisions of
section 5.0 of the Compliance Monitoring Program regarding Mitigation Plans are
applicable.
5.2.6 In order for a Possible Violation to be considered resolved through the BC FFT
Process, an Entity must provide an Attestation acceptable to WECC describing
the remediation work completed along with supporting evidence.
5.2.7 The BCUC will consider a Possible Violation matter closed when WECC reports it
to the BCUC as a Remediated FFT Issue, unless the BCUC provides notice to
WECC and the Entity at any time that further review will be required.
5.2.8 WECC will report items processed as FFTs to the BCUC within thirty (30) days of
notifying an Entity of an FFT.
5.2.9 If at any point it appears to the BCUC that Remediated FFT Issue status was
achieved on the basis of a material misrepresentation of facts, the BCUC may
remand the Remediated FFT Issue and direct WECC to process the matter as an
Alleged Violation. The duration of the Alleged Violation may be considered to
begin with the original start date of what had been considered to be a
Remediated FFT Issue. Particulars of a misrepresentation may be considered by
11
11 of 30
ATTACHMENT A
to Order R-32-20
the BCUC in determining any sanctions that the BCUC may determine to be
applicable.
5.2.10 The BCUC may publish status reports including the name of Entities with
Possible Violations in the BC FFT Process or Remediated FFT Issues and
details of the nature of the Possible Violations and Remediated FFT Issues,
unless disclosure relates to a cyber-security incident or would jeopardize the
security of the bulk power system.
5.2.11 If WECC identifies a Possible Violation as not one that WECC would process as
an FFT under the BC FFT Process, the Alleged Violation Process described in
section 4.3 of the Compliance Monitoring Program would proceed.
5.3
Contents of Notice of Alleged Violation
If WECC concludes, based on the facts and circumstances, that evidence exists to
indicate an Entity has violated a Reliability Standard, WECC will issue a Notice of
Alleged Violation (NOAV) to the BCUC and the Entity’s Compliance Contact and
Authorizing Officer.
The NOAV will contain:
•
The Reliability Standard and specific requirements that are the subject matter of
the Alleged Violation;
•
The date(s) the Alleged Violation occurred (or is occurring);
•
A description of the facts and evidence that allegedly demonstrates or constitutes
the Alleged Violation;
•
A description of the severity of the Alleged Violation;
•
A description of the cause(s) of the Alleged Violation;
•
Reference Violation Risk Factor (VRF) and Violation Severity Level (VSL) factors
relevant to the circumstances of the Alleged Violation.
•
WECC’s risk assessment of the Alleged Violation based on the facts and
evidence.
•
A description of the accepted Mitigation Plan for the Alleged Violation, if already
submitted to WECC;
•
A proposed penalty amount, if any, which references the base penalty range for
the potential contravention under the BC Penalty matrix, as described in
Appendix 3 of the Rules of Procedure for Reliability Standards in BC.
12
12 of 30
ATTACHMENT A
to Order R-32-20
•
A detailed reminder of:
i.
the Entity’s rights and obligations pursuant to the Entity’s response to the
NOAV, as described in Section 4.3 and 4.4 of the BCUC Compliance
Monitoring Program; and
ii.
the processes associated with submission of Mitigation Plans, as described in
Section 5.0 of the BCUC Compliance Monitoring Program, if applicable.
Section 4.3 of the Compliance Monitoring Program provides further information about a
NOAV.
6.
Mitigation Plans
The BCUC and WECC strongly encourage Entities to thoroughly and swiftly mitigate
any suspected non-compliance as soon as that non-compliance has been discovered.
Entities must submit Mitigation Plans in accordance with the timelines and requirements
in Section 5.0 of the BCUC Compliance Monitoring Program.
6.1
Proposed Mitigation Plans
The Entity will submit proposed Mitigation Plans to WECC using webCDMS. WECC will
notify the Entity and the BCUC once its review is complete.
If WECC agrees with the proposed Mitigation Plan, it will promptly forward the Mitigation
Plan to the BCUC and the Entity, and include a letter recommending its acceptance.
The approval and rejection process for Mitigation Plans is governed by Section 5.7 of
the Compliance Monitoring Program.
Section 5.0 of the Compliance Monitoring Program provides further information about
Mitigation Plans.
The webCDMS Regional Entity Quick Start Guide provides information regarding
Mitigation Plan submittal.
6.2
Implementation of Mitigation Plans
The Entity must provide WECC with updates by each milestone due date regarding the
progress of its Mitigation Plan. WECC will track implementation of Mitigation Plans.
WECC may conduct on-site visits and review the Mitigation Plan’s status during
Compliance Audits or other monitoring efforts, to monitor implementation.
The Entity may submit requests to revise its Mitigation Plan or extend the Mitigation
Plan completion date to WECC and the BCUC. WECC will review these requests and
make recommendations for BCUC acceptance or rejection.
13
13 of 30
ATTACHMENT A
to Order R-32-20
WECC may offer mitigation assistance to an Entity if the Alleged Violation is of serious
risk to the bulk power system and the cause appears to be a systemic failure of an
Entity’s implementation of a Reliability Standard and Requirement and/or a
programmatic failure of the Entity’s compliance program. The level of mitigation
assistance offered will be at WECC’s discretion unless otherwise directed by the BCUC.
6.3
Completion of Mitigation Plans
Upon completion of a Mitigation Plan, the Entity must provide attestation as soon as
reasonably possible to WECC that all required actions described in the Mitigation Plan
have been completed. The attestation is to be submitted using webCDMS, and the
Entity will include information and evidence sufficient to verify completion. The BCUC or
WECC may conduct a Spot-Check and review the status during Compliance Audits or
other monitoring efforts to verify that all required actions in the Mitigation Plan have
been completed.
If WECC agrees that a Mitigation Plan has been completed, it will promptly forward a
letter to the BCUC recommending approval. The Entity will also be included in this
correspondence.
If WECC disagrees that the Mitigation Plan has been completed, it will notify the Entity
and provide detailed reasons for the disagreement. WECC will request the Entity submit
a revised Mitigation Plan, which begins the submittal and review process again. The
Entity may appeal to the BCUC as provided in Section 5.8 of the BCUC Compliance
Monitoring Program.
The webCDMS Regional Entity Quick Start Guide provides information regarding
Attestation of Mitigation Plan Completion submittal.
7.
Outreach
WECC values the relationship it has with every member and entity in the Western
Interconnection. WECC is working to strengthen stakeholder relations, improve
communications, and promote meaningful training and educational opportunities while
providing appropriate assistance with compliance. Participation at outreach events is
encouraged and questions welcomed from every member and Entity. WECC’s outreach
program includes:
•
Reliability and Security Workshops
•
webCDMS and EFT Server Training
14
14 of 30
ATTACHMENT A
to Order R-32-20
•
Open Webinar Sessions
•
Questions and Answers by Subject Matter Experts
•
Compliance Questions and Answers
WECC welcomes the opportunity to combine its efforts to promote and maintain a
reliable bulk power system in the Western Interconnection with those of its members
and the Entities. As part of its outreach effort, WECC works with the Western
Interconnection Compliance Forum (WICF) to further understand the needs of Entities
in the region. Questions concerning the WECC Outreach program should be directed to
oversight@wecc.org.
Additional information can be found on the WECC Outreach home page using the
following link: https://www.wecc.org/TrainingAndEducation/Pages/Compliance.aspx
7.1
Reliability and Security Workshops
Reliability and Security Workshops provide an experience with timely and engaging
content to help keep Entities compliant, participate in interactive presentations to better
facilitate knowledge transfer, and network with peers to gain further insights into best
practices. Reliability and Security Workshops are open to the public and anyone with an
interest in activities in the Western Interconnection may attend. Reliability and Security
Workshops are held in person two (2) times per year in cities in the West. The
workshops may also be conducted via Webinar.
7.2
webCDMS and EFT Server Training
WECC will offer training on changes or enhancements made to the webCDMS and EFT
Server processes for all Entities. Periodic updates will be provided during the monthly
Open Webinars. The webCDMS Regional Entity Quick Start Guide provides information
on how to navigate and report compliance data through webCDMS.
Questions concerning webCDMS or EFT Server processes should be directed to
oversight@wecc.org. Assistance with webCDMS or the EFT Server is also available by
telephone at (801) 883-6879.
7.3
Open Webinars
The monthly “Open Webinar” provides an opportunity for open discussion regarding
pre-determined standards and compliance topics. They are followed by an open Q&A
period. All Entities are invited and encouraged to participate, along with WECC
Reliability and Security Oversight staff and Subject Matter Experts. Typically, these calls
do not provide a forum to address entity-specific questions and issues. Any Entity with
specific questions can contact WECC Reliability and Security Oversight staff directly.
15
15 of 30
ATTACHMENT A
to Order R-32-20
WECC records the Open Webinars and provides access to these recordings on its
website for a 30-day period following the calls.
The Open Webinars for all entities in the Western Interconnection are scheduled for the
third Thursday of each month at 2:00 p.m. Mountain Time.
7.4
Questions and Answers by Subject Matter Experts
WECC Subject Matter Experts exhibit the highest level of expertise in performing the
Reliability Standards audit and investigation processes, as well as the violation review
processes. Each Subject Matter Expert has special, in-depth knowledge of a Reliability
Standard or area of discipline. This enhances the team’s overall skill, knowledge, and
competence. Each Subject Matter Expert is available to address specific entity
questions regarding compliance and mitigation of non-compliance.
Contact information can be found on the WECC Compliance Subject Matter Expert list
using the following link: https://www.wecc.org/Pages/Compliance-Contacts.aspx
7.5
Compliance Questions and Answers
The WECC Reliability and Security Oversight department appreciates the need for
Entities to pose compliance-related questions. WECC has set up the
oversight@wecc.org email address to provide an avenue for WECC to answer these
questions. WECC logs every question and the appropriate WECC Subject Matter Expert
provides a response. If a telephone call is preferred to an email, calls made to (801)
883-6879 are answered and forwarded to the appropriate WECC staff member or
Subject Matter Expert.
16
16 of 30
2021 ACTIVELY MONITORED STANDARDS LIST FOR BC
NOTES:
1) This Actively Monitored Standards List reflects BCUC-approved Reliability Standards that have been selected for particular monitoring in 2021 as set forth in the 2021 Implementation Plan for BC.
Note that for Periodic Data Submittals, reporting intervals and timing are specified in the applicable Reliability Standards, and event-driven Periodic Data Submittals are in addition to scheduled
Periodic Data Submittals in the table below. Self-Reports are encouraged.
2) Entities are responsible for compliance with all BCUC-approved Reliability Standards in effect per their registered function at all times, regardless of what is specified as actively monitored in the
standards below.
3) As revisions and additions to Reliability Standards are approved by the BCUC, the revised and additional standards and requirements may be applicable to this list for particular monitoring in the
same manner as those standards and requirements they may be replacing.
BCUC-approved
Reliability
Reliability
Standard
List of Functions
Standard
Requirement Number
Monitored in BC
BAL-003-1.1
R1.
BAL-003-1.1
R2.
BAL-003-1.1
R3.
BAL-003-1.1
R3.1.
BAL-003-1.1
R3.2.
BAL-003-1.1
R4.
BAL-005-1
R4.
BAL-005-1
R4.1.
BAL-005-1
R4.1.1.
BAL-005-1
R4.1.2.
BAL-005-1
R4.2.
1
ATTACHMENT A
to Order R-32-20
APPENDIX A
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
Scheduled Periodic
Data Submittals:
Compliance Audit
Monthly
(X)
Quarterly
Yearly
BA
Yearly
BA
Yearly
BA
Yearly
BA
Yearly
BA
Yearly
BA
Yearly
BA
Monthly
BA
Monthly
BA
Monthly
BA
Monthly
BA
Monthly
17 of 30
2021 ACTIVELY MONITORED STANDARDS LIST FOR BC
BCUC-approved
Reliability
List of Functions
Reliability
Standard
Monitored in BC
Standard
Requirement Number
BAL-005-1
R4.3.
CIP-002-5.1a
R1
RC, BA, GO, GOP, TO, TOP, DP
CIP-002-5.1a
R1.1.
RC, BA, GO, GOP, TO, TOP, DP
CIP-002-5.1a
R1.2.
RC, BA, GO, GOP, TO, TOP, DP
CIP-002-5.1a
R1.3.
RC, BA, GO, GOP, TO, TOP, DP
CIP-002-5.1a
R2.
RC, BA, GO, GOP, TO, TOP, DP
CIP-002-5.1a
R2.1.
RC, BA, GO, GOP, TO, TOP, DP
CIP-002-5.1a
R2.2.
RC, BA, GO, GOP, TO, TOP, DP
CIP-004-6
R4.
RC, BA, GO, GOP, TO, TOP, DP
CIP-004-6
R4.1.
RC, BA, GO, GOP, TO, TOP, DP
CIP-004-6
R4.2.
RC, BA, GO, GOP, TO, TOP, DP
CIP-004-6
R4.3.
RC, BA, GO, GOP, TO, TOP, DP
CIP-004-6
R4.4.
RC, BA, GO, GOP, TO, TOP, DP
CIP-004-6
R5.
RC, BA, GO, GOP, TO, TOP, DP
CIP-004-6
R5.1.
RC, BA, GO, GOP, TO, TOP, DP
CIP-004-6
R5.2.
RC, BA, GO, GOP, TO, TOP, DP
2
ATTACHMENT A
to Order R-32-20
APPENDIX A
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
Scheduled Periodic
Compliance Audit
Data Submittals:
(X)
Monthly
Quarterly
Yearly
BA
Monthly
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
18 of 30
ATTACHMENT A
to Order R-32-20
APPENDIX A
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
2021 ACTIVELY MONITORED STANDARDS LIST FOR BC
Scheduled Periodic
BCUC-approved
Reliability
List of Functions
Compliance Audit
Data Submittals:
Reliability
Standard
Monitored in BC
(X)
Monthly
Standard
Requirement Number
Quarterly
Yearly
CIP-004-6
R5.3.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-004-6
R5.4.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-004-6
R5.5.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-005-5
R1.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-005-5
R1.1.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-005-5
R1.2.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-005-5
R1.3.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-005-5
R1.4.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-005-5
R1.5.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-005-5
R2.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-005-5
R2.1.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-005-5
R2.2.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-005-5
R2.3.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-006-6
R1.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-006-6
R1.1.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-006-6
R1.2.
RC, BA, GO, GOP, TO, TOP, DP
X
3
19 of 30
ATTACHMENT A
to Order R-32-20
APPENDIX A
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
2021 ACTIVELY MONITORED STANDARDS LIST FOR BC
Scheduled Periodic
BCUC-approved
Reliability
List of Functions
Compliance Audit
Data Submittals:
Reliability
Standard
Monitored in BC
(X)
Monthly
Standard
Requirement Number
Quarterly
Yearly
CIP-006-6
R1.3.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-006-6
R1.4.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-006-6
R1.5.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-006-6
R1.6.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-006-6
R1.7.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-006-6
R1.8.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-006-6
R1.9.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-006-6
R1.10.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-007-6
R1.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-007-6
R1.1.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-007-6
R1.2.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-007-6
R2.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-007-6
R2.1.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-007-6
R2.2.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-007-6
R2.3.
RC, BA, GO, GOP, TO, TOP, DP
X
CIP-007-6
R2.4.
RC, BA, GO, GOP, TO, TOP, DP
X
4
20 of 30
2021 ACTIVELY MONITORED STANDARDS LIST FOR BC
BCUC-approved
Reliability
Reliability
Standard
List of Functions
Monitored in BC
Standard
Requirement Number
CIP-007-6
R3.
RC, BA, GO, GOP, TO, TOP, DP
CIP-007-6
R3.1.
RC, BA, GO, GOP, TO, TOP, DP
CIP-007-6
R3.2.
RC, BA, GO, GOP, TO, TOP, DP
CIP-007-6
R3.3.
RC, BA, GO, GOP, TO, TOP, DP
CIP-010-2
R1.
RC, BA, GO, GOP, TO, TOP, DP
CIP-010-2
R1.1.
RC, BA, GO, GOP, TO, TOP, DP
CIP-010-2
R1.2.
RC, BA, GO, GOP, TO, TOP, DP
CIP-010-2
R1.3.
RC, BA, GO, GOP, TO, TOP, DP
CIP-010-2
R1.4.
RC, BA, GO, GOP, TO, TOP, DP
CIP-010-2
R1.5.
RC, BA, GO, GOP, TO, TOP, DP
CIP-010-2
R4.
RC, BA, GO, GOP, TO, TOP, DP
CIP-011-2
R1.
RC, BA, GO, GOP, TO, TOP, DP
CIP-011-2
R1.1.
RC, BA, GO, GOP, TO, TOP, DP
CIP-011-2
R1.2.
RC, BA, GO, GOP, TO, TOP, DP
CIP-014-2
R1.
CIP-014-2
R1.2.
5
ATTACHMENT A
to Order R-32-20
APPENDIX A
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
Scheduled Periodic
Compliance Audit
Data Submittals:
(X)
Monthly
Quarterly
Yearly
X
X
X
X
X
X
X
X
X
X
X
X
X
X
TO
X
TO
X
21 of 30
2021 ACTIVELY MONITORED STANDARDS LIST FOR BC
BCUC-approved
Reliability
Reliability
Standard
List of Functions
Monitored in BC
Standard
Requirement Number
CIP-014-2
R2.
CIP-014-2
R2.1.
CIP-014-2
R2.2.
CIP-014-2
R2.3.
CIP-014-2
R2.4.
CIP-014-2
R3.
CIP-014-2
R3.1.
CIP-014-2
R4.
CIP-014-2
R4.1.
CIP-014-2
R4.2.
CIP-014-2
R4.3.
CIP-014-2
R5.
CIP-014-2
R5.1.
CIP-014-2
R5.2.
CIP-014-2
R5.3.
CIP-014-2
R5.4.
6
ATTACHMENT A
to Order R-32-20
APPENDIX A
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
Scheduled Periodic
Compliance Audit
Data Submittals:
(X)
Monthly
Quarterly
Yearly
TO
X
TO
X
TO
X
TO
X
TO
X
TO
X
TO
X
TO
X
TO
X
TO
X
TO
X
TO
X
TO
X
TO
X
TO
X
TO
X
22 of 30
2021 ACTIVELY MONITORED STANDARDS LIST FOR BC
BCUC-approved
Reliability
Reliability
Standard
List of Functions
Standard
Requirement Number
Monitored in BC
CIP-014-2
R6.
CIP-014-2
R6.1
CIP-014-2
R6.2.
CIP-014-2
R6.3.
CIP-014-2
R6.4.
EOP-006-3
R1
EOP-006-3
R1.1
EOP-006-3
R1.2
EOP-006-3
R1.3
EOP-006-3
R1.4
EOP-006-3
R1.5.
EOP-006-3
R1.6.
EOP-006-3
R2
EOP-006-3
R5
EOP-006-3
R5.1.
FAC-003-4
R1.
TO, GO
7
ATTACHMENT A
to Order R-32-20
APPENDIX A
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
Scheduled Periodic
Data Submittals:
Compliance Audit
Monthly
(X)
Quarterly
Yearly
TO
X
TO
X
TO
X
TO
X
TO
X
RC
X
RC
X
RC
X
RC
X
RC
X
RC
X
RC
X
RC
X
RC
X
RC
X
X
Quarterly
23 of 30
2021 ACTIVELY MONITORED STANDARDS LIST FOR BC
BCUC-approved
Reliability
Reliability
Standard
List of Functions
Standard
Requirement Number
Monitored in BC
FAC-003-4
R1.1
TO, GO
FAC-003-4
R1.2
TO, GO
FAC-003-4
R1.3.
TO, GO
FAC-003-4
R1.4.
TO, GO
FAC-003-4
R2.
TO, GO
FAC-003-4
R2.1.
TO, GO
FAC-003-4
R2.2.
TO, GO
FAC-003-4
R2.3.
TO, GO
FAC-003-4
R2.4.
TO, GO
FAC-003-4
R3.
TO, GO
FAC-003-4
R3.1.
TO, GO
FAC-003-4
R3.2.
TO, GO
FAC-003-4
R6.
TO, GO
FAC-003-4
R7.
TO, GO
FAC-003-4
R7.1.
TO, GO
FAC-003-4
R7.2.
TO, GO
8
ATTACHMENT A
to Order R-32-20
APPENDIX A
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
Scheduled Periodic
Compliance Audit
Data Submittals:
Monthly
(X)
Quarterly
Yearly
X
Quarterly
X
Quarterly
X
Quarterly
X
Quarterly
X
Quarterly
X
Quarterly
X
Quarterly
X
Quarterly
X
Quarterly
X
X
X
X
X
X
X
24 of 30
2021 ACTIVELY MONITORED STANDARDS LIST FOR BC
BCUC-approved
Reliability
Reliability
Standard
List of Functions
Monitored in BC
Standard
Requirement Number
FAC-003-4
R7.3.
TO, GO
FAC-003-4
R7.4.
TO, GO
FAC-003-4
R7.5.
TO, GO
FAC-003-4
R7.6.
TO, GO
FAC-003-4
R7.7.
TO, GO
FAC-003-4
R7.8.
TO, GO
FAC-003-4
R7.9.
TO, GO
FAC-008-3
R6.
GO, TO
FAC-011-3
R1
FAC-011-3
R1.1
FAC-011-3
R1.2
FAC-011-3
R1.3
IRO-002-5
R5.
IRO-008-2
R4.
IRO-010-2
R2.
IRO-010-2
R3.
RC, BA, GO, GOP, TO, TOP, DP
9
ATTACHMENT A
to Order R-32-20
APPENDIX A
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
Scheduled Periodic
Data Submittals:
Compliance Audit
(X)
Monthly
Quarterly
Yearly
X
X
X
X
X
X
X
X
RC
X
RC
X
RC
X
RC
X
RC
X
RC
X
RC
X
X
25 of 30
ATTACHMENT A
to Order R-32-20
APPENDIX A
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
2021 ACTIVELY MONITORED STANDARDS LIST FOR BC
Scheduled Periodic
BCUC-approved
Reliability
Reliability
Standard
List of Functions
Compliance Audit
Data Submittals:
Monthly
Standard
Requirement Number
Monitored in BC
(X)
Quarterly
Yearly
PRC-004-5(i)
R1.
TO, GO, DP
X
PRC-004-5(i)
R1.1.
TO, GO, DP
X
PRC-004-5(i)
R1.2.
TO, GO, DP
X
PRC-004-5(i)
R1.3.
TO, GO, DP
X
PRC-004-5(i)
R3.
TO, GO, DP
X
PRC-004-5(i)
R4.
TO, GO, DP
X
PRC-004-5(i)
R5.
TO, GO, DP
X
PRC-004-5(i)
R6.
TO, GO, DP
X
PRC-005-6
R3.
TO, GO, DP
X
PRC-019-2
R1.
GO, TO
X
PRC-019-2
R1.1.
GO, TO
X
PRC-019-2
R1.1.1.
GO, TO
X
PRC-019-2
R1.1.2.
GO, TO
X
PRC-019-2
R2.
GO, TO
X
PRC-021-1
R1.
DP, TO
Yearly
PRC-021-1
R1.1.
DP, TO
Yearly
10
26 of 30
2021 ACTIVELY MONITORED STANDARDS LIST FOR BC
BCUC-approved
Reliability
Reliability
Standard
List of Functions
Standard
Requirement Number
Monitored in BC
PRC-021-1
R1.2.
DP, TO
PRC-021-1
R1.3.
DP, TO
PRC-021-1
R1.4.
DP, TO
PRC-021-1
R1.5.
DP, TO
PRC-023-4
R1.
TO, GO, DP
PRC-023-4
R2.
TO, GO, DP
PRC-023-4
R5.
TO, GO, DP
PRC-024-2
R1.
PRC-024-2
R2.
TOP-006-2
R2.
BA, TOP
VAR-501-WECC-3.1
R1.
VAR-501-WECC-3.1
R1.1.
VAR-501-WECC-3.1
R1.2.
VAR-501-WECC-3.1
R1.3.
VAR-501-WECC-3.1
R1.4.
VAR-501-WECC-3.1
R1.5.
11
ATTACHMENT A
to Order R-32-20
APPENDIX A
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
Scheduled Periodic
Compliance Audit
Data Submittals:
Monthly
(X)
Quarterly
Yearly
Yearly
Yearly
Yearly
Yearly
X
X
X
GO
X
GO
X
X
GOP
Quarterly
GOP
Quarterly
GOP
Quarterly
GOP
Quarterly
GOP
Quarterly
GOP
Quarterly
27 of 30
2021 ACTIVELY MONITORED STANDARDS LIST FOR BC
BCUC-approved
Reliability
List of Functions
Reliability
Standard
Monitored in BC
Standard
Requirement Number
VAR-501-WECC-3.1
R1.6.
VAR-501-WECC-3.1
R1.7.
VAR-501-WECC-3.1
R1.8.
VAR-501-WECC-3.1
R1.9.
VAR-501-WECC-3.1
R1.10.
VAR-501-WECC-3.1
R1.11.
VAR-501-WECC-3.1
R1.12.
12
ATTACHMENT A
to Order R-32-20
APPENDIX A
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
Scheduled Periodic
Compliance Audit
Data Submittals:
(X)
Monthly
Quarterly
Yearly
GOP
Quarterly
GOP
Quarterly
GOP
Quarterly
GOP
Quarterly
GOP
Quarterly
GOP
Quarterly
GOP
Quarterly
28 of 30
ATTACHMENT A
to Order R-32-20
BC Actively Monitored Standards List
Revision History for 2021
Revision
Number
Description
0
Initial version.
29 of 30
ATTACHMENT A
to Order R-32-20
APPENDIX B
2021 IMPLEMENTATION PLAN FOR MONITORING COMPLIANCE
WITH BRITISH COLUMBIA RELIABILITY STANDARDS
2021 Audit Schedule for British Columbia
WECC ID
ACRONYM
REGISTERED ENTITY NAME
TEAM
AUDIT
TYPE
TYPE
BEGIN DATE
END DATE
LOCATION
WCR0003
BCHA
British Columbia Hydro and
O&P
Power Authority
On-site
03/22/2021
04/09/2021
Langley, BC
CIP
O&P
WCR0005
FBC
FortisBC Inc.
On-site
07/19/2021
08/06/2021
Trail, BC
CIP
Entities will be audited for all registered functions.
30 of 30