Orders

Decision Information

Decision Content

ORDER NUMBER

G-79-21

 

IN THE MATTER OF

the Utilities Commission Act, RSBC 1996, Chapter 473

 

and

 

Ka:’yu:'k't'h' / Che:k'tles7et'h' First Nations

Application for Reconsideration and Variance of Order G-65-21

In the matter of Kyuquot Power Ltd. Investigation into the Safety and Reliability of the KPL System

 

BEFORE:

D. M. Morton, Panel Chair

C. Brewer, Commissioner

T. A. Loski, Commissioner

 

on March 17, 2021

 

ORDER

WHEREAS:

 

A.      On March 12, 2021, the Ka:’yu:'k't'h' / Che:k'tles7et'h' First Nations (KCFN) submitted an application with the British Columbia Utilities Commission (BCUC) for reconsideration and variance of Directives 3 and 4 of Order G-65-21 (Reconsideration Application);

B.      On May 15, 2020, by Order G-115-20, the BCUC established a hearing to review the safety and reliability of the Kyuquot Power Ltd. (KPL) system, following a complaint by a representative of KCFN;

C.      On March 8, 2021, the BCUC issued Order G-65-21, which, among other things, directed KPL, as soon as reasonably possible, but no later than March 12, 2021, to request the dispute regarding the locking arrangement and terms of a joint operating order governing gang-operated load break switch S3 (GOLB S3) be referred to mediation, pursuant to Section 11 of the Right of Way Agreement. Directives 3 and 4 of order G-65-21 state:

3.        Until the dispute is resolved, the BCUC requests KCFN, as soon as reasonably possible, but no later than March 12, 2021, to provide KPL a copy of the key for GOLB S3.

4.        Until the dispute is resolved, KCFN and KPL are to notify each other prior to any operation of GOLB S3, although permission of the other party is not required.

D.      In the Reconsideration Application, KCFN requests that Directives 3 and 4 of Order G-65-21 be varied to include a requirement that KPL obtain the permission of KCFN prior to accessing the GOLB S3 and that only qualified personnel be permitted to access GOLB S3;

E.       Part V of the BCUC’s Rules of Practice and Procedure, which are attached to Order G-15-19, sets out the Rules for the reconsideration process; and

F.       The Panel seeks submissions from parties on the Reconsideration Application and considers that establishing a regulatory timetable is warranted.

 

NOW THEREFORE the BCUC orders that the regulatory timetable, as set out in Appendix A to this order, is established to allow for parties’ submissions on the Reconsideration Application.

 

DATED at the City of Vancouver, in the Province of British Columbia, this               17th                day of March 2021.

 

BY ORDER

 

Original signed by:

 

D. M. Morton

Commissioner

 

 

Attachment

 

 


Ka:’yu:'k't'h' / Che:k'tles7et'h' First Nations

Application for Reconsideration and Variance of Order G-65-21

In the matter of Kyuquot Power Ltd. Investigation into the Safety and Reliability of the KPL System

 

REGULATORY TIMETABLE

 

 

Action

Date (2021)

KPL written submission on the Reconsideration Application

Monday, March 22

KCFN reply submission

Friday, March 26

Further process

To be determined

 