ORDER NUMBER

G-191-23

 

IN THE MATTER OF

the Utilities Commission Act, RSBC 1996, Chapter 473

 

and

 

FortisBC Inc.

2024 Annual Review of Rates

 

BEFORE:

A. K. Fung, KC, Panel Chair

T.A. Loski, Commissioner

 

on July 21, 2023

 

ORDER

WHEREAS:

 

A.      On June 22, 2020, the British Columbia Utilities Commission (BCUC) issued its Decision and Order G-165-20 for FortisBC Energy Inc. and G-166-20 for FortisBC Inc. (FBC) approving a Multi-Year Rate Plan for 2020 through 2024 (MRP Decision). In accordance with the MRP Decision, FBC is to conduct an annual review (Annual Review) process to set rates for each year;

B.      On June 23, 2015, the BCUC issued its Decision and Order G-107-15 in the FBC Application for Approval of 2015 Rates, setting out, among other things, the default regulatory timetable template for future Annual Reviews to include:

         Intervener registration;

         One round of BCUC and intervener information requests;

         A workshop which may include BCUC panel participation. The format of the workshop, including who facilitates it, will be determined at each annual review proceeding;

         FBC response to undertakings from the workshop;

         Intervener written final arguments; and

         FBC written reply arguments;

C.      By letter dated June 28, 2023, FBC proposed a regulatory timetable for the 2024 Annual Review of Rates; and

D.      The BCUC has reviewed FBC’s proposal and finds that the establishment of a regulatory timetable for the 2024 Annual Review of Rates is warranted.

 

NOW THEREFORE the BCUC orders as follows:

 

1.       A regulatory timetable for the FBC 2024 Annual Review of Rates is established, as set out in Appendix A to this order.

2.       FBC must provide, by Wednesday, August 9, 2023, a copy of this order and the Application to all registered interveners in the FBC 2023 Annual Review of Rates proceeding.

3.       FBC must provide written confirmation of compliance with Directive 2 to the BCUC by Thursday, August 10, 2023.

 

DATED at the City of Vancouver, in the Province of British Columbia, this             21st           day of July 2023.

 

BY ORDER

 

Original signed by:

 

A. K. Fung, KC

Commissioner

 

 

Attachment

 

 


FortisBC Inc.

2024 Annual Review of Rates

 

REGULATORY TIMETABLE

 

 

Action

Date (2023)

FBC filing of 2024 Annual Review of Rates

Friday, August 4

FBC provides a copy of the order and Application to parties outlined in Directive 2 of the order

Wednesday, August 9

FBC provides confirmation of compliance with Directive 2 of the order

Thursday, August 10

Intervener Registration

Friday, August 18

BCUC and Intervener Information Request (IR) No. 1

Wednesday, August 30

FBC Responses to BCUC and Intervener IR No. 1

Thursday, September 21

Workshop*

Monday, October 23

FBC Responses to Workshop Undertakings (if any)

Friday, October 27

Intervener Final Argument

Thursday, November 16

FBC Reply Argument

Monday, November 27

* The transcribed workshop will be held in the afternoon to review FBC’s 2023 performance results and 2024 rates. The workshop format, start time and location are to be determined.