ORDER NUMBER
G-303-23
IN THE MATTER OF
the Utilities Commission Act, RSBC 1996, Chapter 473
and
British Columbia Hydro and Power Authority
Ladore Spillway Seismic Upgrade Project and Strathcona Discharge Upgrade Project Application
BEFORE:
A.K. Fung, KC, Panel Chair
W.M. Everett, KC, Commissioner
M. Kresivo, KC, Commissioner
on November 9, 2023
ORDER
WHEREAS:
B. The Ladore and Strathcona facilities form part of the Campbell River System, which comprises dams, reservoirs, and generating facilities that are located along the Campbell River on Vancouver Island. BC Hydro submits the Projects are required to address dam safety deficiencies related to the Ladore and Strathcona facilities’ seismic withstand and water discharge capacity that could lead to overtopping and failure of the dams;
C. By Order G-189-23, dated July 18, 2023, the BCUC, among other things, established a written hearing process and a regulatory timetable that includes one round of information requests (IRs), with further process to be determined;
D. On October 17, 2023, in compliance with Order G-189-23, BC Hydro filed its responses to IR No. 1; and
E. The BCUC has reviewed the IR responses and considers a further regulatory timetable for the review of the Application is warranted.
NOW THEREFORE the BCUC establishes a further regulatory timetable, as set out in Appendix A to this order.
DATED at the City of Vancouver, in the Province of British Columbia, this 9th day of November 2023.
BY ORDER
Original signed by:
A.K. Fung, KC
Commissioner
Attachment
British Columbia Hydro and Power Authority
Ladore Spillway Seismic Upgrade Project and Strathcona Discharge Upgrade Project Application
REGULATORY TIMETABLE
Action |
Date (2023) |
BCUC Information Request (IR) No. 2 to BC Hydro |
Thursday, November 16 |
Intervener IR No. 2 to BC Hydro, if any |
Thursday, November 23 |
BC Hydro responses to BCUC and intervener IR No. 2 |
Thursday, December 7 |
BC Hydro final argument |
Thursday, December 14 |
Intervener final argument |
Thursday, December 21 |
Action |
Date (2024) |
BC Hydro reply argument |
Tuesday, January 9 |