ORDER NUMBER
G-354-23
IN THE MATTER OF
the Utilities Commission Act, RSBC 1996, Chapter 473
and
British Columbia Hydro and Power Authority
Public Electric Vehicle Charging Service Rates
BEFORE:
A. K. Fung, KC, Panel Chair
E. B. Lockhart, Commissioner
on December 18, 2023
ORDER
WHEREAS:
A. On July 28, 2023, British Columbia Hydro and Power Authority (BC Hydro) applied to the British Columbia Utilities Commission (BCUC) for approval of the BC Hydro Public Electric Vehicle (EV) Charging Service Rates Application (Application) pursuant to sections 58 to 61 and 90 of the Utilities Commission Act;
B. By Order G-89-21 dated March 23, 2021, the BCUC approved the following time-based Rate Schedules (RS) on an interim, refundable and recoverable basis, effective May 1, 2021:
i. RS 1360 for fast charging service at 25 kilowatt (kW) stations at $0.12 per minute;
ii. RS 1560 for fast charging service at 50 kW stations at $0.21 per minute; and
iii. RS 1561 for fast charging service at 100 kW stations at $0.27 per minute;
C. BC Hydro requests BCUC approval of the following time-based and energy-based EV charging rates, as set out in its new RS 4100, as amended:
Power Level |
Time-Based Charge |
Energy-Based Charge (cents / kWh) |
Level 2 |
3.03 |
28.28 |
Up to 25 kW Fast Charging |
12.23 |
34.34 |
Greater than 25 kW and less than or equal to 50 kW Fast Charging |
21.42 |
34.34 |
Greater than 50 kW and less than or equal to 100 kW Fast Charging |
27.53 |
34.34 |
Greater than 100 kW and less than or equal to 200 kW Fast Charging |
40.40 |
34.34 |
Greater than 200 kW Fast Charging |
50.50 |
34.34 |
Extended Stay Charge |
40 per minute |
D. By Orders G-219-23, G-259-23 and G-263-23 and letter dated December 12, 2023, the BCUC established a regulatory timetable for the review of the Application, which includes public notice, letters of comment, intervener registration, one round of information requests (IR) to BC Hydro, a streamlined review process (SRP), and written final arguments;
E. In its responses to IR No. 1, BC Hydro seeks approval of RS 4100 on an interim, non-refundable and non-recoverable basis to enable BC Hydro to charge for service at its new Level 2 and dual-port 180 kW EV charging stations;
F. On December 11 and 12, 2023, the BCUC conducted the SRP of the Application;
G. At the SRP, BC Hydro updated its interim approval sought for time-based rates for Level 2 and certain fast charging power levels, effective January 1, 2024. BC Hydro clarified that it is not seeking interim approval for rates pertaining to greater than 200 kW fast charging, energy-based rates, or the extended stay charge;
H. BC Hydro also clarifies that it continues to seek approval for RS 4100 on a permanent basis when the BCUC renders its final decision on the Application; and
I. The BCUC has considered BC Hydro’s request for interim rates and determines that approval of interim rates is warranted.
NOW THEREFORE, pursuant to sections 58 to 61 and 90 of the UCA, the BCUC orders as follows:
1. The following time-based rates (with no Deferral Account Rate Rider) in BC Hydro’s RS 4100 for Public EV Charging Service, as set forth below, are approved on an interim basis, effective January 1, 2024:
Power Level |
Time-Based Charge |
Level 2 |
3.03 |
Up to 25 kW Fast Charging |
12.23 |
Greater than 25 kW and less than or equal to 50 kW Fast Charging |
21.42 |
Greater than 50 kW and less than or equal to 100 kW Fast Charging |
27.53 |
Greater than 100 kW and less than or equal to 200 kW Fast Charging |
40.40 |
2. The manner of treatment of any variance(s) between the approved interim and the permanent RS 4100 rates will be determined at the time that the BCUC renders its final decision on the Application.
3. BC Hydro is directed to maintain RS 1360, RS 1560 and RS 1561 until the BCUC renders its final decision on the Application.
4. BC Hydro is directed to file revised tariff pages reflecting the approved RS 4100 interim rates on or before January 5, 2024.
DATED at the City of Vancouver, in the Province of British Columbia, this 18th day of December 2023.
BY ORDER
Original signed by:
A. K. Fung, KC
Commissioner