ORDER NUMBER

G-110-25

 

IN THE MATTER OF

the Utilities Commission Act, RSBC 1996, Chapter 473

 

and

 

Kyuquot Power Ltd.

2026 Revenue Requirements

 

BEFORE:

A. K. Fung, KC, Panel Chair

E. A. Brown, Commissioner

 

on April 30, 2025

 

ORDER

WHEREAS:

 

A.      On April 8, 2025, Kyuquot Power Ltd. (KPL) filed with the British Columbia Utilities Commission (BCUC) an application for approval to amend its electric tariff rate schedules and for other related rate matters (Application);

B.      KPL operates a 14.4 kilovolt single phase distribution line in the area extending from British Columbia Hydro and Power Authority’s (BC Hydro) electrical grid at Oclucje to Kyuquot, serving customers principally in and around Fair Harbour, Chamiss Bay and Kyuquot. Commercial and residential customers are served under Tariff Rate Schedule (RS) 1101 and the Ka:’yu:'k't'h' / Che:k'tles7et'h' First Nations (KCFN) are served under RS 1102;

C.      By Order C-6-24 dated December 20, 2024, the BCUC granted a Certificate of Public Convenience and Necessity to KPL for its Capacity Upgrade Project, which includes a two-phased approach to increasing KPL’s system demand capacity from 550 kilowatts (kW) to approximately 1123 kW through service upgrades at the point of interconnection between the KPL and BC Hydro systems. Phase One includes the installation of a new single phase recloser on both KPL and BC Hydro sides of the interconnection to achieve a KPL system capacity of 700 kW, while Phase Two includes the installation of a voltage regulator on the KPL system to achieve a KPL system capacity of approximately 1123 kW;

D.      KPL requests approval of the following, to be effective the date of the BCUC’s final decision on the Application:

(i)                  An increase of $0.30 per month from $9.70 per month to $10.00 per month to the Basic Charge under RS 1101 and 1102;

(ii)                An increase of $0.0342 per kilowatt hour (kWh) from $0.4446 per kWh to $0.4788 per kWh to the Energy Charge under RS 1101;

(iii)               An increase of $0.0448 per kWh from $0.2646 per kWh to $0.3094 per kWh to the Energy Charge under RS 1102; and

(iv)               The establishment of a rate base regulatory account related to the Capacity Upgrade Project with a 7 percent annual amortization rate, earning KPL’s weighted average cost of capital.

E.       The proposed rate changes are based on KPL’s forecast cost of service or revenue requirements for the period from July 1, 2025 to June 30, 2026; and

F.       The BCUC has commenced its review of the Application and considers that establishing a regulatory timetable is warranted.

 

NOW THEREFORE the BCUC orders as follows:

 

1.       The regulatory timetable for the review of the Application is established as set out in Appendix A to this order.

2.       KPL is directed to provide the Public Notice in Appendix B to this order and a copy of this order to all customers, either electronically or by mail, by Friday, May 9, 2025.

3.       KPL must provide a copy of the Application and this order, electronically where possible, by Friday, May 9, 2025, to KCFN and BC Hydro.

4.       KPL must make the Application available on its website at https://kyuquotpower.com by Friday, May 9, 2025.

5.       KPL is directed to provide written confirmation to the BCUC, by Tuesday, May 13, 2025, of compliance with Directives 2, 3 and 4 of this order.

6.       In accordance with the BCUC Rules of Practice and Procedure, parties who wish to actively participate in the proceeding must complete a Request to Intervene form, available on the Get Involved in a Proceeding section of the BCUC’s website at https://www.bcuc.com/forms/RequestToIntervene, by Wednesday, May 21, 2025.

 

DATED at the City of Vancouver, in the Province of British Columbia, this              30th              day of April 2025.

 

BY ORDER

 

Electronically signed by Anna Fung

 

A. K. Fung, KC

Commissioner

 

 

Attachment


Kyuquot Power Ltd.

2026 Revenue Requirements

 

REGULATORY TIMETABLE

 

 

Action

Date (2025)

KPL public notice of application

Friday, May 9

KPL confirmation of compliance with public notice requirements

Tuesday, May 13

Intervener registration deadline

Wednesday, May 21

BCUC Information Request (IR) No. 1 to KPL

Monday, May 26

Intervener IR No. 1 to KPL

Wednesday, June 4

KPL responses to BCUC and intervener IR No. 1

Monday, June 23

Letters of comment deadline

Wednesday, July 2

KPL final argument

Wednesday, July 9

Intervener final argument

Wednesday, July 23

KPL reply argument

Thursday, August 7

 

 



We want to hear from you

]
 


KYUQUOT POWER LTD. 2026 REVENUE REQUIREMENTS

On April 8, 2025, Kyuquot Power Ltd. (Kyuquot Power) filed an application with the British Columbia Utilities Commission (BCUC) for approval to increase its electricity rates, among other items.

 

Kyuquot Power proposes to increase the Basic and Energy charges for Rate Schedules (RS) 1101 and 1102, due to a forecast increase in service costs. The requested rate increases are for:

 

         RS 1101 – Basic Charge increase of $0.30 per month from $9.70 to $10.00, and an Energy Charge increase of $0.0342 per kilowatt hour (kWh) from $0.4446/kWh to $0.4788/kWh.

         RS 1102 – Basic Charge increase of $0.30 per month from $9.70 to $10.00, and an Energy Charge increase of $0.0448 per kWh from $0.2646/kWh to $0.3094/kWh.

For more information about the application, please visit the Proceeding webpage on bcuc.com under “Our Work - Proceedings”. To receive email notifications when public documents are added to the proceeding, subscribe to the proceeding on bcuc.com.

 


GET INVOLVED

         Submit a letter of comment

         Subscribe to the proceeding

         Request intervener status

 IMPORTANT DATES

1.       Wednesday, May 21, 2025 – Deadline to request intervener status with the BCUC

2.       Wednesday, July 2, 2025 – Deadline to submit a letter of comment to share your views, opinions, and insights on the application

 

CONTACT INFORMATION

 

    Kyuquot Power Ltd.

4248 Broughton Avenue

Niagara Falls, ON  L2E 3K6

 

E: gregsunell@gmail.com

 

P: 604.688.8271

British Columbia Utilities Commission

Suite 410, 900 Howe Street

Vancouver, BC  V6Z 2N3

 

E: Commission.Secretary@bcuc.com

 

P: 604.660.4700

 

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.