June 5, 2025                                                                                                                                                                                                       

 

Sent via email                                                                                                                                                                             Letter L-8-25

 

Ms. Sarah Walsh

Director, Regulatory Affairs

FortisBC Inc.

16705 Fraser Highway

Surrey, BC  V4N 0E8

electricity.regulatory.affairs@fortisbc.com

 

 

Re:          FortisBC Inc. – 2025/2026 Annual Electric Contracting Plan

 

Dear Ms. Walsh,

On May 9, 2025, FortisBC Inc. (FBC) filed its 2025/2026 Annual Electric Contracting Plan (AECP) for the period from October 1, 2025 to September 30, 2026 (2025/2026 operating year) for acceptance by the British Columbia Utilities Commission (BCUC).

The AECP outlines FBC’s plans to meet the peak demand requirements and annual energy requirements for the 2025/2026 operating year and the near future. In addition, it serves to facilitate a more expeditious review for energy supply contracts contemplated in the AECP, each of which require separate acceptance under section 71 of the Utilities Commission Act. The major components of the 2025/2026 AECP are:

1.       A Nomination under the Power Purchase Agreement between FBC and British Columbia Hydro and Power Authority for the 2025/2026 operating year equal to 1,041 GWh, less any firm market contracts that FBC can enter into pursuant to section 5 of the 2025/2026 AECP, and deferred market purchases to account for uncertain and non-firm load; and

2.       FBC’s proposed plan for entering into firm market contracts for operating years 2025/2026 through 2028/2029, which includes maximum incremental market purchases of 309 GWh for operating year 2025/2026 and 23 GWh of peak market purchases to cover forecast capacity shortfalls in June and July 2026.

The BCUC accepts the FBC 2025/2026 AECP and the recommendations contained therein.

The information in the FBC 2025/2026 AECP will be treated as confidential, as requested by FBC, as it contains commercially sensitive information, unless otherwise determined by the BCUC. A copy of FBC’s non-confidential Executive Summary of the 2025/2026 AECP is available to the public and is attached as Appendix A to this letter.

Sincerely,

 

Electronically signed by Sara Hardgrave

 

Sara Hardgrave

Acting Commission Secretary

 

 

GP/db

Enclosure


A document with text on it

AI-generated content may be incorrect.A document with text on it

AI-generated content may be incorrect.A document with text on it

AI-generated content may be incorrect.A document with text and numbers

AI-generated content may be incorrect.A document with text on it

AI-generated content may be incorrect.A paper with text and numbers

AI-generated content may be incorrect.A close-up of a document

AI-generated content may be incorrect.

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.