Orders

Decision Information

Decision Content

 

ORDER NUMBER

G-300-21

 

IN THE MATTER OF

the Utilities Commission Act, RSBC 1996, Chapter 473

 

and

 

Oakridge Energy LP/GP Inc.

Application for a Certificate of Public Convenience and Necessity for a District Energy System

 

BEFORE:

R. I. Mason, Panel Chair

E. B. Lockhart, Commissioner

T. A. Loski, Commissioner

 

on October 20, 2021

 

ORDER

WHEREAS:

 

A.      On June 1, 2021, Oakridge Energy LP/GP Inc. (Oakridge Energy) submitted an application to the British Columbia Utilities Commission (BCUC) pursuant to sections 45 and 46 of the Utilities Commission Act seeking a Certificate of Public Convenience and Necessity (CPCN) to construct and operate a District Energy System (DES) for the provision of thermal energy service to the Oakridge Centre Redevelopment project in Vancouver, B.C. (Application);

B.      Oakridge Energy is a Limited Partnership of entities within the Corix Group of Companies and the Creative Energy group, established to meet the thermal energy needs of the Oakridge Centre Redevelopment project;

C.      The proposed DES has been designed as a low-carbon energy system that provides thermal energy through a combination of multiple heating and cooling energy sources, including a closed loop Geo-Exchange field, a waste heat recovery system, electric boilers, electric chillers, and natural gas boilers;

D.      By Order G-194-21 dated June 24, 2021, the BCUC established a regulatory timetable for the review of the Application, which included Oakridge Energy filing of further information, public notification, intervener registration, one round of BCUC and intervener information requests (IRs) and further process to be determined;

E.       By Order G-206-21 dated July 7, 2021, the BCUC amended the regulatory timetable in response to a request from Oakridge Energy to allow additional time for the filing of further information;

F.       On August 5, 2021, the BC Sustainable Energy Association registered as an intervener in the proceeding;

G.      By Order G-272-21 dated September 16, 2021, the BCUC amended the regulatory timetable in response to a request from Oakridge Energy to allow additional time for the filing of IR responses;

H.      On September 30, 2021, Oakridge Energy filed its responses to BCUC and intervener IRs; and

I.         The Panel determines establishing a further regulatory timetable is warranted.

 

NOW THEREFORE the BCUC orders that a further regulatory timetable for the review of the Application is established, as set out in Appendix A to this order.

 

 

DATED at the City of Vancouver, in the Province of British Columbia, this     20th      day of October 2021.

 

BY ORDER

 

Original signed by:

 

R. I. Mason

Commissioner

 

 

Attachment

 

 


Oakridge Energy LP/GP Inc.

Application for a Certificate of Public Convenience and Necessity for a District Energy System

 

REGULATORY TIMETABLE

 

 

Action

Date (2021)

BCUC and Intervener Information Request (IR) No. 2 to Oakridge Energy

Thursday, November 4

Oakridge Energy responses to BCUC and Intervener IR No. 2

Thursday, November 18

Oakridge Energy Written Final Argument

Thursday, November 25

Intervener Written Final Argument

Thursday, December 9

Oakridge Energy Written Reply Argument

Thursday, December 16

 

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.